Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-00728
StatusFinaled
Name IDAHO MATERIAL HANDLING
Site Address 651 E GOWEN RD
Project NameHayden Beverage Company
Customer Number 
ePlanReviewNo
Description
((HAYDEN BEVERAGE COMPANY**RACKING**) Permit to install 2 rows of racking for point of sale material 42 inches wide by 104 feet long with 12 foot isles between them with the max height to the top of the product being 16’ in an existing warehouse. Work to include: installation of prefabricated 16 foot tall storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 1979)**AJS** Tenant permit submitted under BLD13-00844.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/4/20138/5/2013 DONE
Third Notice 7/7/20137/30/2013 DONE
mailed
Third Notice 6/8/20137/2/2013 DONE
faxed
Second Notice 6/13/20136/3/2013 DONE
First Notice4/30/20134/30/20136/3/2013 DONE
DetailsJim Storey
FIRE-Final Inspection4/29/20134/30/20134/30/2013APASS
DetailsForrest France
BLD-Final4/29/20134/29/20134/30/2013PPASS
DetailsJim Storey
Jeff Collins-Please call prior to insepction Phone #: ###-####
DOC - Permit Finaled4/30/20134/30/20134/30/2013PPASS
DetailsJim Storey
BLD-Final4/29/20134/29/20134/29/2013PPASS
DetailsForrest France
Okay for final per 301
Issue PAID IN FULL permit  4/24/2013 DONE
Plan assigned to (AJS)4/11/20134/11/20134/22/2013 PASS
DetailsAdele J Schaffeld-Griffin
sent to Fire 4-15-11, my 1st review complet, Level 2 TI - Racking
Routing - PLAN CHECK4/17/2013 4/22/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  4/22/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/22/2013 DONE
DetailsAdele J Schaffeld-Griffin
Inspection Record Card- Bld  4/22/2013 DONE
DetailsChristina Prado
Telephone call  4/22/2013 DONE
DetailsTisha Gallop
Called Jeffrey and told him permit is ready, fee, and need GC/form
Permit Ready to Issue  4/22/2013 DONE
DetailsTisha Gallop
1st review completed  4/17/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Failed plan check.
Routing - FIRE4/15/2013 4/17/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Plan resubmittals received  4/16/2013  
Received 2 copies of Plan review report, 2 copies of ICC-ES Evaluation Report ESR-1917, 2 copies of sheet A-1 and taken and added to plans in fire
Routing - PLAN CHECK4/11/2013 4/15/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see plan review comments in documents
Application received 3/29/20134/10/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/10/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/10/2013 DONE
DetailsTisha Gallop
Intake Approval  4/10/2013 PASS
DetailsTim L. Woodard
Intake Approval  3/29/2013 FAIL
Need to start the C/O process first.
Pending Assignment by JCB4/10/2013    
DetailsJason Blais