Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-00745
StatusFinaled
Name MD PROPERTY INVESTMENTS LLC
Site Address 1922 S HILTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2070 sq. ft., one story (first story 2070 sq. ft) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 138 sq. ft. of covered patio/porch and a 912 sq. ft. attached garage per the approved plans, perecriptive enerfy, attached engineering, plan review report and any notations.R-1B zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/25/20162/26/20162/26/2016APASS
DetailsPhil Shearer
would like call ahead; Michael Phone #: ###-####
DOC - Permit Finaled2/26/20162/26/20162/26/2016PPASS
DetailsPhil Shearer
BLD-Final2/24/20162/25/20162/25/2016ANR
DetailsJim Storey
would like call ahead; Micheal Phone #: ###-#### exp fireplace permit no insp
BLD-Energy code compliance6/26/20146/26/20146/26/2014PPASS
DetailsTom Arcoraci
Mikchael Phone #: ###-####
BLD-Framing/Rough-in6/19/20146/20/20146/20/2014APASS
DetailsTom Arcoraci
Requests after 9 - Micheal Phone #: ###-####
BLD-Framing/Rough-in6/18/20146/18/20146/18/2014PNR
DetailsTom Arcoraci
MIchael Phone #: ###-####
BLD-Framing/Rough-in2/24/20142/24/20142/24/2014PNR
DetailsTom Arcoraci
michael Phone #: ###-####
BLD-Conference2/24/20142/24/20142/24/2014PPASS
DetailsTom Arcoraci
michael Phone #: ###-#### ok to wrap and side
BLD-Other1/13/20141/13/20141/13/2014PPASS
DetailsJim Sly
roof sheathing // Michael Phone #: ###-####
Plan resubmittals received  9/6/2013 DONE
new manual j
Routing - MECHANICAL9/6/2013 9/6/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Conference5/22/20135/22/20135/22/2013PPASS
DetailsTom Arcoraci
BLD-Foundation4/30/20135/1/20135/1/2013APASS
DetailsTom Arcoraci
John Phone #: ###-####
BLD-Footing4/29/20134/30/20134/30/2013APASS
DetailsTom Arcoraci
john Phone #: ###-####
Issue PAID IN FULL permit  4/18/2013 DONE
OVERRIDE  4/17/2013  
Plan assigned to (AJS)4/1/20134/1/20134/17/2013 PASS
DetailsAdele J Schaffeld-Griffin
1ST REVIEW COMPLETED
Routing - MECHANICAL4/17/2013 4/17/2013 PASS
DetailsTroy James
Case Summary (BLD)  4/17/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/17/2013 DONE
DetailsAdele J Schaffeld-Griffin
Inspection Record Card- Bld  4/17/2013 DONE
Telephone call  4/17/2013 DONE
DetailsChristina Prado
left message for Michael giving fees due and advising permit is ready for pick up pending Rp info
Permit Ready to Issue  4/17/2013 DONE
DetailsChristina Prado
Routing - MECHANICAL4/16/2013 4/16/2013 FAIL
DetailsTroy James
emailed correction to Musgrove
Plan resubmittals received  4/15/2013  
Received cover transmittal, 2 copies of calculations, 2 copies of sheets, M1.1, M1.2 and taken to Adele's desk to add to plans
1st review completed  4/9/2013 FAIL
DetailsAdele J Schaffeld-Griffin
needs mechanical approval
Routing - PLAN CHECK4/8/2013 4/9/2013 PASS
DetailsAdele J Schaffeld-Griffin
Adele
Routing - MECHANICAL4/3/2013 4/8/2013 FAIL
DetailsTroy James
emailed corrections to Michael Musgrove
Routing - PLANNING4/2/2013 4/3/2013 PASS
DetailsColleen T Carroll
Routing - PLANNING Land Div4/3/2013 4/3/2013 PASS
DetailsDave Abo
Parcel C of Record of Survey 9404.
Route to Impact Fee Review4/1/20134/4/20134/2/2013  
DetailsCindy M. Gould
Credit for demo of existing house
Routing - Addressing4/1/2013 4/2/2013 PASS
DetailsJason C. Taylor
Parcel numbers were corrected.
Routing - PUBLIC WORKS4/2/2013 4/2/2013 PASS
DetailsConnie Baumgartner
Application received 4/1/20134/1/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/1/2013 DONE
DetailsBarbara Stitt
Intake Approval  4/1/2013 FAIL
DetailsAlexandra L. DeYoung
Intake Approval  4/1/2013 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  4/1/2013 DONE
DetailsBarbara Stitt