Permanent Occupancy | | | 3/13/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/10/2014 | 3/12/2014 | 3/12/2014 | A | DONE |
Jim Storey
|
|
|
Raj Phone #: ###-#### 316
|
BLD-Final | 2/19/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Jim Sly
|
|
|
Windows in back - Craig Phone #: ###-####
|
FIRE-Final Inspection | 11/4/2013 | 11/5/2013 | 11/6/2013 | P | PASS |
Forrest France
|
|
|
Signage at the main door to be posted prior to structural final.
|
FIRE-Final Inspection | 4/9/2013 | 4/15/2013 | 4/15/2013 | P | FAIL |
Forrest France
|
|
|
Provide for conditions as indicated per plan review red-line annotations at both required exit doors.
|
Plan assigned to (CDM) | 4/9/2013 | 4/9/2013 | 4/9/2013 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/9/2013 | | 4/9/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/9/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/9/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/9/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/9/2013 | | |
|
|
|
|
Telephone call | | | 4/9/2013 | | |
|
|
|
4-9-13 called Parmeet Kaur left message permit ready for pick up ///dld
|
Issue PAID IN FULL permit | | | 4/9/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 4/3/2013 | | 4/9/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/3/2013 | | 4/9/2013 | | PASS |
Carl D Madsen
|
|
|
|
Application received | | 4/2/2013 | 4/3/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/3/2013 | | |
|
|
|
|
First Notice | | 3/23/2014 | | | |
|
|
|
|