BLD-Final | 10/15/2013 | 10/15/2013 | 10/16/2013 | P | PASS |
Dave Hannah
|
|
|
John-Please call at least 30 mins prior to insepction Phone #: ###-####
|
DOC - Permit Finaled | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | FAIL |
Dave Hannah
|
|
|
john - call prior Phone #: ###-#### windows that are less than 24" off floor and 70" above ext grade can not open more than 4"
|
PubWorks Occupancy Approval | 10/14/2013 | 10/14/2013 | 10/14/2013 | | DONE |
Jason C. Taylor
|
|
|
Project complete. Public Works approves occupancy for grading & drainage. Jason Taylor ###-####
|
BLD-Energy code compliance | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | PASS |
Dave Hannah
|
|
|
John-Please call prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 8/2/2013 | 8/2/2013 | 8/5/2013 | P | PART |
Dave Hannah
|
|
|
call when on way...john Phone #: ###-#### fire blocking basement walls ok to insulate.
|
BLD-Wall Bracing | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Dave Hannah
|
|
|
Shear inspection-John Phone #: ###-####
|
BLD-Wall Bracing | 7/22/2013 | 7/23/2013 | 7/23/2013 | P | CANC |
Dave Hannah
|
|
|
Please call ahead for access - John Phone #: ###-####
|
BLD-Foundation | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Dave Hannah
|
|
|
found wall//Curt Phone #: ###-####
|
BLD-Footing | 5/14/2013 | 5/14/2013 | 5/15/2013 | P | PASS |
Dave Hannah
|
|
|
curt Phone #: ###-####
|
PubWorks Subgrade Approval | 5/15/2013 | 5/15/2013 | 5/15/2013 | | DONE |
Jason C. Taylor
|
|
|
Received notification for geotechncial engineer approving subgrade for column areas. Building department may be scheduled for fotting inspections. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 5/8/2013 | 5/8/2013 | 5/8/2013 | | PART |
Jason C. Taylor
|
|
|
Footing subgrade inspection report was recieved from geothechnical engineer. Inspection consited of all footings for the residence and the garage area. Inspection DID NOT include column/stoop areas, this will need to be inspected prior to placement of those elements. Jason Taylor ###-####
|
Issue PAID IN FULL permit | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 4/24/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 4/2/2013 | 4/24/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1sr review complete / Hillside
|
Routing - PLAN CHECK | 4/23/2013 | | 4/24/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 4/24/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 4/24/2013 | | DONE |
Tisha Gallop
|
|
|
called Bruno Built Homes and told recep. permit is ready and fee.
|
Permit Ready to Issue | | | 4/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 4/23/2013 | | 4/23/2013 | | PASS |
Scott Arellano
|
|
|
Fire Sprinkler are required as an approved Fire Code alternate to Fire Department vehicle access.
|
Routing - PLAN CHECK | 4/10/2013 | | 4/17/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan review letter emailed see documents for letter
|
1st review completed | | | 4/17/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emaild robert 4-17-13
|
Routing - Erosion and Sediment | 4/9/2013 | | 4/10/2013 | | PASS |
Kimberly M. Johnson
|
|
|
approved per redlines.
|
Routing - FIRE | 4/10/2013 | | 4/10/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed applicant resumbittal items.
|
Routing PW Grading-Hillside | 4/2/2013 | | 4/10/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 4/9/2013 | | 4/9/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 4/8/2013 | | DONE |
Christina Prado
|
|
|
received three sets of plans marked sheet 1 & 2 Site Grading & Drainage Plan; given to Adele for further review
|
Routing - MECHANICAL | 4/4/2013 | | 4/8/2013 | | FAIL |
Troy James
|
|
|
need to fix orientation
|
Route to Impact Fee Review | 4/2/2013 | 4/5/2013 | 4/4/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 4/4/2013 | | 4/4/2013 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2013 | | 4/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/2/2013 | | 4/3/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/2/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/2/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/2/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/2/2013 | | | |
|
|
|
|