BLD-Final | 8/6/2013 | 8/6/2013 | 8/6/2013 | P | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2013 | 8/6/2013 | 8/6/2013 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 8/5/2013 | 8/5/2013 | 8/5/2013 | | DONE |
Jason C. Taylor
|
|
|
Roof drains are acceptable. No drainage should cross property lines as the sites existing grading is acceptable. Jason Taylor ###-####
|
BLD-Final | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | NR |
Tom Arcoraci
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 5/31/2013 | 5/31/2013 | 6/3/2013 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-#### phase three of roof ok to cover
|
BLD-Framing/Rough-in | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Dave Hannah
|
|
|
David Phone #: ###-#### phase two ok to cover
|
BLD-Framing/Rough-in | 4/29/2013 | 5/1/2013 | 5/1/2013 | P | PART |
Tom Arcoraci
|
|
|
stephen Phone #: ###-#### west side ok
|
Routing Walk-In (BLD) | 4/19/2013 | 4/19/2013 | 4/23/2013 | A | PASS |
Perry Paine
|
|
|
Romeo needs to make decision
|
Routing Walk-In (PW Hillside) | 4/3/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Jason C. Taylor
|
|
|
Roof gutters to be tied into existing system (where exists). Section of roof that has no stormdrain system is to daylight onto existing yard grass. Drainage approval required by Public Works (Jason Taylor ###-####)
|
Routing Walk-In (Zoning) | 4/3/2013 | 4/3/2013 | 4/3/2013 | A | |
|
|
|
|
Routing Walk-In (BLD) | 4/3/2013 | 4/3/2013 | 4/3/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/3/2013 | 4/3/2013 | 4/3/2013 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 4/3/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/3/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2013 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2013 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 4/3/2013 | | | |
|
|
|
|