Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-00784
StatusFinaled
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3795 N WOODY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2435 sq. ft., 2 story (first story 1208 sq. ft, second story 1227 sq. ft.) Townhouse with 2 bedrooms, 2 1/2 bathrooms, approximately 138 sq. ft. of covered patio/porch and a 484 sq. ft. attached garage per the approved plans, attached engineering, Res Check on plans, attached WP3910, plan review report and any notations. R-1C/DA zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/29/2015 DONE
pass 12-4-13
BLD-Final12/4/201312/4/201312/4/2013PPASS
DetailsTony Young
Dan Phone #: ###-####
BLD-Final11/30/201312/2/201312/2/2013APEND
DetailsTony Young
Please call ahead for access - Dan Phone #: ###-####,, WALK THROUGH,, NEEDS ZONING,, FIRE CAULKING,, TEMPERED GLASS IN UPPER WINDOW NEXT TO THE DOOR TO BALCONY
Zoning Approval12/2/201312/2/201312/2/2013 PASS
DetailsSarah Schafer
BLD-Final11/29/201311/29/201311/30/2013PPEND
DetailsTony Young
Please call ahead for access - Dan Phone #: ###-####
Elevation Cert Rec'd-Final  11/27/2013 PASS
BLD-Energy code compliance10/1/201310/2/201310/2/2013APASS
DetailsTony Young
dan Phone #: ###-####
BLD-Framing/Rough-in9/30/201310/1/201310/1/2013APASS
DetailsTony Young
dan Phone #: ###-####
BLD-Energy code compliance9/11/20139/11/20139/12/2013PPART
DetailsTony Young
Dan Phone #: ###-####,, party wall
BLD-Wall Bracing8/27/20138/27/20138/28/2013PDONE
DetailsTony Young
BLD-Other8/26/20138/27/20138/28/2013ADONE
DetailsTony Young
roof nailing - Dan Phone #: ###-####
BLD-Framing/Rough-in7/29/20137/29/20137/29/2013PPASS
DetailsTony Young
dan Phone #: ###-####,, lower demising wall ok
BLD-Foundation6/21/20136/24/20136/24/2013APART
DetailsTony Young
###-#### Late am please Dan
Override - Parcel Holds  6/21/2013  
Override - Parcel Holds  6/21/2013  
BLD-Foundation6/12/20136/12/20136/12/2013PNR
DetailsMike Jordan
Re-bar ###-#### Dan
Override - Parcel Holds  6/12/2013  
Override - Parcel Holds  6/12/2013  
BLD-Footing6/3/20136/4/20136/4/2013APART
DetailsTony Young
late am//Dan Phone #: ###-####
BLD-Footing6/3/20136/3/20136/3/2013ACANC
DetailsTony Young
Re-bar inspection-Late am please Dan
Override - Parcel Holds  6/3/2013  
Override - Parcel Holds  6/3/2013  
OVERRIDE  5/13/2013  
OVERRIDE  5/13/2013  
OVERRIDE  5/13/2013  
OVERRIDE  5/13/2013  
OVERRIDE  5/13/2013  
OVERRIDE  5/13/2013  
Telephone call  5/13/2013 DONE
DetailsBarbara Stitt
Called Dave and told him that permits are ready on 5-13-13 @ 8:45am//BAS
Override - Parcel Holds  5/13/2013  
Override - Parcel Holds  5/13/2013  
Issue PAID IN FULL permit  5/13/2013 DONE
DetailsBarbara Stitt
Override - Parcel Holds  5/13/2013  
Override - Parcel Holds  5/13/2013  
Permit Ready to Issue  5/13/2013 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)4/4/20134/4/20135/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed/ Town House/Adele
Routing - PLAN CHECK5/10/2013 5/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  5/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/10/2013 DONE
Inspection Record Card- Bld  5/10/2013 DONE
DetailsChristina Prado
Routing - MECHANICAL5/9/2013 5/9/2013 PASS
DetailsTroy James
Plan resubmittals received  5/9/2013 DONE
DetailsChristina Prado
received one sets of response letter, one set of revised engineering and two sets of plans A0.1, A0.2, SD1.1, S1.1, S2.1, S2.2, S5.1, S7.1, S7.2, A1.1, A1.2, A2.1, A4.1, A4.2, A5.1, A6.1, A6.2, A6.3, A6.4, A6.5, A8.1, A8.2, A8.3 & EN1.1;Taken to Adele for review
Routing PW Flood Plain5/1/2013 5/2/2013 PASS
DetailsJim Wyllie
Prior to receiving a framing inspection, applicant shalll submit a second Elevation Certificate (EC) based upon "Building Under Construction. Prior to receiving final occupancy, applicant shall submit a third EC based upon "Finished Construction". Jim Wyllie (###-####)
Plan resubmittals received  5/1/2013 DONE
DetailsTisha Gallop
received Pre-Elevation Certifiate and one copy of plan sheet 1 of 2 (grading plan); taken to Adele
Routing PW Flood Plain4/18/2013 4/25/2013 FAIL
DetailsJim Wyllie
Please see floodplain comments as noted in BLD13-00781. Jim Wyllie (###-####)
1st review completed  4/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
building review completed/ did not get routed to all departments at intake
Routing - PLAN CHECK4/12/2013 4/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see documents for letter/ Adele
Routing - Erosion and Sediment4/19/2013 4/19/2013 PASS
DetailsKimberly M. Johnson
Approved with redlines. Note this plan does not meet federal SWPPP requirements
Routing - MECHANICAL4/10/2013 4/14/2013 FAIL
DetailsTroy James
Need manaul j report for all units
Emailed building energy. He was not given the contract to do this job. He was only asked to do one unit to verify equipment size. He was not aware of his report being submitted for review.
Route to Impact Fee Review4/3/20134/8/20134/12/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING4/5/2013 4/10/2013 PASS
DetailsJosh Wilson
DRH13-00018-Josh Wilson
Routing - Addressing4/5/2013 4/5/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS4/5/2013 4/5/2013 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  4/4/2013 DONE
DetailsBarbara Stitt
Intake Approval  4/4/2013 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  4/4/2013 DONE
DetailsBarbara Stitt
Application received 4/3/20134/3/2013 DONE
DetailsBarbara Stitt
Intake Approval  4/3/2013 FAIL
DetailsBarbara Stitt