First Notice | | 6/1/2013 | 6/7/2013 | | DONE |
|
|
|
final value calcd with Bld13-00862, all additional fees put on this permit.
|
Print Statement | | | 6/7/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Hansen-Rice
|
FIRE-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
BLD-Final | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/21/2013 | 5/21/2013 | 5/22/2013 | P | FAIL |
Jim Storey
|
|
|
Bill-around 3:00 if possible please Phone #: ###-#### reviewed with arch. and sturc. engineer. conections,bearing and support of roof not installed per design. north header at entry apears to need evaluation for loadind. unabe to access west tenent space to verify cmu bolts.
|
Permanent Occupancy | | | 5/22/2013 | | DONE |
|
|
|
|
BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | FAIL |
Jim Storey
|
|
|
Contact is Adam Yee ###-####. If possible please call me with an estimated time of when the inspection will take place. Phone #: ###-#### >> Inspection requested via web by Adam Yee open mec13-01583 needs insp. and signoff. ok pending sign off.
|
BLD-Framing/Rough-in | 4/21/2013 | 4/22/2013 | 4/22/2013 | A | PASS |
Tom Arcoraci
|
|
|
One wall to inspect the framing on that separates the TI spaces. The contact for the subcontractor performing the work is Corey 2082498045. The contact for the GC is Adam Yee 2088698292. The contact for the building manager is Bonne 2083869170. She has the plans and permits in her office. Phone #: ###-#### >> Inspection requested via web by Adam Yee
|
Print Occupancy Form | | | 4/15/2013 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2013 | | DONE |
Christina Prado
|
|
|
called Adam to advise permit is ready pending GC information and gave fees due
|
Permit Ready to Issue | | | 4/15/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/5/2013 | | 4/12/2013 | | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 4/9/2013 | | 4/12/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/12/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/12/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/5/2013 | | 4/9/2013 | | DEFR |
Tim L. Woodard
|
|
|
Plans defered to Carl M. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2013 | | |
|
|
|
ok per Tim W to takenin as a level 1
|
Application received | | 4/5/2013 | | | |
|
|
|
|