BLD-Final | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Mike Jordan
|
|
|
Ivan Phone #: ###-####
|
DOC - Permit Finaled | 1/3/2014 | 1/3/2014 | 1/3/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 7/10/2013 | 7/11/2013 | 7/11/2013 | P | PASS |
Mike Jordan
|
|
|
request 4 - Ivan Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2013 | 7/8/2013 | 7/8/2013 | P | FAIL |
Mike Jordan
|
|
|
framing and wall bracing//Ivan Phone #: ###-####. Needs to frame per the engineered drawings.
|
BLD-Footing | 5/31/2013 | 6/3/2013 | 6/3/2013 | A | CANC |
Mike Jordan
|
|
|
Ivan Phone #: ###-####
|
BLD-Foundation | 6/3/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Mike Jordan
|
|
|
Ivan Phone #: ###-####
|
BLD-Footing | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Mike Jordan
|
|
|
ivan Phone #: ###-####
|
BLD-Conference | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | DONE |
Mike Jordan
|
|
|
Ivan Phone #: ###-####. Spoke to homeowner about footing depths. Appears tha footing excavation is not deep enough.
|
OVERRIDE | | | 5/1/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/1/2013 | 5/1/2013 | 5/1/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/1/2013 | 5/1/2013 | 5/1/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2013 | | |
|
|
|
|
1st review completed | | | 5/1/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 4/9/2013 | 4/9/2013 | 4/9/2013 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/9/2013 | 4/9/2013 | 4/9/2013 | P | FAIL |
Perry Paine
|
|
|
need tall wall info
|
Application received | | 4/9/2013 | | | |
|
|
|
|