BLD-Final | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Dave Hannah
|
|
|
nancy Phone #: ###-####
|
Application received | | 4/9/2013 | 9/10/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety passed pending items discussed to be finished prior to structural final including; adjustment to the opening force at the south set of double doors, replace missing access panel, general housekeeping items. Any modifications to the hood suppression system will require a permit if the cook line appliances are changed.
|
BLD-Final | 9/4/2013 | 9/5/2013 | 9/5/2013 | A | CANC |
Dave Hannah
|
|
|
nancy -this inspection for occupancy Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 9/4/2013 | 9/4/2013 | 9/5/2013 | P | FAIL |
Forrest France
|
|
|
C/N items include; repair non-functional exit signs and EM lights, post max. occupant load signage, provide access to the locked office room for inspection, replace missing ceiling tile and access panel at the janitors closet, post K class PFE as discussed.
|
Issue PAID IN FULL permit | | | 8/19/2013 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 5/9/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/23/2013 | | 4/25/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/25/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
called Nancy to advise permit is ready for pick up
|
Permit Ready to Issue | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 4/9/2013 | | 4/25/2013 | | PASS |
Tim L. Woodard
|
|
|
1st Review Completed.
|
Routing PW Environmental | 4/23/2013 | | 4/23/2013 | | PASS |
Walt Baumgartner
|
|
|
Applicant required to ensure under counter grease trap is functional and properly maintained. A future change in menu or kitchen equipment may require additional pretreament equipment.
|
Routing - PUBLIC WORKS | 4/23/2013 | | 4/23/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 4/12/2013 | | 4/12/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved. Waiting on resubmittals for Walt B.
|
1st review completed | | | 4/12/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | | | 4/12/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Walt Baumgartner for pretreatment.
|
Routing PW Environmental | 4/10/2013 | | 4/10/2013 | | FAIL |
Walt Baumgartner
|
|
|
No indication on plans with regard to grease abatement. Will need to review a menu and clarify kitchen fixtures in use. Contact made w/ applicant.
|
Routing - Addressing | 4/9/2013 | | 4/10/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 4/10/2013 | | 4/10/2013 | | PASS |
Connie Baumgartner
|
|
|
|