| Second Notice | | 3/10/2014 | 3/10/2014 | | DONE |
|
|
|
owner is in legal preceedings with GC who left before the job was completed. Owner is unable to provice accurate final values.
|
| First Notice | | 2/17/2014 | 2/28/2014 | | DONE |
Christina Prado
|
|
|
Per tenant in office when received perm occ. Diamond B Cont. not on job, best contact for final values is owner, contact is Eve Chandler. Leave Eve as primary so notices to go her.
mailed 2/28
|
| Permanent Occupancy | | | 2/7/2014 | | DONE |
Tisha Gallop
|
|
|
|
| BLD-Aging Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 | | DEFR |
Jim Storey
|
|
|
final ok pending plm sign off.
|
| BLD-Final | 11/13/2013 | 11/13/2013 | 11/14/2013 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-#### final ok pending plm sign off.
|
| Temporary Occupancy | 11/14/2013 | 2/12/2014 | 11/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
| Zoning Approval | 11/14/2013 | 11/14/2013 | 11/14/2013 | | PASS |
Josh Wilson
|
|
|
|
| BLD-Final | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | DEFR |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
| FIRE-Final Inspection | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Craig D. Hanson
|
|
|
no corrections.
|
| BLD-Other | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | NR |
Jim Storey
|
|
|
Life/Safety final >> Inspection requested via web by Toni Brown
|
| BLD-Other | 11/11/2013 | 11/12/2013 | 11/12/2013 | A | DEFR |
Jim Storey
|
|
|
Public Works final Phone #: ###-#### >> Inspection requested via web by Toni Brown to permit desk
|
| FIRE-Conference | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding conditions for fire life safety and occupancy approval. Discussed fire code review note items, project schedule, hood permit, etc.
|
| BLD-Other | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Jim Storey
|
|
|
This is for an above ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Toni Brown ceilling ok
|
| FIRE-Conference | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | DONE |
Troy Cobbley
|
|
|
Follow up with Mark Brown on the hood suppresion system
|
| BLD-Energy code compliance | 9/19/2013 | 9/20/2013 | 9/20/2013 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Toni Brown walls ok ceilling in progress.
|
| BLD-Framing/Rough-in | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Toni Brown
|
| BLD-Wall Bracing | 9/10/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-#### exterior ok to cover and roof
|
| CHANGE STATUS TO (ISS) | | | 9/5/2013 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for approved plan mod
|
| OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
| Plan assigned to (JCM) | 8/28/2013 | 8/28/2013 | 9/4/2013 | | PASS |
John Menard
|
|
|
|
| Routing - MECHANICAL | 9/3/2013 | | 9/4/2013 | | PASS |
Troy James
|
|
|
|
| Routing - PLAN CHECK | 9/4/2013 | | 9/4/2013 | | PASS |
John Menard
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2013 | | DONE |
John Menard
|
|
|
|
| Print Occupancy Form | | | 9/4/2013 | | DONE |
|
|
|
|
| Telephone call | | | 9/4/2013 | | DONE |
Christina Prado
|
|
|
called greg to advise permit is ready and gave fees due
|
| Permit Ready to Issue | | | 9/4/2013 | | DONE |
Christina Prado
|
|
|
|
| Routing - MECHANICAL | 9/3/2013 | | 9/3/2013 | | FAIL |
Troy James
|
|
|
called mechanical contractor to provide new comcheck for additional mechanical unit.
|
| Plan Modification Accepted | | | 8/28/2013 | | DONE |
Tisha Gallop
|
|
|
plan modification accepted for complete change of mechanical layout. Changed to (2) 5-ton single phase RTU from (1) 10-ton 3-phase RTU; submitted on plan sheet M-1 and revised cert of value; routed to John Menard.
|
| BLD-Foundation | 7/11/2013 | 7/11/2013 | 7/12/2013 | P | NR |
Jim Storey
|
|
|
Dane Phone #: ###-#### forms not set rebar just started/ si to insp. if placing late pending report. hot dip anchor bolts spected ?
|
| BLD-Footing | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Jim Storey
|
|
|
dane Phone #: ###-####
|
| BLD-Footing | 7/9/2013 | 7/9/2013 | 7/9/2013 | P | CANC |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
| Issue PAID IN FULL permit | | | 6/14/2013 | | DONE |
|
|
|
|
| OVERRIDE | | | 6/5/2013 | | |
|
|
|
|
| Print Occupancy Form | | | 6/5/2013 | | DONE |
|
|
|
|
| Telephone call | | | 6/5/2013 | | DONE |
Christina Prado
|
|
|
called Eve to advise permit is ready for pick up pending CG & ACHD - also gave fees due
|
| Permit Ready to Issue | | | 6/5/2013 | | DONE |
Christina Prado
|
|
|
|
| Routing - PUBLIC WORKS | 6/3/2013 | | 6/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
| Routing PW Sewer Design | 6/3/2013 | | 6/4/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
| Routing - PLAN CHECK | 6/4/2013 | | 6/4/2013 | | PASS |
John Menard
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2013 | | DONE |
John Menard
|
|
|
|
| Plan assigned to (JCM) | 4/12/2013 | | 6/4/2013 | | PASS |
John Menard
|
|
|
1st Review completed 5/1/2013
|
| Routing - PLAN CHECK | 5/30/2013 | | 6/3/2013 | | |
John Menard
|
|
|
|
| Plan resubmittals received | | | 6/3/2013 | | DONE |
Tisha Gallop
|
|
|
received response from Engineer regarding sanitary sewer comments and five copies of plan sheet C1.4; inserted into plans by LEG and routed to Public Works
|
| Routing - PUBLIC WORKS | 5/28/2013 | | 5/30/2013 | | FAIL |
Beverly Mountain
|
|
|
Failed Kyle Sewer Engineering.
|
| Routing PW Sewer Design | 5/29/2013 | | 5/30/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Sewer note required for tap permit, Angle of tap in R/W required to be 90 degrees.
|
| Routing PW Drainage | | | 5/30/2013 | | PASS |
Brian Murphy
|
|
|
|
| Plan resubmittals received | | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
Received three sets response letter addressed to John Menard, three sets revised structural calcs, five sets of grading & drainage sheets marked C1.2, C1.3, C1.4 & C2 as well as three sets reviswed plan sheets marked T1.0, C1.2, C1.3, C1.4, C2, A0.0, A1.0, A7.0, S0.1, S1.1, S2.1, S5.1, S7.1, m-1, m-2, m-3, P0.1, P1.1, E1.0, E2.0, E3.0 & E4.0. PLans instered by arch rep and taken back to John for review
|
| Routing - PLAN CHECK | 5/16/2013 | | 5/28/2013 | | |
John Menard
|
|
|
|
| Plan resubmittals received | | | 5/23/2013 | | DONE |
Tisha Gallop
|
|
|
received engineering response, two copies of Storm Water System report, Calcs and Soild Report, and five copies of plan sheets C1, C1.1, C1.2, C1.3, C1.4, C2; inserted by permit tech and taken back to John Menard.
|
| Routing PW Drainage | 5/7/2013 | | 5/16/2013 | | FAIL |
Brian Murphy
|
|
|
needs s engineer letter
|
| Routing - PUBLIC WORKS | 5/6/2013 | | 5/16/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy for drainage issues and Kyle Rosenmeyer for sewer design.
|
| Routing PW Sewer Design | 5/6/2013 | | 5/7/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Show point of connection to public sewer. Spoke with BA Engineers 5/7.
|
| Routing - FIRE | 5/1/2013 | 5/1/2013 | 5/6/2013 | | PASS |
Scott Arellano
|
|
|
With conditions
|
| Routing - PLAN CHECK | 5/2/2013 | | 5/6/2013 | | |
John Menard
|
|
|
|
| Telephone call | | | 5/6/2013 | | DONE |
Jason Blais
|
|
|
Telephone call with owner Eve Chandler on correction items outstanding and the need for the registered architect to be in responsible charge of the project as required by code.
|
| Route to Impact Fee Review | 5/1/2013 | 5/6/2013 | 5/3/2013 | | PASS |
Cindy M. Gould
|
|
|
|
| 1st review completed | | | 5/2/2013 | | FAIL |
|
|
|
Failed - Plan Check
|
| Plan resubmittals requested | | | 5/1/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
| Plan resubmittals received | | | 5/1/2013 | | DONE |
Christina Prado
|
|
|
Received one set of plans marked C1, C1.1, C1.2, C1.3 & C2 as well as one set storm water report and O& M; plans inserted into plan sheets and taken back to fire review
|
| Routing - PLAN CHECK | 4/30/2013 | | 5/1/2013 | | FAIL |
John Menard
|
|
|
John Menard
|
| Routing - PLANNING | 4/26/2013 | | 4/30/2013 | | PASS |
Josh Wilson
|
|
|
DRH13-00004 Josh W.
|
| Routing - PLUMBING | 4/25/2013 | | 4/26/2013 | | PASS |
Daryl Spivey
|
|
|
Venting does not meet cross sectional area venting requirements. Increase to meet requirements.
Mop sink to drain to grease waste line.
|
| Routing - Erosion and Sediment | 4/24/2013 | | 4/25/2013 | | PASS |
Kimberly M. Johnson
|
|
|
approved with redlines
|
| Routing PW Sewer Rating | 4/24/2013 | | 4/24/2013 | | PASS |
Connie Baumgartner
|
|
|
|
| Routing PW Environmental | 4/24/2013 | | 4/24/2013 | | PASS |
Walt Baumgartner
|
|
|
Route mop sink to grease line.
|
| Routing - PUBLIC WORKS | 4/15/2013 | | 4/24/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy and Kyle Rosenmeyer
|
| Routing PW Solid Waste | 4/24/2013 | | 4/24/2013 | | PASS |
Peter J. McCullough
|
|
|
|
| Plan resubmittals requested | | | 4/24/2013 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the structural comments requesting revisions. JCM
|
| Routing PW Sewer Design | 4/17/2013 | | 4/23/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Sewer Services - Show point of connection to public sewer.
|
| Routing Off Site - STRUCTURAL | 4/12/2013 | | 4/22/2013 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revsions. JCM
|
| Routing PW Drainage | 4/16/2013 | | 4/17/2013 | | FAIL |
Brian Murphy
|
|
|
need calc and st eng letter
|
| Routing - Addressing | | | 4/16/2013 | | PASS |
Jason C. Taylor
|
|
|
|
| Routing - PLANNING Land Div | 4/12/2013 | | 4/15/2013 | | PASS |
Todd Tucker
|
|
|
|
| Application received | | 4/10/2013 | 4/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
| Pending Assignment by JCM | 4/12/2013 | | 4/12/2013 | | DONE |
John Menard
|
|
|
|
| Plans ACCEPTED BY PLAN TECH | | | 4/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 4/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
| Telephone call | | | 4/12/2013 | | DONE |
Tisha Gallop
|
|
|
Called Action Couriers for pick up
|