Permit Information
Permit NumberBLD13-00842
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameST. AL - R.M.C North Tower 2nd
Customer Number 
ePlanReviewNo
Description
(ST. ALPHONSUS - R.M.C North Tower 2nd Floor – Endovascular Hybrid Room) This permit is to renovate an existing equipment storage room on the second floor to become an exam room. PLAN MODIFICATION 9-19-13 – Modification submitted to expand vestibule and change ceiling type in lab. This mod also includes associated mechanical, electrical, and plumbing changes. **TLW** Approval per approved plans on file and attached engineering. Work to include: [construction of interior non-bearing walls to create two vestibules, a control room, and an endovascular lab], create and modify openings in existing smoke barrier walls, structural work to improve deflection on existing 3rd floor joists, installation of new specialized equipment, installation of new accessible doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice11/25/201311/25/201312/3/2013 DONE
DetailsTom Arcoraci
This permit finaled on the web by Brandon Byington
BLD-Final11/25/201311/25/201311/25/2013PPASS
DetailsTom Arcoraci
Cecil Phone #: ###-####
DOC - Permit Finaled11/25/201311/25/201311/25/2013PPASS
DetailsTom Arcoraci
FIRE-Final Inspection10/29/201310/30/201310/30/2013APASS
DetailsTroy Cobbley
life safety passed
(F) Reprint permit  10/29/2013 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  10/29/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)8/21/2013 9/19/2013 PASS
DetailsTim L. Woodard
Plan Modification
PLANS/APPL TAKEN TO FRONT DESK  9/19/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/19/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  9/19/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  9/19/2013 DONE
Telephone call  9/19/2013 DONE
lm for sam permit ready fees given
Routing - PLUMBING8/26/2013 9/3/2013 PASS
DetailsDaryl Spivey
Per plans and ISPC.
Routing - PUBLIC WORKS8/26/2013 8/27/2013 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK8/26/2013 8/26/2013 PASS
DetailsTim L. Woodard
Plan Modification Accepted  8/21/2013 DONE
DetailsTisha Gallop
Plan Modification accepted in response to the State's review comments the ceiling in the lab is now suspended gyp. board and expand the east vestibule to accommodate substerile functions; submitted on plan sheets A0.0, A0.1, A2.0, A3.0, A6.0, A7.0, S1.0, S2.0, M0.0, M0.1, M1.1, M1.2, M2.1, M3.1, M3.2, M4.1, FP1.1, E0.0, E2.1D, E2.1FL, E2.1M, E2.2E, E2.2, E2.3, E3.0, E4.0, and revised cert of value; routed to Tim Woodard.
Issue PAID IN FULL permit  5/23/2013 DONE
DetailsTisha Gallop
Case Summary (BLD)  4/25/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  4/25/2013 DONE
DetailsChristina Prado
Telephone call  4/25/2013 DONE
DetailsTisha Gallop
called Sam Burrows and left vm permit is ready, fee and need GC/form.
Permit Ready to Issue  4/25/2013 DONE
DetailsTisha Gallop
Plan assigned to (TLW)4/10/2013 4/24/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/18/2013 4/24/2013 PASS
DetailsTim L. Woodard
1st review completed  4/24/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/24/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/24/2013 DONE
DetailsTim L. Woodard
Routing - PLUMBING4/17/2013 4/18/2013 PASS
DetailsDaryl Spivey
Per plans and 2009 ISPC.
Routing - PLAN CHECK4/12/2013 4/17/2013 PEND
DetailsTim L. Woodard
Routed to Plumbing for review. TLW
Routing - PUBLIC WORKS4/10/2013 4/12/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/12/2013 4/12/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental4/12/2013 4/12/2013 PASS
DetailsWalt Baumgartner
Reviewed by Rick Christenson.
Routing - Addressing4/10/2013 4/11/2013 PASS
DetailsJason C. Taylor
Application received 4/10/20134/10/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/10/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/10/2013 DONE
DetailsTisha Gallop