Case Summary (BLD) | | | 5/10/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/10/2016 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 11/22/2013 | 11/22/2013 | 11/22/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved final approval letter for site grading and drainage from the civil engineer (Briggs). Project is approved for occupancy by P.W. Jason Talyor ###-####
|
BLD-Conference | 11/20/2013 | 11/21/2013 | 11/21/2013 | A | DONE |
Dave Hannah
|
|
|
JOEY Phone #: ###-####
|
BLD-Other | 9/3/2013 | 9/4/2013 | 9/4/2013 | A | PASS |
Dave Hannah
|
|
|
fire soffits - joey Phone #: ###-####
|
BLD-Energy code compliance | 8/15/2013 | 8/15/2013 | 8/16/2013 | P | PASS |
Dave Hannah
|
|
|
JOEY Phone #: ###-####
|
BLD-Energy code compliance | 8/16/2013 | 8/16/2013 | 8/16/2013 | A | PASS |
Dave Hannah
|
|
|
JOEY Phone #: ###-####
|
BLD-Wall Bracing | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Dave Hannah
|
|
|
joey Phone #: ###-####
|
BLD-Framing/Rough-in | 8/9/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Dave Hannah
|
|
|
joey Phone #: ###-####
|
BLD-Framing/Rough-in | 8/12/2013 | 8/12/2013 | 8/15/2013 | P | PART |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/13/2013 | 8/13/2013 | 8/15/2013 | A | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/8/2013 | 8/9/2013 | 8/9/2013 | P | CANC |
Dave Hannah
|
|
|
Joey Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 | P | CANC |
Dave Hannah
|
|
|
Joey Phone #: ###-####
|
Plan resubmittals received | | | 7/31/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 7/31/2013 | | 7/31/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 5/14/2013 | 5/15/2013 | 5/15/2013 | A | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Footing | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
PubWorks Subgrade Approval | 5/13/2013 | 5/13/2013 | 5/13/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval for all main building and secondary garage foundations, also exterior (front and rear) column pads. Building department can be scheduled for footing inspections. Jason Taylor ###-####
|
BLD-Footing | 5/10/2013 | 5/10/2013 | 5/10/2013 | P | FAIL |
Jim Sly
|
|
|
Jared Phone #: ###-#### Need subgrade approval.
|
Issue PAID IN FULL permit | | | 5/9/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 5/2/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 4/16/2013 | 4/16/2013 | 5/2/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed. Due 5/2 Hillside
|
Routing - PLAN CHECK | 4/22/2013 | | 5/2/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 5/2/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2013 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2013 | | DONE |
Christina Prado
|
|
|
called Gary to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 5/2/2013 | | DONE |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 5/1/2013 | | 5/1/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 4/30/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of plan sheets marked A5.1 as well as two sets of reviced structural calcs; Taken to Adele for further review
|
Telephone call | | | 4/30/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Gary, let him know that Hill side had not recieved the revisions.
|
Routing - PLAN CHECK | 4/24/2013 | | 4/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent 4/25/13 comments in doucments
|
1st review completed | | | 4/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see comments in documents
|
Routing - FIRE | 4/23/2013 | | 4/24/2013 | | PASS |
Scott Arellano
|
|
|
Per subdivsion plat note #12, all dwellings on lot's 16-23 on block #6, shall be fire sprinklered in accordance with NFPA 13D.
|
Routing - Erosion and Sediment | 4/19/2013 | | 4/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 4/18/2013 | | 4/19/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/16/2013 | 4/19/2013 | 4/18/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 4/16/2013 | | 4/18/2013 | | PASS |
David Moser
|
|
|
Approved as redlined; The second kitchen in the guest suite shall be removed including the electrical to support a stove. This permit does not include a pool.
|
Routing - Addressing | 4/16/2013 | | 4/16/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2013 | | 4/16/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 4/16/2013 | | 4/16/2013 | | FAIL |
Jason C. Taylor
|
|
|
(Category 1 -new - easy)(Please route back to PW)
Missing geotechnical engineering report (for subdivision), grading plans need revised.
|
Intake Approval | | | 4/15/2013 | | FAIL |
|
|
|
1) need application
2) need 3 full sheets incorporated into plans + 1 extra copy of site grading & drainage plans
3)need full size sheets of ESC plan
4) need stair section detail
|
Intake Approval | | | 4/15/2013 | | PASS |
|
|
|
|
BLD-Final | 11/20/2013 | 11/22/2013 | | A | |
Mike Jordan
|
|
|
JOEY Phone #: ###-####
|
Application received | | 4/15/2013 | | | |
|
|
|
|