Third Notice | | 3/8/2015 | 4/6/2015 | | DONE |
|
|
|
|
Print Statement | | | 4/6/2015 | | DONE |
Rita DeYoung
|
|
|
final fees due
|
Third Notice | | 2/7/2015 | 3/3/2015 | | DONE |
|
|
|
|
Third Notice | | 1/11/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 11/12/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 9/3/2014 | 11/3/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson @ ESI
|
Third Notice | | 6/14/2014 | 8/29/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 4/5/2014 | 5/5/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Second Notice | | 3/16/2014 | 3/31/2014 | | DONE |
|
|
|
|
First Notice | | 1/27/2014 | 3/6/2014 | | DONE |
|
|
|
|
BLD-Final | 1/16/2014 | 1/17/2014 | 1/22/2014 | A | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Per Craig, life safety passed
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Per Craig, the life safety passed
|
Permanent Occupancy | | | 1/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Ceiling Grid Inspection | 1/8/2014 | 1/8/2014 | 1/9/2014 | P | PASS |
Dave Hannah
|
|
|
Request for Zions First Floor Ceiling Grid inspection, requested by Roger. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | PASS |
Dave Hannah
|
|
|
1st Floor, Zions Bank, Soffit request for cover per Roger Wilson, Thanks. akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/1/2013 | 11/4/2013 | 11/5/2013 | A | PART |
Dave Hannah
|
|
|
1st Floor Zions Bank, Framing inspection for cover, Scheduled per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls and soffits they will remove elec out of back side of exit passageway.
|
BLD-Framing/Rough-in | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | PART |
Dave Hannah
|
|
|
Zions First Floor Restroom Framing/Cover Inspection Request, Per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover back restrooms and brack area
|
Permit Ready to Issue | | | 7/31/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2013 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/26/2013 | 6/26/2013 | 7/30/2013 | | PASS |
Carl Westfall
|
|
|
ZION'S BANK - STE 100 ePlanReview - Zion's Bank 1st Floor - reference BLD13-00903 and BLD13-00904 also attached to this ePlanReview case for review
|
Routing - FIRE | 7/26/2013 | | 7/30/2013 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans and case.
|
Routing PW Environmental | 7/26/2013 | | 7/30/2013 | | PASS |
Walt Baumgartner
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2013 | | PASS |
Jason Blais
|
|
|
For Carl Westfall.
|
Routing - PLAN CHECK | 7/23/2013 | | 7/26/2013 | | PASS |
Carl Westfall
|
|
|
Started the resubmittal review on July 26. The drawings were approved with "red lines".
|
Plan resubmittals received | | | 7/23/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/11/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/26/2013 | | 7/11/2013 | | FAIL |
Carl Westfall
|
|
|
The 1st IBC plan review was started on June 27 (one day after it was accepted) and was finished on July 11 (11 days after it was accepted). Revised drawings were required. See the changemarks on the drawings and the plan review report.
|
1st review completed | | | 7/11/2013 | | DONE |
Carl Westfall
|
|
|
|
Routing - FIRE | 6/26/2013 | 6/26/2013 | 7/5/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing PW Sewer Rating | 6/26/2013 | | 7/3/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 6/27/2013 | | FAIL |
Walt Baumgartner
|
|
|
proposed grease abatement no approved. Contact ###-####
|
Routing - PLUMBING | 6/26/2013 | | 6/27/2013 | | PASS |
Bill VanDegrift
|
|
|
perplans and ISPC
|
Routing - Addressing | 6/26/2013 | | 6/27/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 6/26/2013 | | 6/27/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/26/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed on 4/17/13 by Adele Schaffeld-Griffin. Plan Review Fees paid on 6/26/13.
|
Pending Assignment by JCB | 6/26/2013 | | 6/26/2013 | | DONE |
Jason Blais
|
|
|
|
Telephone call | | | 6/4/2013 | | DONE |
|
|
|
Left message for Dave Anderson letting him know the review has not started on this permit. He recieved an e-mail on 4-17-2013 telling him he had passed prescreen and fees were due before the review could start. Told him to refer to that e-mail, to into dox and look for a task or call for assistance.
|
Telephone call | | | 5/2/2013 | | DONE |
|
|
|
Called Darin Bell with Babcock and left him a message letting him know this permit had documents uploaded several weeks ago but the plan review fee has not been paid; the permit review will not start until the fee is paid.
|
Telephone call | | | 4/22/2013 | | |
Adele J Schaffeld-Griffin
|
|
|
spoke with Brigitta on the phone in regards to the need to send the project to central district health for review. Brigitta said she spoke with the applicant and the kitchen area will not be used to serve the public and will not be used on a regular occasion. With these two reasons whe does not need to review the construction documents. 2:45 pm 4/22/13 ajs
|
Application received | | | 4/15/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 15 2013 5:57PM
|