Permit Information
Permit NumberBLD13-00889
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 100
Project Name8TH & MAIN STE 100
Customer Number 
ePlanReviewYes
Description
(ZION'S BANK - SUITE 100 - 1ST FLOOR - BRANCH BANK) The fire sprinkler system used for high-rise. To construct a 6,321 square foot tenant space on the 1st story of a high-rise building to be used as a customer service branch bank. These plans also include work to be done under permits BLD13-00903 (7th story) and BLD13-00904 (17th story). This tenant space is located in the South end of the 1st story. Work is to include interior nonbearing walls, 2 single user restrooms accessible to the disabled, interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board ceiling soffits, millwork, a walkup ATM for pedestrians, a drive-thru ATM, pneumatic vacuum air tubes (VAT) and blower tubes to serve drive-thru lanes, and finishes. At least one teller station within the bank customer service lobby is required to be accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/8/20154/6/2015 DONE
Print Statement  4/6/2015 DONE
DetailsRita DeYoung
final fees due
Third Notice 2/7/20153/3/2015 DONE
Third Notice 1/11/20152/2/2015 DONE
Third Notice 11/12/201412/1/2014 DONE
Third Notice 9/3/201411/3/2014 DONE
e-mailed to Adam Johnson @ ESI
Third Notice 6/14/20148/29/2014 DONE
e-mailed to Adam Johnson
Third Notice 5/10/20146/9/2014 DONE
e-mailed to Adam Johnson
Third Notice 4/5/20145/5/2014 DONE
e-mailed to Adam Johnson
Second Notice 3/16/20143/31/2014 DONE
First Notice 1/27/20143/6/2014 DONE
BLD-Final1/16/20141/17/20141/22/2014APASS
DetailsDave Hannah
adam Phone #: ###-####
FIRE-Final Inspection1/16/20141/17/20141/17/2014APASS
DetailsTroy Cobbley
Per Craig, life safety passed
FIRE-Final Inspection1/16/20141/17/20141/17/2014APASS
DetailsTroy Cobbley
Per Craig, the life safety passed
Permanent Occupancy  1/17/2014 DONE
DetailsBarbara Stitt
BLD-Ceiling Grid Inspection1/8/20141/8/20141/9/2014PPASS
DetailsDave Hannah
Request for Zions First Floor Ceiling Grid inspection, requested by Roger. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Wall cover11/22/201311/25/201311/25/2013APASS
DetailsDave Hannah
1st Floor, Zions Bank, Soffit request for cover per Roger Wilson, Thanks. akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in11/1/201311/4/201311/5/2013APART
DetailsDave Hannah
1st Floor Zions Bank, Framing inspection for cover, Scheduled per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls and soffits they will remove elec out of back side of exit passageway.
BLD-Framing/Rough-in10/15/201310/16/201310/16/2013APART
DetailsDave Hannah
Zions First Floor Restroom Framing/Cover Inspection Request, Per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover back restrooms and brack area
Permit Ready to Issue  7/31/2013 DONE
Print Occupancy Form  7/31/2013 DONE
Issue PAID IN FULL permit  7/31/2013 DONE
Plan assigned to (CJW)6/26/20136/26/20137/30/2013 PASS
DetailsCarl Westfall
ZION'S BANK - STE 100 ePlanReview - Zion's Bank 1st Floor - reference BLD13-00903 and BLD13-00904 also attached to this ePlanReview case for review
Routing - FIRE7/26/2013 7/30/2013 PASS
DetailsScott Arellano
Attached revised comments to plans and case.
Routing PW Environmental7/26/2013 7/30/2013 PASS
DetailsWalt Baumgartner
PLANS/APPL TAKEN TO FRONT DESK  7/30/2013 PASS
DetailsJason Blais
For Carl Westfall.
Routing - PLAN CHECK7/23/2013 7/26/2013 PASS
DetailsCarl Westfall
Started the resubmittal review on July 26. The drawings were approved with "red lines".
Plan resubmittals received  7/23/2013 DONE
Plan resubmittals requested  7/11/2013 DONE
Routing - PLAN CHECK6/26/2013 7/11/2013 FAIL
DetailsCarl Westfall
The 1st IBC plan review was started on June 27 (one day after it was accepted) and was finished on July 11 (11 days after it was accepted). Revised drawings were required. See the changemarks on the drawings and the plan review report.
1st review completed  7/11/2013 DONE
DetailsCarl Westfall
Routing - FIRE6/26/20136/26/20137/5/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing PW Sewer Rating6/26/2013 7/3/2013 PASS
DetailsBeverly Mountain
Routing PW Environmental6/27/2013 6/27/2013 FAIL
DetailsWalt Baumgartner
proposed grease abatement no approved. Contact ###-####
Routing - PLUMBING6/26/2013 6/27/2013 PASS
DetailsBill VanDegrift
perplans and ISPC
Routing - Addressing6/26/2013 6/27/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS6/26/2013 6/27/2013 PASS
DetailsBeverly Mountain
Intake Approval  6/26/2013 PASS
DetailsJason Blais
Prescreen passed on 4/17/13 by Adele Schaffeld-Griffin. Plan Review Fees paid on 6/26/13.
Pending Assignment by JCB6/26/2013 6/26/2013 DONE
DetailsJason Blais
Telephone call  6/4/2013 DONE
Left message for Dave Anderson letting him know the review has not started on this permit. He recieved an e-mail on 4-17-2013 telling him he had passed prescreen and fees were due before the review could start. Told him to refer to that e-mail, to into dox and look for a task or call for assistance.
Telephone call  5/2/2013 DONE
Called Darin Bell with Babcock and left him a message letting him know this permit had documents uploaded several weeks ago but the plan review fee has not been paid; the permit review will not start until the fee is paid.
Telephone call  4/22/2013 
DetailsAdele J Schaffeld-Griffin
spoke with Brigitta on the phone in regards to the need to send the project to central district health for review. Brigitta said she spoke with the applicant and the kitchen area will not be used to serve the public and will not be used on a regular occasion. With these two reasons whe does not need to review the construction documents. 2:45 pm 4/22/13 ajs
Application received  4/15/2013 DONE
Application submitted via PDS Online on Apr 15 2013 5:57PM