Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-00892
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 1569 N MILWAUKEE ST
Project NameTJ Maxx Plaza
Customer Number 
ePlanReviewYes
Description
(T.I for future Fire House Subs)(TJ Max Plaza)Scope of work: Two new accessible restrooms without any finishes, stub in 400 AMP power source, new 12 HVAC unit including the structural improvements as per the engineering calculations for the new roof top unit, per approved plans and plan review report. Work to include minor repair to existing 1hour rated tenant separation walls. Finish TI for Fire House Subs under BLD13-00890. This building is fully fire sprinklered with an approved fire alarm system. Any modifications to the building fire protection systems will require separate permits; as regulated by the Boise Fire Department. **AJS
Project data: (FIREHOUSE SUBS) The Fire House Sub shop project has been broken out into 2 permits. The architect prepared the plans as one plan set then was asked to separate them into 2 different bid sets. This was done to be in conformance with their lease agreement. Indicating what portion of the project the owner will be responsible for versus what the tenant will be responsible for. BLD13-00892 scope of work includes the 2 new restrooms without finishes, stub for the 400 amp service and a new 12 ton HVAC unit. There will need to be some minor repair work to the existing tenant separation walls. Permit BLD13-00890 indicates the location of existing rated wall assemblies. The repair to the wall shall meet the same fire rating as required for the original building. The ceiling gird is being removed under this permit and the instillation of the grid is under BLD13-00890. The construction of the 2 permits is going to be done concurrently. The c of o cannot be issued until this permit is completed. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/4/201310/29/2013 DONE
This permit finaled on the web by Richard Schultz
Second Notice 8/11/20138/30/2013 DONE
Faxed 8-30-13
First Notice7/1/20137/1/20138/1/2013 DONE
DetailsMike Jordan
Faxed 8/1/13
FIRE-Final Inspection7/1/20137/1/20137/1/2013PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final7/1/20137/1/20137/1/2013PPASS
DetailsMike Jordan
DOC - Permit Finaled7/1/20137/1/20137/1/2013PPASS
DetailsMike Jordan
BLD-Framing/Rough-in6/6/20136/6/20136/6/2013PPASS
DetailsMike Jordan
Additional 2x6 lumber added for RTU support.
BLD-Framing/Rough-in6/5/20136/6/20136/6/2013APART
DetailsMike Jordan
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Needs to complete framing with ADDITIONAL 2X6 as noted on approved plans at RTU drop.
BLD-Conference5/10/20135/13/20135/13/2013PCANC
DetailsMike Jordan
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz
BLD-Framing/Rough-in5/13/20135/13/20135/13/2013PPASS
DetailsMike Jordan
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Interior steel stud framed walls for restrooms.
OVERRIDE  5/1/2013  
OVERRIDE  5/1/2013  
Override - Parcel Holds  5/1/2013  
Issue PAID IN FULL permit  5/1/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  5/1/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  5/1/2013  
Permit Ready to Issue  5/1/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)4/18/20134/18/20134/24/2013 PASS
DetailsAdele J Schaffeld-Griffin
level 2 TI
Routing - PLAN CHECK4/18/2013 4/24/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  4/24/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/24/2013 DONE
DetailsAdele J Schaffeld-Griffin
Routing - PUBLIC WORKS4/18/2013 4/23/2013 PASS
DetailsBeverly Mountain
signed off in e plan review
Routing - Addressing4/18/2013 4/18/2013 PASS
DetailsJason C. Taylor
Routing - PLUMBING4/18/2013 4/18/2013 PASS
DetailsDaryl Spivey
Per plan and 2009 ISPC.
Payment Received  4/16/2013 DONE
Payment received via Govolutions
Application received  4/16/2013 DONE
Application submitted via PDS Online on Apr 16 2013 8:48AM