Third Notice | | 2/7/2015 | 4/6/2015 | | DONE |
|
|
|
|
Print Statement | | | 4/6/2015 | | DONE |
|
|
|
|
Third Notice | | 1/11/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 11/12/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 9/3/2014 | 11/3/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson @ ESI
|
Third Notice | | 6/14/2014 | 8/29/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 4/5/2014 | 5/5/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Second Notice | | 3/16/2014 | 3/31/2014 | | DONE |
|
|
|
|
First Notice | | 1/27/2014 | 3/6/2014 | | DONE |
|
|
|
|
BLD-Final | 1/16/2014 | 1/17/2014 | 1/22/2014 | A | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 1/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | NR |
Jim Sly
|
|
|
Building final 7th floor with Roger. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Need fire life safety final.
|
FIRE-Final Inspection | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Forrest France
|
|
|
Final pending exit signage per plan review notes and comments.
|
BLD-Final | 1/14/2014 | 1/15/2014 | 1/16/2014 | P | NR |
Dave Hannah
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/14/2014 | 1/14/2014 | 1/15/2014 | P | NR |
Forrest France
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PART |
Forrest France
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | DEFR |
Tony Young
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Dave Hannah
|
|
|
Ceiling Grid inspection 7th Floor Zions, Exterior perimeter, previously inspected, just called in for formal sign off. AKJ Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PASS |
Dave Hannah
|
|
|
tyler Phone #: ###-####
|
Permit Ready to Issue | | | 7/31/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2013 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/26/2013 | 6/26/2013 | 7/30/2013 | | PASS |
Carl Westfall
|
|
|
ZION'S BANK - STE 700 ePlanReview - Zion's Bank 7th Floor - reference BLD13-00889 for review
|
Routing - FIRE | 7/26/2013 | | 7/30/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans and case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2013 | | PASS |
Jason Blais
|
|
|
For Carl Westfall.
|
Routing - PLAN CHECK | 7/23/2013 | | 7/26/2013 | | PASS |
Carl Westfall
|
|
|
Started the resubmittal review on July 26. The drawings were approved with "red lines".
|
Plan resubmittals received | | | 7/23/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/11/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/26/2013 | | 7/11/2013 | | FAIL |
Carl Westfall
|
|
|
The 1st IBC plan review was started on June 27 (one day after it was accepted) and was finished on July 11 (11 days after it was accepted). Revised drawings were required. See the changemarks on the drawings and the plan review report.
|
1st review completed | | | 7/11/2013 | | FAIL |
Carl Westfall
|
|
|
|
Routing - FIRE | 6/26/2013 | 6/26/2013 | 7/5/2013 | | FAIL |
Scott Arellano
|
|
|
Attached plan review report to case. Emailed resubmittal item to architect.
|
Routing PW Sewer Rating | 6/26/2013 | | 7/3/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 6/27/2013 | | PASS |
Walt Baumgartner
|
|
|
Comments on 00889 if any.
|
Routing - PLUMBING | 6/26/2013 | | 6/27/2013 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 6/26/2013 | | 6/27/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 6/26/2013 | | 6/27/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/26/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed on 4/17/13 by Adele Schaffeld-Griffin. Plan Review Fees paid on 6/26/13.
|
Pending Assignment by JCB | 6/26/2013 | | 6/26/2013 | | DONE |
Jason Blais
|
|
|
|
Telephone call | | | 6/4/2013 | | DONE |
|
|
|
Left message for Dave Anderson letting him know the review has not started on this permit. He recieved an e-mail on 4-17-2013 telling him he had passed prescreen and fees were due before the review could start. Told him to refer to that e-mail, to into dox and look for a task or call for assistance.
|
Telephone call | | | 5/2/2013 | | DONE |
|
|
|
Called Darin Bell with Babcock and left him a message letting him know this permit had documents uploaded several weeks ago but the plan review fee has not been paid; the permit review will not start until the fee is paid.
|
Application received | | 4/16/2013 | | | |
|
|
|
|