Third Notice | | 2/7/2015 | 4/6/2015 | | DONE |
|
|
|
|
Print Statement | | | 4/6/2015 | | DONE |
Rita DeYoung
|
|
|
|
Third Notice | | 1/11/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 11/12/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 9/3/2014 | 11/3/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson @ ESI
|
Third Notice | | 6/14/2014 | 8/29/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 4/5/2014 | 5/5/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Second Notice | | 3/16/2014 | 3/31/2014 | | DONE |
|
|
|
|
First Notice | | 2/20/2014 | 3/6/2014 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
BLD-Final | 2/7/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Dave Hannah
|
|
|
Request final inspection of Zions 17th Floor. Please contact Adam or Roger for a walk of this space. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
Permanent Occupancy | | | 2/10/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Conference | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PEND |
Dave Hannah
|
|
|
Meet and walk H&H floors for egress signage compliance. Contact Adam or Murph. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
Case Summary (BLD) | | | 2/3/2014 | | DONE |
|
|
|
|
BLD-Conference | 1/28/2014 | 1/29/2014 | 1/30/2014 | A | PEND |
Dave Hannah
|
|
|
Zions 17th Floor, pre final inspection walk, AM w/Roger and Adam. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 1/8/2014 | 1/8/2014 | 1/9/2014 | P | NR |
Dave Hannah
|
|
|
Pre Inspection walk with Dave H. and Roger W. 17th Floor Zions space.Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson still working
|
BLD-Framing/Rough-in | 12/10/2013 | 12/10/2013 | 12/11/2013 | P | PART |
Dave Hannah
|
|
|
Framing inspection request by John Woods, FCS, 12-10-13 Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson walls ok still need to look at hard lid befor cover
|
BLD-Wall cover | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | PASS |
Dave Hannah
|
|
|
Soffit framing, approval for cover, 17th Floor, Zions TI. Per Roger Wilson. Thanks akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Dave Hannah
|
|
|
Request inspection 17th floor Zions Space, permiter framing cover. Thanks. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/4/2013 | 11/5/2013 | 11/6/2013 | A | PART |
Dave Hannah
|
|
|
Framing Inspection at 17th Floor, Zions. Per Roger Wilson. THanks, Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to insluate and cover north and west outer walls
|
BLD-Framing/Rough-in | 10/1/2013 | 10/1/2013 | 10/3/2013 | P | NR |
Dave Hannah
|
|
|
Zions TI, 17th Floor, North and West Elevations. Phone #: ###-#### >> Inspection requested via web by Adam Johnson Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/1/2013 | 10/1/2013 | 10/3/2013 | P | NR |
Dave Hannah
|
|
|
Zions TI, 17th Floor, North and West Elevations. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
Permit Ready to Issue | | | 7/31/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2013 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/26/2013 | 6/26/2013 | 7/30/2013 | | PASS |
Carl Westfall
|
|
|
ZION'S BANK - STE 1700 ePlanReview - Zion's Bank 17th Floor - reference BLD13-00889 for review
|
Routing - FIRE | 7/26/2013 | | 7/30/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2013 | | PASS |
Jason Blais
|
|
|
For Carl Westfall.
|
Routing - PLAN CHECK | 7/23/2013 | | 7/26/2013 | | PASS |
Carl Westfall
|
|
|
Started the resubmittal review on July 26. The drawings were approved with "red lines".
|
Plan resubmittals received | | | 7/23/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/11/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/26/2013 | | 7/11/2013 | | FAIL |
Carl Westfall
|
|
|
The 1st IBC plan review was started on June 27 (one day after it was accepted) and was finished on July 11 (11 days after it was accepted). Revised drawings were required. See the changemarks on the drawings and the plan review report.
|
1st review completed | | | 7/11/2013 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 7/10/2013 | | 7/10/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plans and ISPC
|
Routing - FIRE | 6/26/2013 | | 7/5/2013 | | FAIL |
Scott Arellano
|
|
|
Attached plan review report to case. Emailed resubmittal item to architect.
|
Routing PW Sewer Rating | 6/26/2013 | | 7/3/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 6/27/2013 | | PASS |
Walt Baumgartner
|
|
|
See any comments will be made on 13-00889
|
Routing - PLUMBING | 6/26/2013 | | 6/27/2013 | | FAIL |
Bill VanDegrift
|
|
|
pass public works pretreatment review prior to plumbing review
|
Routing - Addressing | 6/26/2013 | | 6/27/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 6/26/2013 | | 6/27/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/26/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed on 4/17/13 by Adele Schaffeld-Griffin. Plan Review Fees paid on 6/26/13.
|
Pending Assignment by JCB | 6/26/2013 | | 6/26/2013 | | DONE |
Jason Blais
|
|
|
|
Telephone call | | | 6/4/2013 | | DONE |
|
|
|
Left message for Dave Anderson letting him know the review has not started on this permit. He recieved an e-mail on 4-17-2013 telling him he had passed prescreen and fees were due before the review could start. Told him to refer to that e-mail, to into dox and look for a task or call for assistance.
|
Telephone call | | | 5/2/2013 | | DONE |
|
|
|
Called Darin Bell with Babcock and left him a message letting him know this permit had documents uploaded several weeks ago but the plan review fee has not been paid; the permit review will not start until the fee is paid.
|
Application received | | 4/16/2013 | | | |
|
|
|
|