Permanent Occupancy | | | 11/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Mike Jordan
|
|
|
Victoria Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 7/30/2013 | 7/30/2013 | 7/30/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/22/2013 | 4/23/2013 | 4/23/2013 | P | FAIL |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Resubmit plans showing 9 ft. display wall that has been framed and racking exceeding over 8 ft. requires seperate permit and engineering.
|
FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide racking/high pile storage permit for the racking that exceeds 8', repair all of the emergency lights, resubmit floor plan for new walls that are being built.
|
Issue PAID IN FULL permit | | | 4/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 4/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 4/19/2013 | | DONE |
Barbara Stitt
|
|
|
Called Kevin and informed him that permit is ready on 4-19-13 @ 8:25am///BAS
|
Plan assigned to (CDM) | 4/18/2013 | 4/18/2013 | 4/18/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/18/2013 | | 4/18/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/18/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/18/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/18/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/18/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 11/22/2013 | | | |
|
|
|
|
Application received | | 4/18/2013 | | | |
|
|
|
|