Print Statement | | | 1/8/2015 | | DONE |
|
|
|
|
Print Statement | | | 12/17/2014 | | DONE |
|
|
|
|
First Notice | | 10/3/2014 | 11/24/2014 | | DONE |
|
|
|
|
Print Statement | | | 11/24/2014 | | DONE |
|
|
|
|
BLD-Final | 9/22/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Dave Hannah
|
|
|
Duel Phone #: ###-####
|
FIRE-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | | 9/23/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permanent Occupancy | | | 9/23/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/23/2014 | | DONE |
|
|
|
|
BLD-Aging Inspection | 9/8/2014 | 9/8/2014 | 9/8/2014 | | PEND |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 7/22/2014 | 7/22/2014 | 7/22/2014 | | DONE |
Mike D Hedge
|
|
|
Street lights complete. Ok for permanent occupancy.
|
FIRE-Final Inspection | 7/8/2014 | 7/10/2014 | 7/11/2014 | A | PART |
Forrest France
|
|
|
2nd floor core area passed fire life safety inspection.
|
BLD-Final | 7/3/2014 | 7/3/2014 | 7/7/2014 | P | PART |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | PART |
Forrest France
|
|
|
Completed re-inspection for previous correction items dated 6/30 related to apartments on the 2nd, 3rd and 4th floors. Provisions and adjustments finished with the exception of door closure at 212, exit discharge light at the main street side, outside waterflow bell not yet installed. Shell fire protection 1st floor pending necessary revisions per agreement on record. Temporary occupancy approved per R. Gervais.
|
Temporary Occupancy | 7/3/2014 | 10/1/2014 | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 6/26/2014 | 6/30/2014 | 7/1/2014 | P | FAIL |
Forrest France
|
|
|
Fire life safety inspection items for the 2nd, 3rd and 4th floor apartments completed 6/30 include; provide exit sign per plan review red line at the 1st floor landing east side stairway, install exit discharge lighting for both east and west stairways, test EM light 1st floor east stairway, remove scafolding in the west stairway, remove tape covering smoke alarms at 4th floor apartment units, install door seals at doors serving elevator lobbies to apt unit corridors, adjust closer at units 204, 206, 212. Remove tape and provide escutcheon at sprinkler head unit 206, provide intermediate temp pendent head at unit 312 adjacent to HVAC diffuser, install outside waterflow bell 11th street side, relocate two smoke alarms at unit 301, replace malfunctional flow switches at the 3rd and 4th floor sprinkler control manifolds. 1st floor fire sprinkler protection at the vacant shell does not meet NFPA 13 standards.
|
BLD-Final | 6/26/2014 | 6/30/2014 | 6/30/2014 | P | NR |
Dave Hannah
|
|
|
apartments only - Jim Phone #: ###-####
|
Zoning Approval | 6/30/2014 | 6/30/2014 | 6/30/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Ceiling Grid Inspection | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | PASS |
Dave Hannah
|
|
|
2nd fl corridor bridal - Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Dave Hannah
|
|
|
2nd fl ballroom - Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | PASS |
Dave Hannah
|
|
|
West side apart fire escape - Jim Phone #: ###-####
|
BLD-Conference | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | PART |
Jim Sly
|
|
|
Ceiling grid inspection in the basement please-Jim Phone #: ###-#### Bsmnt elevator lobby and Board room.....OK.
|
BLD-Conference | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### entry vestabule ceilling ok to cover
|
BLD-Conference | 6/11/2014 | 6/11/2014 | 6/12/2014 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 6/10/2014 | 6/10/2014 | 6/11/2014 | P | DEFR |
Dave Hannah
|
|
|
shaft wall inspection please-Jim Phone #: ###-#### called in wrong permit number
|
BLD-Other | 5/30/2014 | 6/6/2014 | 6/6/2014 | A | CANC |
Dave Hannah
|
|
|
Foam barrier - Nabi Phone #: ###-####
|
BLD-Conference | 6/5/2014 | 6/5/2014 | 6/6/2014 | P | DONE |
Dave Hannah
|
|
|
Jim Phone #: ###-#### rise and run of stairs and handrails
|
BLD-Conference | 5/30/2014 | 6/2/2014 | 6/2/2014 | A | PASS |
Dave Hannah
|
|
|
hand rail for core stairwell - Jim Phone #: ###-#### I have walked stair tower #2 and because of egress widths I have approved the handrails as they are currently built.
|
BLD-Conference | 5/22/2014 | 5/23/2014 | 5/27/2014 | A | PASS |
Dave Hannah
|
|
|
*Requests around 10 - Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | NR |
Jim Storey
|
|
|
Jim-2nd floor core Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2014 | 5/12/2014 | 5/12/2014 | A | PASS |
Dave Hannah
|
|
|
Juron Phone #: ###-####
|
BLD-Other | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | PASS |
Dave Hannah
|
|
|
1st fl cover/walk/ceiling - Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2014 | 5/2/2014 | 5/6/2014 | P | PASS |
Dave Hannah
|
|
|
Jim-cover inspections for 1st and 2nd floors Phone #: ###-####
|
BLD-Conference | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | CANC |
Mike Jordan
|
|
|
jim - 11am please Phone #: ###-####. Cancelled, rescheduled for friday in the am.
|
BLD-Other | 4/24/2014 | 4/25/2014 | 4/29/2014 | A | PART |
Dave Hannah
|
|
|
jim - ceiling assembly on 1st floor Phone #: ###-#### hardlid first floor . rest rooms on the second/mezz deck ok to cover also ok to one side int walls on second /mezz deck ceiling grid in halls on 4 and 3 ok to cover
|
BLD-Framing/Rough-in | 4/21/2014 | 4/22/2014 | 4/23/2014 | A | PASS |
Dave Hannah
|
|
|
2nd fl restrooms & basement data room - Jim Phone #: ###-####
|
BLD-Other | 4/18/2014 | 4/18/2014 | 4/21/2014 | P | PART |
Dave Hannah
|
|
|
jim - shaft inspection Phone #: ###-####
|
BLD-Other | 4/10/2014 | 4/10/2014 | 4/11/2014 | P | NR |
Dave Hannah
|
|
|
fire stop - 2nd floor core Phone #: ###-####
|
BLD-Other | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PART |
Dave Hannah
|
|
|
Fire stop - Jim Phone #: ###-#### first floor mailbox area ok to cover
|
BLD-Other | 4/3/2014 | 4/3/2014 | 4/4/2014 | P | PART |
Dave Hannah
|
|
|
Mechanical shaft inspection please-Jason Phone #: ###-#### ok to cover
|
BLD-Other | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PART |
Dave Hannah
|
|
|
Shaft inspection in the core pleaseJIm Phone #: ###-#### ok to start framing and installing ent layer of shaft wall board
|
BLD-Framing/Rough-in | 3/21/2014 | 3/21/2014 | 3/24/2014 | P | PASS |
Dave Hannah
|
|
|
Ceiling cover inspection for the apt lobby please-Jim Phone #: ###-####
|
BLD-Conference | 3/17/2014 | 3/17/2014 | 3/18/2014 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | PASS |
Dave Hannah
|
|
|
Jim - Conf at 11 Phone #: ###-####
|
BLD-Other | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | FAIL |
Jim Storey
|
|
|
late AM// cover insp for apartment lobby / Jim Phone #: ###-#### oversized pvc penatration/ mail box area shaft required/ 1 ht protection of wood floor support/ west window gyp at ceilling line 1 hr protection behind metal framing.
|
BLD-Concrete | 3/3/2014 | 3/4/2014 | 3/4/2014 | A | PART |
Dave Hannah
|
|
|
jim - 6th fl shaft; 3th fl bath room; Phone #: ###-#### bath room ok need to finish framing shaft and install shaft board
|
BLD-Other | 2/25/2014 | 2/26/2014 | 2/27/2014 | A | NR |
Dave Hannah
|
|
|
ceiling, elevator and stair tower core // Jim Phone #: ###-####
|
BLD-Other | 2/24/2014 | 2/24/2014 | 2/25/2014 | P | PART |
Dave Hannah
|
|
|
core shaft - Jim Phone #: ###-#### ok to keep working on shaft they have the back wall in
|
BLD-Other | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PART |
Dave Hannah
|
|
|
JIM - SHAFT LINER 6TH FL Phone #: ###-#### ok to keep going
|
BLD-Wall cover | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Dave Hannah
|
|
|
apt corridor 2nd floor cover insp // Jim Phone #: ###-####
|
BLD-Other | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | PASS |
Tony Young
|
|
|
2nd fl soffit cover - Jim Phone #: ###-####
|
BLD-Other | 2/5/2014 | 2/5/2014 | 2/6/2014 | P | PEND |
Dave Hannah
|
|
|
reinsp soffit on 2nd floor for cover // Jim Phone #: ###-#### ok after fire oks
|
BLD-Other | 2/3/2014 | 2/3/2014 | 2/4/2014 | P | NR |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
BLD-Wall cover | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PASS |
Dave Hannah
|
|
|
4th floor restrooms please-Jim Phone #: ###-####
|
BLD-Other | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | NR |
Dave Hannah
|
|
|
JIM - FIRE PROOFING ON THE 4TH FLOOR Phone #: ###-####
|
BLD-Other | 1/10/2014 | 1/13/2014 | 1/14/2014 | A | CANC |
Dave Hannah
|
|
|
2nd & 5th floor caulking - Jim Phone #: ###-#### Dave told me to cancel.....Already looked at it.
|
BLD-Framing/Rough-in | 1/13/2014 | 1/13/2014 | 1/14/2014 | P | PART |
Dave Hannah
|
|
|
2nd & 5th floor caulking - Jim Phone #: ###-#### ok to cover 2nd floor aprt and 5th floor restrooms
|
Routing - Addressing | 1/10/2014 | | 1/10/2014 | | PASS |
Jason C. Taylor
|
|
|
New address assigned for Apartments. 1161 W Main St should be used for all new permits associated with the apartments. Each individual apartment has been assigned an apartment number as is in the documents for the file. Jason Taylor ###-####
|
BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 | A | PART |
Dave Hannah
|
|
|
JIM apt first floor Phone #: ###-#### needs to finish fire spray on rock wool floor infills
|
BLD-Other | 1/3/2014 | 1/6/2014 | 1/7/2014 | P | PASS |
Dave Hannah
|
|
|
jim - 3rd floor apts - fire stop Phone #: ###-####
|
BLD-Other | 1/7/2014 | 1/7/2014 | 1/7/2014 | A | PART |
Dave Hannah
|
|
|
jim - 3rd floor apts - fire stop Phone #: ###-#### ok to cover walls on 3rd floor
|
BLD-Other | 12/24/2013 | 12/27/2013 | 12/27/2013 | A | PASS |
Dave Hannah
|
|
|
jim - cover on 3rd floor apartments Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2013 | 12/20/2013 | 12/21/2013 | P | NR |
Dave Hannah
|
|
|
Ok to cover 3rd fl apart - Jim Phone #: ###-####
|
FIRE-Conference | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | DEFR |
Forrest France
|
|
|
tim - fire walk 2:30 if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2013 | 12/5/2013 | 12/9/2013 | P | PASS |
Dave Hannah
|
|
|
3RD FLOOR - FRAMING AND FIRE PROOFING PER DAVE HANNAH
|
BLD-Other | 12/4/2013 | 12/5/2013 | 12/9/2013 | A | NR |
Dave Hannah
|
|
|
jim - 7 to 1 floor Phone #: ###-####
|
FIRE-Final Inspection | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | NR |
Forrest France
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | NR |
Forrest France
|
|
|
early as poss // use permit to occupy the 7th floor // Jim Phone #: ###-#### *Completed on site walkthrough with G. Goldsmith, T. Gainor, and general contractors. Project is not in condition for occupancy at this time due to construction underway and site work in progress.*
|
BLD-Other | 11/27/2013 | 12/2/2013 | 12/4/2013 | A | PART |
Dave Hannah
|
|
|
Mid-morning request // apt fire caulking cover, 7th floor ceiling insp // Jim Phone #: ###-#### ok to 7th floor ceiling and 4th floor walls
|
CHANGE STATUS TO (ISS) | | | 12/3/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 12/3/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/22/2013 | | |
|
|
|
|
BLD-Ceiling Grid Inspection | 11/20/2013 | 11/21/2013 | 11/22/2013 | A | PART |
Dave Hannah
|
|
|
After 10 please - 2nd fl apartments - Jim Phone #: ###-#### ok to cover ceilings 2nd and 3rd fl apts and rest rooms on 6th fl
|
Plan assigned to (CJW) | 11/12/2013 | 11/12/2013 | 11/22/2013 | | PASS |
Carl Westfall
|
|
|
Owyhee Place Plan Modification
|
Routing - PLAN CHECK | 11/12/2013 | | 11/22/2013 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2013 | | DONE |
|
|
|
2nd plan mod approved
|
Print Occupancy Form | | | 11/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/22/2013 | | DONE |
Christina Prado
|
|
|
called David to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/22/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | FAIL |
Dave Hannah
|
|
|
cover for 6th flr bathrooms // Jim Phone #: ###-#### need to fire stop at ceiling and floor lines
|
BLD-Other | 11/14/2013 | 11/15/2013 | 11/18/2013 | P | PART |
Dave Hannah
|
|
|
late am // fire caulking 4th floor apts // Jim Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 11/7/2013 | 11/8/2013 | 11/12/2013 | A | PART |
Dave Hannah
|
|
|
4th floor walls in the apts, 3rd floor ceiling cover, insulation on 2nd floor all in the apartments--Jim Phone #: ###-#### ok to cover 3rd floor ceiling but needs to finish fire stopping on 4th floor.
|
Plan Modification Accepted | | | 11/12/2013 | | DONE |
Christina Prado
|
|
|
Plan Modification - To remove previously planned stair & wheelchair lift new West entrance. Revise handrail and guardrail designs troughout 1st & 2nd fl and modify design of site handrails to match new design. Update ceiling design, including HVAC & lighting at 1st floor to coordinate w/existing structural elements
|
BLD-Other | 11/1/2013 | 11/4/2013 | 11/5/2013 | A | PART |
Dave Hannah
|
|
|
Mock up cover - Jim Phone #: ###-#### needs to fire proof floor and ceiling opennings ok to one side
|
BLD-Framing/Rough-in | 11/4/2013 | 11/4/2013 | 11/5/2013 | P | PEND |
Dave Hannah
|
|
|
fire proofing floor in chase by elev shaft west wing
|
CHANGE STATUS TO (ISS) | | | 11/5/2013 | | DONE |
Tisha Gallop
|
|
|
picked up plan mod
|
OVERRIDE | | | 11/4/2013 | | |
|
|
|
|
Plan assigned to (CJW) | 10/8/2013 | 10/8/2013 | 11/4/2013 | | PASS |
Carl Westfall
|
|
|
OWYHEE PLACE - PLAN MOD
|
Telephone call | | | 11/4/2013 | | DONE |
Tisha Gallop
|
|
|
called David Ruby and told him plan mod ready and fee due.
|
Routing - PLAN CHECK | 10/24/2013 | | 11/4/2013 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Print Occupancy Form | | | 11/4/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Ceiling Grid Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | PASS |
Dave Hannah
|
|
|
3rd floor apts // Jim Phone #: ###-####
|
Plan resubmittals received | | | 11/1/2013 | | |
|
|
|
11-1-13 received 2 copies of A2.72
|
BLD-Other | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | PASS |
Dave Hannah
|
|
|
4th fl ceiling cover/apartments - Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2013 | 10/29/2013 | 10/29/2013 | A | PART |
Dave Hannah
|
|
|
jim Phone #: ###-#### 7th floor ok to cover walls
|
Meeting | | | 10/28/2013 | | DONE |
|
|
|
Met with Arch, etc. to discuss walkway across the roof.
|
Routing - Design Review | 10/24/2013 | | 10/25/2013 | | PASS |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | PART |
Dave Hannah
|
|
|
7th fl core, 3rd & 4th apartment- Jim Phone #: ###-#### ok to cover ext walls ok to one side ent walls
|
Routing - PLAN CHECK | 10/8/2013 | | 10/24/2013 | | FAIL |
Carl Westfall
|
|
|
Route to planning on the 24th. IBC review completed on the 25th. Plan review report Emailed to David Ruby.
|
BLD-Conference | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | DONE |
Dave Hannah
|
|
|
jim - before 10 please Phone #: ###-####
|
BLD-Other | 10/11/2013 | 10/14/2013 | 10/15/2013 | A | PART |
Dave Hannah
|
|
|
fire pillow insp, 3rd flr apts // jim Phone #: ###-#### ok to cover
|
BLD-Ceiling Grid Inspection | 10/7/2013 | 10/8/2013 | 10/9/2013 | A | PART |
Dave Hannah
|
|
|
2nd floor corrider ceiling insp // Jim Phone #: ###-#### ok to insulate and rock
|
Application received | | 4/18/2013 | 10/8/2013 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/8/2013 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld13-00938 (Owyhee Place - Apts, meeting rm core, office) to remove previously planned roof pop-up and relocation of doors/windows due to budget and National Parks Service requirements. Resue existing door/window openings where possible. Revise ceiling design to create more volume in low ceiling space. Nothing changed will be visible from the street. No change in overall floor plan size. Replace historic windows at South and West elevations of old building previously removed from scope of work; submitted on Supplemental Structural Calcs, door hardware specs and plan sheets A2.70, A2.72, A2.82, A4.3, A5.0, A5.1, A5.2, A5.3, A6.3, A7.72, A7.90, A9.0, A9.1, A9.11, S2.72, M2.61, M2.71, M6.00, P2.61, P2.71, P6.00, E3.71, E4.71, E8.00, E8.05; routed to Carl Westfall.
|
BLD-Framing/Rough-in | 10/2/2013 | 10/3/2013 | 10/4/2013 | A | NR |
Dave Hannah
|
|
|
request late AM -- conference/cover insp/framing -- Jim Phone #: ###-####
|
BLD-Conference | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | DONE |
Dave Hannah
|
|
|
bradden Phone #: ###-####
|
BLD-Conference | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | DONE |
Dave Hannah
|
|
|
1:00 pm meeting to walk project .
|
BLD-Concrete | 9/13/2013 | 9/16/2013 | 9/17/2013 | A | PEND |
Dave Hannah
|
|
|
JIM Phone #: ###-####
|
BLD-Conference | 9/10/2013 | 9/11/2013 | 9/12/2013 | A | DONE |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
OVERRIDE | | | 9/10/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/10/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/10/2013 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/19/2013 | 4/19/2013 | 9/9/2013 | | PASS |
Carl Westfall
|
|
|
OWYHEE PLACE (20 days - May 15)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/9/2013 | | |
|
|
|
9-9-13 called David Ruby permit ready and fee given / Also need GC,ACHD & VERIFY RP ///DLD
|
Routing - PLAN CHECK | 8/29/2013 | | 9/9/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines:.
|
Routing - PUBLIC WORKS | 9/9/2046 | | 9/9/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | | | 9/6/2013 | | PASS |
|
|
|
|
Routing - FIRE | 9/6/2013 | | 9/6/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Plan resubmittals received | | | 9/6/2013 | | DONE |
Christina Prado
|
|
|
Received four revised plan sheets marked E1.0;plans inserted by Carl Westfall
|
Routing - PLAN CHECK | 8/12/2013 | | 8/29/2013 | | DONE |
Carl Westfall
|
|
|
Routing completed. Waiting for resubmittals.
|
Plan resubmittals received | | | 8/29/2013 | | DONE |
Tisha Gallop
|
|
|
received response from engineer, resonse from architect, door hardware info, and plan sheets A0.0, A0.1, A0.26, A0.6, A0.7, A1.0, A2.10, A2.12, A2.72, A5.0, A5.2, A7.72, A9.0, A9.1, A9.2, EG2.0, EG2.1, E1.0, E2.0, E3.0, E3.11, E3.12, E3.71, E4.11, E4.12, E4.71, ST-1, ST-2, ST-3, ST-4, C-1, C-2, C-3, C-4, C-5, C-6, S1.00, S2.12, S2.22, S4.02, M2.01, M2.11, M2.22, M2.32, M2.42, M2.71, M6.00; taken to Carl Westfall.
|
Routing - PLUMBING | 8/7/2013 | | 8/12/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 8/7/2013 | | 8/7/2013 | | PASS |
Josh Wilson
|
|
|
Revisions ok per DRH13-00234
|
Routing - PUBLIC WORKS | 8/5/2013 | | 8/7/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Mike Hedge for lighting issues.
|
Routing PW Street Lights | 8/6/2013 | | 8/7/2013 | | FAIL |
Mike D Hedge
|
|
|
Required notes missing. I will contact electrical engineer and make sure he knows what is missing.
|
Plan resubmittals received | | | 8/6/2013 | | DONE |
|
|
|
rec'd two copies of sheets EG1.0; EG2.0; EG2.1; E1.0; E2.0; E3.0///ald
|
Routing PW Sewer Rating | 8/5/2013 | | 8/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 8/6/2013 | | 8/6/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 8/6/2013 | | 8/6/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Geothermal | | | 8/6/2013 | | PASS |
Jon R. Gunnerson
|
|
|
Reviewed by Jim Pardy and passed.
|
Routing - PLAN CHECK | 7/30/2013 | | 8/5/2013 | | |
|
|
|
Routed back to plan check in error. Should have been routed to other agencies.
|
Routing - FIRE | 7/26/2013 | | 7/30/2013 | | PASS |
Scott Arellano
|
|
|
Approved with comments attached to case. See code alternate for details on fire protection system alternates for fire alarm notification.
|
Routing - PLAN CHECK | 7/12/2013 | | 7/26/2013 | | FAIL |
Carl Westfall
|
|
|
Completed the resubmittal review. Corrections required. See the revised plan review report.
|
Plan resubmittals received | | | 7/12/2013 | | |
|
|
|
Received 1 cover transmittal, 2 copies of updated structural calcs
|
Routing - PLAN CHECK | 5/22/2013 | | 7/12/2013 | | DONE |
Carl Westfall
|
|
|
Waiting for resubmittals
|
Plan resubmittals received | | | 7/11/2013 | | |
|
|
|
2 copies of cover transmittal, plan review response, 2 copies of fire review response, 2 copies of specs, 2 copies of resvised drawings
|
Routing - FIRE | 5/18/2013 | 5/18/2013 | 5/22/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed plan review report to architect.
|
1st review completed | | | 5/22/2013 | | FAIL |
|
|
|
Failed PW, Plumbing, Plan Check, Fire.
|
Plan resubmittals requested | | | 5/22/2013 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/18/2013 | 5/23/2013 | 5/21/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 5/1/2013 | | 5/18/2013 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on May 6 and was finished on May 18 (10 work days). The 1st review took over 50 hours of review time. This project had 254 sheets. The plan review report was 26 pages long. The project value was $4,900,000 and the plan review fee was $16,723. It can be expected that this large project would take some time to review.
|
Plan resubmittals received | | | 5/16/2013 | | DONE |
Christina Prado
|
|
|
Received five sets of plans marked C1.0, C2.1 & C2.2, two drainage plans, two Drainage O & M; Plans taken by Angie back to Carl Westfall for further review
|
Route to Impact Fee Review | 4/19/2013 | 4/24/2013 | 5/13/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Design Review | 4/30/2013 | | 5/1/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH13-00089
|
Routing - PLUMBING | 4/30/2013 | | 4/30/2013 | | FAIL |
Bill VanDegrift
|
|
|
Provide a more complete set of plumbing plans showing existing and new sewer lines and sizing. Show how and where new and existing tie in and a isometric of new plumbing.
|
Routing - Erosion and Sediment | 4/30/2013 | | 4/30/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Plan waiver issued. Had to issue plan waiver because plan submitted for demo under ESC13-00325 did not include the T.I scope of work or address those potential pollutants, schedule, ect. Ref ESC13-00325 for demo and paving
|
Routing - PUBLIC WORKS | 4/22/2013 | | 4/29/2013 | | FAIL |
Beverly Mountain
|
|
|
Brian failed.
|
Routing PW Drainage | | | 4/29/2013 | | FAIL |
Brian Murphy
|
|
|
This is not a temporary lot and ACHD will not approve taking the drainage without a treatment system.
|
Routing PW Street Lights | 4/26/2013 | | 4/26/2013 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Sewer Design | 4/23/2013 | | 4/26/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
No Comment.
|
Routing - PLAN CHECK | 4/25/2013 | | 4/26/2013 | | |
Carl Westfall
|
|
|
Routed to Carl Westfall for him to do the interior nonstructural demolition permit.
|
Routing PW Geothermal | 4/22/2013 | | 4/23/2013 | | PASS |
Jon R. Gunnerson
|
|
|
Geothermal service not shown on plans - Ongoing coordination with Scott Gordon and Larry Rose regarding geothermal service location.
|
Routing PW Sewer Rating | 4/22/2013 | | 4/22/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/19/2013 | | 4/22/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCB | 4/18/2013 | | 4/19/2013 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/18/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/18/2013 | | PASS |
John Menard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/18/2013 | | DONE |
Christina Prado
|
|
|
|