Permit Information
Permit NumberBLD13-00943
StatusFinaled
Name HC COMPANY INC
Site Address 12650 W BRIDGER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Brighton HC Building (Shell Only) - To construct a new 16,475 square foot, one story, shell building and related site improvements. This building is for future office and warehouse tenant spaces. This building will be constructed of concrete tilt-up exterior walls with steel joist and girder roof system. This building will be fully fire sprinkled. This is shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  12/11/2013 DONE
DetailsBarbara Stitt
Print Statement  12/10/2013 DONE
Third Notice 12/14/201312/9/2013 DONE
Second Notice 12/7/201312/9/2013 DONE
First Notice11/22/201311/22/201311/27/2013 DONE
DetailsJim Sly
BLD-Final11/22/201311/22/201311/22/2013PPASS
DetailsJim Sly
DOC - Permit Finaled11/22/201311/22/201311/22/2013PPASS
DetailsJim Sly
BLD-Final11/21/201311/22/201311/22/2013APEND
DetailsJim Sly
BLD-Final11/21/201311/21/201311/21/2013PNR
DetailsJim Sly
darren Phone #: ###-####
FIRE-Final Inspection11/20/201311/21/201311/21/2013PPART
DetailsTroy Cobbley
A temporary occupancy for life safety is ok per Romeo Gervais until the CM Company tenant space is complete. 12-10-13 per phone call with Troy Cobbley fire has been signed off all the way.the building final was signed off early,but Troy went back out and signed it off.
FIRE-Final Inspection11/19/201311/20/201311/20/2013ACANC
DetailsTroy Cobbley
Not ready for life safety due to emergency lights.
PubWorks Occupancy Approval11/20/201311/20/201311/20/2013 DONE
DetailsTiffany Lowery
FIRE-Final Inspection11/18/201311/19/201311/19/2013ACANC
DetailsTroy Cobbley
Not ready for inspection. Rescheduled for tomorrow
Zoning Approval11/13/201311/13/201311/13/2013 PASS
DetailsJosh Wilson
BLD-Energy code compliance10/21/201310/22/201310/22/2013APASS
DetailsJim Sly
Darren Phone #: ###-####
FIRE-Conference10/14/201310/15/201310/15/2013ADONE
DetailsTroy Cobbley
darren discussed sprinkler protection in the center space that may have a tenant soon
BLD-Framing/Rough-in10/14/201310/14/201310/14/2013PPASS
DetailsJim Sly
darren Phone #: ###-####
BLD-Energy code compliance9/10/20139/11/20139/11/2013APART
DetailsJim Sly
Darren-Please call at least 30 mins prior to inspection Phone #: ###-####
2 Layers 2 1/2 " roof insulation OK.
BLD-Footing8/14/20138/15/20138/15/2013APASS
DetailsJim Sly
darren Phone #: ###-####
Trash Enclosure.
BLD-Footing8/13/20138/14/20138/14/2013PCANC
DetailsJim Sly
darren Phone #: ###-####
BLD-Footing8/9/20138/12/20138/12/2013APASS
DetailsJim Sly
Darren please call 30 min before going out Phone #: ###-####
Footing OK pending MTI special insp, tests and approvals
BLD-Footing8/8/20138/9/20138/9/2013PNR
DetailsJim Storey
rebar - Darren Phone #: ###-####
BLD-Other8/5/20138/6/20138/6/2013PPART
DetailsJim Sly
call 1/2 hr before//rebar//darren Phone #: ###-####
Remainder of tilt up panels OK pending MTI special inspections, tests and approvals.
BLD-Other7/29/20137/30/20137/30/2013APART
DetailsJim Sly
call 1/2 hr ahead//rebar // darren Phone #: ###-####
Panels 18, 19, 20, 21, 23 ,24 ,25, 26 ,27, 7 ,8 ,9, 10, 11, 12, 13, 14, 15, 16, and 17. Pending MTI special inspection, tests and approvals. Panels pending MTI inspection include.....1, 2, 3, 4, 5, 6, and trash enclosure panels.
Approved plans on site.
FIRE-Conference7/11/20137/12/20137/12/2013ADONE
DetailsTroy Cobbley
Daren, Don and I discussed options to get the fire sprinkler supply piping down to the proper depth of cover once it leaves the United Water stub out.
OVERRIDE  6/14/2013  
Issue PAID IN FULL permit  6/14/2013 DONE
DetailsTisha Gallop
Telephone call  6/14/2013 DONE
DetailsChristina Prado
called Cornel to advise permit is ready pending ACHD and gave fees due
Permit Ready to Issue  6/14/2013 DONE
DetailsChristina Prado
Routing - PUBLIC WORKS6/12/2013 6/13/2013 PASS
DetailsBeverly Mountain
Routing PW Sewer Design6/12/2013 6/13/2013 PASS
DetailsKyle S. Rosenmeyer
Routing - PLAN CHECK6/13/2013 6/13/2013 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/13/2013 DONE
DetailsJohn Menard
Inspection Record Card- Bld  6/13/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  6/13/2013 DONE
Plan assigned to (JCM)4/19/2013 6/13/2013 PASS
DetailsJohn Menard
1st Review Complete 05/20/2013 JCM
Routing PW Solid Waste  6/12/2013 PASS
DetailsPeter J. McCullough
Plan Reviewer's activity  6/11/2013 PASS
DetailsJohn Menard
Reviewed and approved final requested revisions items. JCM
Routing - PLUMBING6/7/2013 6/10/2013 PASS
DetailsDaryl Spivey
Plan resubmittals received  6/10/2013 DONE
DetailsTisha Gallop
received two copies of plan sheets E0.02, C1.0, C2.1, C2.2, C2.3 and O & M Manual; inserted by arch. rep. and taken back to John Menard.
Plan resubmittals requested  6/7/2013 DONE
DetailsJohn Menard
E-mailed the architect requesting two copies of revised plan sheet E0.02. JCM
Routing - PLAN CHECK6/7/2013 6/7/2013 FAIL
DetailsJohn Menard
Routing - PUBLIC WORKS6/3/2013 6/7/2013 FAIL
DetailsConnie Baumgartner
Failed by Kyle for sewer design.
Routing PW Solid Waste  6/7/2013 PASS
DetailsPeter J. McCullough
Routing PW Sewer Design6/5/2013 6/6/2013 FAIL
DetailsKyle S. Rosenmeyer
Install new tap in N. Discovery Way. Retain existing cleanout for use by YMCA. Obtain private sewer easement with YMCA and submit copy to the City.
Routing PW Drainage6/3/2013 6/5/2013 PASS
DetailsBrian Murphy
Routing - PLAN CHECK5/28/2013 6/3/2013  
DetailsJohn Menard
Plan resubmittals received  5/30/2013  
Received 1 copy of Response letter from Cornel Larson dated 5-29-13 to John Menard, 1 copy of plan review comments from John Menard dated 5-20-13, 1 copy of recorded sewer easement agreement, 1 copy of recorded prepetual storm water cross drainage easment agreement, 2 copies of sheets 0, L-1, SP-1, SP-2, A-1, A-2, A-4, A-5, A-6, A-7, A-8, A-10, A-11, S.01, S1.1, S1.2, S2.1, S6.1, S6.2, S7.1, S8.1, S9.1, S9.2, S10.4, S10.5, M0.00, M0.01, M2.11, M2.12, M3.00, M4.00, P0.00, P2.11 and taken back to John Menard's desk
Routing - FIRE5/20/20135/20/20135/28/2013 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  5/28/2013 FAIL
Failed PW, Plan Check, Structural
Route to Impact Fee Review5/20/20135/23/20135/21/2013 PASS
DetailsCindy M. Gould
Route to Impact Fee Review4/19/20134/24/20135/21/2013 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/9/2013 5/20/2013 FAIL
DetailsJohn Menard
Plan resubmittals requested  5/20/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING5/8/2013 5/9/2013 PASS
DetailsJosh Wilson
DRH13-00032
Routing - PLUMBING5/3/2013 5/8/2013 PASS
DetailsDaryl Spivey
1. Lavs supplied by 30 gal. water heater shall have tempering device installed.
2. Civil plans show 1 inch water service. Plumbing plans show 1 1/2 inch water. Need to increase water service to 1 1/2 inch.
Routing - Erosion and Sediment4/30/2013 5/3/2013 PASS
DetailsKimberly M. Johnson
LM for PD 5/1 to ask about discharges to inlets on Discovery and Bridger to subsurface seepage bed and for documentation for not filing the eNOI.

Still waiting for call back from PD. LM for ACHD on 5/2 to confirm drainage system on Discovery and Bridger.

5/3/13 - ACHD confirmed drainage on Discovery and Bridger but noted that a surface connection to waters of the US exists at the intersection of Lasalle and Discovery. The burden of proof to prove there is no discharge potential is with the owner/operator. Noted this connection on the plan.
Routing - PUBLIC WORKS4/19/2013 4/30/2013 FAIL
DetailsBeverly Mountain
Engineering and Drainage
Plan resubmittals received  4/30/2013 DONE
DetailsChristina Prado
Received three sets of plans sheet S2.1 as well as revised structural calcs; plans brought back to ESC review where they were taken from
Routing PW Sewer Design4/25/2013 4/29/2013 FAIL
DetailsKyle S. Rosenmeyer
Install new tap in N. Discovery Way. Retain existing cleanout for use by YMCA. Provide copy of recorded private sewer easement to the city.
Routing PW Drainage4/23/2013 4/25/2013 FAIL
DetailsBrian Murphy
NEED CROSS DRAINAGE ACCESS AGGREEMENT
Plan resubmittals requested  4/24/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting additional calculations. JCM
Routing Off Site - STRUCTURAL4/19/2013 4/23/2013 FAIL
DetailsJohn Menard
Received letter from consulting structural engineer requesting revisions. JCM
Routing PW Sewer Rating4/23/2013 4/23/2013 PASS
DetailsConnie Baumgartner
Fees assessed on Tenant Improvements. This is only the shell.
Routing - Addressing  4/22/2013 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div4/19/2013 4/19/2013 PASS
DetailsDave Abo
Parcel "A" of ROS 9342.
Recd Pcfee & Taken To Pln CK  4/19/2013 DONE
Plans ACCEPTED BY PLAN TECH  4/19/2013 DONE
Pending Assignment by JCM4/19/2013 4/19/2013 DONE
DetailsJohn Menard
Telephone call  4/19/2013 DONE
DetailsChristina Prado
called action couriers for pick up
Application received 4/19/2013