DOC - Permit Expired | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Jim Storey
|
|
|
ncfi fire/bld
|
PubWorks Occupancy Approval | 3/11/2014 | 3/11/2014 | 3/11/2014 | | DONE |
Jason C. Taylor
|
|
|
Project completed. Jason Taylor ###-####
|
Inspection Record Card- Bld | | | 6/7/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 6/6/2013 | | |
|
|
|
|
Routing - FIRE | 5/23/2013 | | 6/6/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Sewer Design | | | 6/6/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 6/6/2013 | | 6/6/2013 | | PASS |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
Called and left a voice message for Matt Munger that permit is ready, fees due, need GC & RP on 6-6-13 @ 4:40pm//BAS
|
Permit Ready to Issue | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 5/7/2013 | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
Barb
|
Routing PW Street Lights | 5/7/2013 | | 5/28/2013 | | PASS |
Mike D Hedge
|
|
|
|
Case Summary (BLD) | | | 5/20/2013 | | DONE |
|
|
|
|
Routing - Design Review | 5/20/2013 | | 5/20/2013 | | PASS |
Josh Wilson
|
|
|
Design Review approved and appeal period expired.
|
Plan Reviewer's activity | | | 5/15/2013 | | DONE |
|
|
|
Emailed RP failed review.
|
Routing - FIRE | | | 5/15/2013 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 5/13/2013 | | 5/13/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Sewer service provided in this location is 4". Please downsize building service to 4" if possible or connect to one of the two available 6" services from the manholes adjacent to the property in Federal Way.
|
Routing - Erosion and Sediment | 5/7/2013 | | 5/9/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - Design Review | 5/6/2013 | | 5/9/2013 | | FAIL |
Josh Wilson
|
|
|
Design REview approval has not been issued.
|
Routing PW Drainage | 5/7/2013 | | 5/8/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 5/8/2013 | | 5/8/2013 | | PASS |
Dave Abo
|
|
|
Parcel "A" of ROS 5249.
|
Routing - Addressing | 5/8/2013 | | 5/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/7/2013 | | 5/7/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 5/7/2013 | | PASS |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 4/22/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 22 2013 1:05PM
|
Intake Approval | | | 4/22/2013 | | FAIL |
Barbara Stitt
|
|
|
Please see list below of corrections needed to complete intake of your project:
1. Please fill out and upload completed #524 checklist.
2. Form #304-Registered Design Professional form
3. Soils and Geotechnical Report.
4. Site Specific fire flow at hydrants letter.
5. Drainage System Operation & Maintenance Plan.
Please contact me if you have any questions at ###-####
Thanks,