Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD13-00965
StatusFinaled
Name BRYANTS CONSTRUCTION
Site Address 1411 N 12TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
### 6-26-2013 THIS PROJECT IS MODIFIED TO REFLECT THE REDUCTION OF THE ROOF SLOPE AND ATTIC AREA 6-26-2013 PEP###***6-4-2013 THIS PROJECT IS MODIFIED TO REFLECT THE CONSTRUCTION OF ONE MORE DORMER TO THE OTHER SIDE OF THE ROOF PEAK. ADDED VALUE $1,000.00 ADDED VALUE TO THE PROJECT. 6-4-2013 pep****This project is for the construction of a new 576s.f. detached garage and the framing up of 2-new dormers in the roof of the upper level in an existing single family dwelling. R-1CH ok per DRH13-00105 by Matt Halitsky. Separate electrical and ESc permits are required. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/25/20137/25/20137/25/2013PDONE
DetailsTony Young
alex Phone #: ###-####
DOC - Permit Finaled7/25/20137/25/20137/25/2013PPASS
DetailsTony Young
Zoning Approval7/25/20137/25/20137/25/2013 DONE
DetailsSarah Schafer
BLD-Final7/12/20137/12/20137/16/2013PPEND
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by anthony bryant,, needs zoning
BLD-Framing/Rough-in7/15/20137/16/20137/16/2013ADONE
DetailsTony Young
anthony Phone #: ###-####
Routing Walk-In (BLD)7/12/20137/12/20137/15/2013PPASS
DetailsPerry Paine
As the roof structure has been changed (lumber sizes this new structure has been reviewed and approved by me with no changes required. There is to be no no storage allowed of ceiling cover allowed on the ceiling joists with this new design. 7-12-2013
BLD-Final7/11/20137/11/20137/11/2013PCANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by anthony bryant // Anthony called and cancelled insp at 1:05 pm, called inspector. - leg
BLD-Wall cover7/5/20137/5/20137/5/2013PPART
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by anthony bryant,, roof ok to cover
BLD-Framing/Rough-in7/3/20137/5/20137/5/2013ANR
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by anthony bryant,, needs electrical 1st
BLD-Footing6/27/20136/28/20136/28/2013APASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by anthony bryant,, gatrage ,, monolithic
Routing Walk-In (Zoning)6/26/20136/26/20136/26/2013APASS
DetailsMatthew A Halitsky
changed detatched garage from 2 story to 1 story building
Routing Walk-In (BLD)6/26/20136/26/20136/26/2013APASS
DetailsPerry Paine
Case Summary (BLD)  6/26/2013  
Inspection Record Card- Bld  6/26/2013  
BLD-Final6/17/20136/17/20136/17/2013PNR
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by anthony bryant,, dormers up,, covered without inspection,, owners ok with that,, storage only areas,, not sleeping rooms per contractor and owners
Routing Walk-In (BLD)6/4/20136/4/20136/4/2013ADONE
DetailsPerry Paine
Inspection Record Card- Bld  6/4/2013  
PLANS/APPL TAKEN TO FRONT DESK  6/4/2013 DONE
Case Summary (BLD)  6/4/2013  
Reopen Permit (ISS)  6/4/2013 DONE
DetailsTisha Gallop
(F) Reprint permit  6/4/2013 DONE
DetailsTisha Gallop
OVERRIDE  4/22/2013  
Routing Walk-In (Zoning)4/22/20134/22/20134/22/2013PPASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)4/22/20134/22/20134/22/2013PDONE
DetailsPerry Paine
Plan assigned to (PEP)4/22/20134/22/20134/22/2013 PASS
DetailsPerry Paine
Case Summary (BLD)  4/22/2013  
1st review completed  4/22/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/22/2013 DONE
Permit Ready to Issue  4/22/2013 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  4/22/2013 DONE
DetailsTisha Gallop
Application received 4/22/2013