Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-00988
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 2306 N 25TH ST
Project Name 
Customer Number 
ePlanReviewYes
Description
Demo current home and build a new home. Permit for the construction of a new 1,588 sq. ft., two story (first story 828 sq. ft., second story 760 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 180 sq. ft. of covered patio/porch and a 500 sq. ft. detached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/21/20145/21/20145/21/2014PPASS
DetailsTony Young
Zack ###-####
DOC - Permit Finaled5/21/20145/21/20145/21/2014PPASS
DetailsTony Young
c of o issued
BLD-Final5/15/20145/16/20145/16/2014ANR
DetailsJim Sly
Zack Phone #: ###-####
Need Electr final Then call for ESC and Sruct. finals.
FIRE-Final Inspection5/14/20145/14/20145/15/2014PCANC
DetailsTroy Cobbley
No life safety sign off required.
BLD-Final5/15/20145/15/20145/15/2014PPASS
DetailsTony Young
Justin Phone #: ###-####
BLD-Final5/14/20145/15/20145/15/2014APEND
DetailsTony Young
Zack Phone #: ###-####
BLD-Final5/14/20145/14/20145/14/2014PNR
DetailsTony Young
Zack Phone #: ###-####
BLD-Energy code compliance3/11/20143/12/20143/12/2014PPASS
DetailsTony Young
Zach Phone #: ###-####
BLD-Framing/Rough-in3/11/20143/12/20143/12/2014APART
DetailsTony Young
Zach Phone #: ###-####,, ok to insulate ,, need truss corrections,, bracing
BLD-Framing/Rough-in3/11/20143/11/20143/11/2014PPEND
DetailsTony Young
Zach Phone #: ###-####,, needs mech pass,, needs truss bracing per engineering. truss hanger. will need interior shear
BLD-Framing/Rough-in3/10/20143/11/20143/11/2014APEND
DetailsTony Young
Zach Phone #: ###-####,, need trades
BLD-Other3/4/20143/5/20143/5/2014PPART
DetailsTony Young
Drywall in eaves-Zack Phone #: ###-####wip, ok
BLD-Framing/Rough-in3/4/20143/4/20143/4/2014PPART
DetailsTony Young
Drywall in eaves-Zack Phone #: ###-####,, work in progress,, ok so far
BLD-Wall Bracing2/18/20142/19/20142/19/2014APART
DetailsTony Young
Zach Phone #: ###-####,, exterior ok... may want to redesign front of house to eliminate double shear
BLD-Foundation1/21/20141/21/20141/21/2014PPASS
DetailsTom Arcoraci
Zack Luff Phone #: ###-####
Plan assigned to (CDM)12/3/201312/3/201312/4/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK12/3/2013 12/4/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  12/4/2013 DONE
CHANGE STATUS TO (ISS)  12/4/2013 DONE
DetailsTisha Gallop
plan mod approved, no fee due.
Routing - Design Review12/3/2013 12/3/2013 PASS
DetailsJosh Wilson
Ok per revsied elevations/floor plan JGW 12-3-13
Plan Modification Accepted  12/3/2013 DONE
DetailsTisha Gallop
plan mod to increase size of and add 2 windows; received two paper copies of main/upper floor plan, front/right elevations and new rescheck; routed to Carl Madsen.
BLD-Footing11/30/201312/2/201312/2/2013APASS
DetailsTony Young
Jarod Phone #: ###-####
BLD-Footing11/29/201311/29/201311/30/2013PPEND
DetailsTony Young
Jarod Phone #: ###-####
BLD-Footing11/27/201311/29/201311/29/2013ADEFR
DetailsTony Young
Jarod Phone #: ###-####, defr to afternoon
Inspection Record Card- Bld  11/18/2013 DONE
Issue PAID IN FULL permit  8/9/2013 DONE
DetailsChristina Prado
OVERRIDE  6/14/2013  
Plan assigned to (CDM)5/13/20135/13/20136/14/2013 PASS
DetailsCarl D Madsen
ePlan review First review completed 5-22-13 CDM
Routing - PLAN CHECK6/14/2013 6/14/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/14/2013 DONE
Inspection Record Card- Bld  6/14/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/14/2013 DONE
Permit Ready to Issue  6/14/2013 DONE
DetailsChristina Prado
1st review completed  5/22/2013 FAIL
Routing - PLAN CHECK5/13/2013 5/22/2013 FAIL
DetailsCarl D Madsen
ePlan review Wall bracing calculations 5-22-13 CDM
Route to Impact Fee Review5/13/20135/16/20135/14/2013 PASS
DetailsCindy M. Gould
Routing - MECHANICAL5/13/2013 5/14/2013 PASS
DetailsTroy James
eplan
Routing - PLANNING5/13/2013 5/14/2013 PASS
DetailsJosh Wilson
Routing - Addressing5/13/2013 5/14/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS5/13/2013 5/14/2013 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  5/13/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/13/2013 DONE
DetailsChristina Prado
Intake Approval  5/2/2013 PASS
DetailsChristina Prado
Intake Approval  4/30/2013 FAIL
DetailsTisha Gallop
sheet orientation and naming conventions. Carl Madsen ok'd everything else.
Application received  4/24/2013 DONE
Application submitted via PDS Online on Apr 24 2013 6:09PM