BLD-Final | 10/16/2013 | 10/17/2013 | 10/17/2013 | P | NR |
Mike Jordan
|
|
|
Please contact me 30 minutes prior. While in route. I will meet you there. Thanks Phone #: ###-#### >> Inspection requested via web by Matt Perry. Needs firsprinkler and life/safety finals.
|
CHANGE STATUS TO (ISS) | | | 8/9/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/9/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/6/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/6/2013 | | DONE |
Barbara Stitt
|
|
|
Called Mike Dahlberg and told him that permit is ready & fees due on 8-6-13 @ 8:50am//BAS
|
Plan assigned to (TLW) | 7/31/2013 | | 8/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/31/2013 | | 8/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/5/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 7/31/2013 | | DONE |
|
|
|
Rec'd plan mod to upgrade restrooms on first and second floor - sheets A004; A005; A106
|
FIRE-Conference | 6/10/2013 | 6/10/2013 | 6/10/2013 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I discussed general life safety requirements. We also discussed problems with the sprinkler coverage at the new soffits and possible fire alarm modifications being needed due to new wall arrangements.
|
BLD-Framing/Rough-in | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PART |
Mike Jordan
|
|
|
bob Phone #: ###-####. iNterior steel stud framed wall. Needs to submit plan mod, wall has been relocated.
|
BLD-Ceiling Grid Inspection | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Mike Jordan
|
|
|
BOB Phone #: ###-####
|
BLD-Framing/Rough-in | 5/1/2013 | 5/2/2013 | 5/2/2013 | P | PART |
Mike Jordan
|
|
|
Bob Phone #: ###-####. interior steel stud walls ok. pending electrical rough in inspection at areas not yet inspected.
|
Issue PAID IN FULL permit | | | 5/1/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 4/26/2013 | | 4/30/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/30/2013 | | 4/30/2013 | | PASS |
Tim L. Woodard
|
|
|
After discussion with the Building Official it has been allowed to continue with this project. No additional permits can be issued to this parcel until the restrooms are upgraded to comply fully with current accessibility standards. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/30/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/30/2013 | | DONE |
Tisha Gallop
|
|
|
called Mike Dahlberg and told him permit is ready and fees due.
|
Routing - PLAN CHECK | 4/26/2013 | | 4/29/2013 | | PEND |
Tim L. Woodard
|
|
|
Pending approval from BO on accessible upgrade requirement. TLW
|
1st review completed | | | 4/29/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2013 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2013 | | |
|
|
|
4-25-13 ok per Tim W to take in as a level 1
|
Application received | | 4/25/2013 | | | |
|
|
|
|