Permit Information
Permit NumberBLD13-01006
StatusFinaled
Name VISSER BUILDING CO
Site Address 125 W THORNBERRY CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit has been modified to downsize from an 100 sq. ft. second story addition to an 812 sq. ft. second story addition. This permit in the WUI Foothills area is to include a new 812 s.f. upper level with a new code complying stair along with the infill of an existing alcove to allow for the relocation of the laundry room area powder room and stairway construction along with 160s.f. to the master suite. Separate electrical, plumbing, mechanical and ESC permits are required. Need GC -- R-1B setbacks ok per David Moser. All per the approved plans as marked, energy prescriptive method; Engineer’s details and the plan review notes. pep

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works and a final letter from the project civil engineer must be submitted to Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/201312/18/201312/18/2013APASS
DetailsTony Young
Bob Phone #: ###-####
DOC - Permit Finaled12/18/201312/18/201312/18/2013PPASS
DetailsTony Young
c of c issued
PubWorks Occupancy Approval12/17/201312/17/201312/17/2013 DONE
DetailsBrian Murphy
BLD-Other10/22/201310/22/201310/22/2013PPASS
DetailsTony Young
Sofits & drywall for WUI req - Bob Phone #: ###-####
BLD-Energy code compliance9/10/20139/11/20139/11/2013APASS
DetailsTony Young
bob Phone #: ###-####
BLD-Energy code compliance9/10/20139/10/20139/10/2013PNR
DetailsTony Young
bob Phone #: ###-####
BLD-Energy code compliance9/9/20139/10/20139/10/2013APEND
DetailsTony Young
bob Phone #: ###-####
BLD-Other9/9/20139/10/20139/10/2013APART
DetailsTony Young
soffits,, bob Phone #: ###-####
BLD-Energy code compliance9/9/20139/9/20139/10/2013PPART
DetailsTony Young
bob Phone #: ###-####,, seal pack only ok
BLD-Framing/Rough-in9/9/20139/9/20139/9/2013PPART
DetailsTony Young
bob Phone #: ###-####,, verify sprinklers
Plan resubmittals received  8/30/2013 DONE
new manual j
Routing - MECHANICAL8/30/2013 8/30/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Energy code compliance8/23/20138/23/20138/23/2013PPASS
DetailsTony Young
master bath,, bedroom ok
BLD-Wall Bracing8/22/20138/23/20138/23/2013APASS
DetailsTony Young
bob Phone #: ###-####
BLD-Framing/Rough-in8/22/20138/23/20138/23/2013APART
DetailsTony Young
bob Phone #: ###-####,, master area ok
BLD-Framing/Rough-in8/16/20138/16/20138/16/2013PPART
DetailsTony Young
bob Phone #: ###-####,, master bath area ok to insulate
BLD-Energy code compliance8/16/20138/16/20138/16/2013PPEND
DetailsTony Young
bob Phone #: ###-####,, frame only,, master bath area ok to insulate
BLD-Foundation7/16/20137/17/20137/17/2013APASS
DetailsTony Young
Bob Phone #: ###-####
BLD-Footing7/15/20137/16/20137/16/2013APASS
DetailsTony Young
Bob Phone #: ###-####,, monolithic ok
PubWorks Subgrade Approval7/16/20137/16/20137/16/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approved from geotechnical engineer (MTI). Building department may be scheduled for footing inspection. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/2/2013 DONE
DetailsTisha Gallop
Case Summary (BLD)  7/2/2013 DONE
OVERRIDE  5/14/2013  
Telephone call  5/14/2013 DONE
DetailsChristina Prado
called Clinton to advise permit is ready pending GC & RP and gave fees due
Inspection Record Card- Bld  5/14/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  5/14/2013 DONE
DetailsChristina Prado
Plan assigned to (PEP)5/6/20135/6/20135/13/2013 PASS
DetailsPerry Paine
Inspection Record Card- Bld  5/13/2013  
1st review completed  5/13/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/13/2013 DONE
Routing - Erosion and Sediment5/8/2013 5/10/2013 PASS
DetailsKimberly M. Johnson
approved with redlines
Plan resubmittals requested  5/6/2013 FAIL
need WUI details
1st review completed  5/6/2013 FAIL
insufficient information
Routing - MECHANICAL4/30/2013 4/30/2013 PASS
DetailsTroy James
Routing Walk-In (PW Hillside)4/26/20134/26/20134/26/2013APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works and a final grading letter must be recieved from the project engineer. Call Jason Taylor at ###-####.
Routing Walk-In (Zoning)4/26/20134/26/20134/26/2013APASS
DetailsDavid Moser
Routing - Erosion and Sediment4/26/2013 4/26/2013 FAIL
DetailsKimberly M. Johnson
1. There is no description of the construction activity to be performed in the narrative.
2. Please update the potential list of pollutants so that it is comprehensive of all pollutants and pollutant generating activities typical for this type of construction. This includes more than tracking and portable restroom waste.
3. The narrative states that material storage and parking will occur on the access road. Is this a construction access road or a public road? Material storage areas must be shown on the map and included within the limits of disturbance. Material storage occurring within a public right of way must have prior approval from ACHD.
4. Your plan indicates that NPDES coverage is required because it is a part of a common plan of development. Please confirm that this meets the definition of a common plan of development. Take note that if NPDES coverage is required, the plan submitted does not meet federal SWPPP requirements.
5. Please include measures in the narrative for concrete and paint washout. Show on the map a detail and location for the washout.
6. Please show on the map any storm drains and required BMPs located on Thornberry that could receive discharges from the project. Include a description for this in the narrative.
7. The drawing shows the existing driveway to be used for the stabilized exit however there is no access for the construction occurring on the southeast side of the property. Is there adequate access for concrete placement on the side addition? If not, what is the plan for gaining access to the side yard with construction equipment? Please revise the disturbance limits accordingly.
8. Lastly, these comments are mostly the same comments we discussed via telephone on April 16, 2013 for a previous erosion control plan. submittal. Please update your template and incorporate these comments in your future submittals.
Application received 4/26/2013