DOC - Permit Expired | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/8/2013 | 5/8/2013 | 5/8/2013 | P | PASS |
Jim Storey
|
|
|
perry Phone #: ###-#### Call for access c/n made ok
|
Routing Walk-In (BLD) | 5/8/2013 | 5/8/2013 | 5/8/2013 | A | PASS |
Perry Paine
|
|
|
modify floor framing ok
|
BLD-Framing/Rough-in | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | FAIL |
Jim Sly
|
|
|
perry please call for access Phone #: ###-#### Framing does not match approved plan. Provide Engineering for what's built. C/N posted.
|
Routing Walk-In (Zoning) | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
David Moser
|
|
|
R-1C setbacks OK as per CU-115-90.
|
Routing Walk-In (BLD) | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/26/2013 | 4/26/2013 | 4/26/2013 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 4/26/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2013 | | |
|
|
|
|
1st review completed | | | 4/26/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/2013 | | DONE |
|
|
|
|
Application received | | 4/26/2013 | | | |
|
|
|
|