BLD-Final | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Tony Young
|
|
|
done
|
Zoning Approval | 1/14/2015 | 1/14/2015 | 1/14/2015 | | DONE |
Matthew A Halitsky
|
|
|
North elevation changes transferred to separate permit.
|
BLD-Final | 3/3/2014 | 3/3/2014 | 3/3/2014 | P | PEND |
Tony Young
|
|
|
JIm Phone #: ###-####,, pending zoning
|
Zoning Approval | 2/28/2014 | 2/28/2014 | 2/28/2014 | | FAIL |
Matthew A Halitsky
|
|
|
North elevation unfinished. Paint and landscaping. Notified owner by email 2-28-2014.
|
BLD-Conference | 11/13/2013 | 11/13/2013 | 11/13/2013 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####,, handrail ?s
|
Telephone call | | | 11/6/2013 | | DONE |
|
|
|
11-0102013 With Applicant / owner Danielle, Mentioning the uniform commercial code relating to the installation of windows in this project. I mentioned that the issue with the contractor would be a civil matter as long as no violations of the IRC and IECC at the time of required inspections. pep
|
BLD-Conference | 10/29/2013 | 10/30/2013 | 10/30/2013 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2013 | 10/2/2013 | 10/3/2013 | P | PASS |
Tony Young
|
|
|
|
BLD-Footing | 8/9/2013 | 8/12/2013 | 8/12/2013 | P | PART |
Jim Sly
|
|
|
shawn Phone #: No string lines pulled and un-able to determine exact property line location. Owner (Quint) said variance given for small enchoachment into setback.
|
Plan assigned to (PEP) | 7/19/2013 | 7/19/2013 | 8/5/2013 | | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 7/19/2013 | | |
|
|
|
|
Case Summary (BLD) | | | 7/19/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/11/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 6/11/2013 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/29/2013 | 4/29/2013 | 4/29/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2013 | | |
|
|
|
|
1st review completed | | | 4/29/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2013 | | DONE |
|
|
|
|
Application received | | 4/29/2013 | | | |
|
|
|
|