BLD-Final | 7/16/2013 | 7/17/2013 | 7/17/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brian Phone #: ###-####
|
FIRE-Final Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | P | PASS |
Tom Arcoraci
|
|
|
all items completed
|
FIRE-Final Inspection | 7/16/2013 | 7/17/2013 | 7/17/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on the doors into the building lobby as per the approved plans, the door is missing from the mezzanine/stairway into the building lobby. Provide door that will maintain any rated assembly if required or get plan review approval that the door can be deleted (per later conversation with Tim it appears the door is part of a rated assembly). The fire extinguisher on the mezzanine is expired.
|
Permanent Occupancy | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | NR |
Forrest France
|
|
|
Brian Phone #: ###-#### *Previous correction items are not completed per phone conversation with tenant*
|
FIRE-Final Inspection | 5/31/2013 | 6/3/2013 | 6/3/2013 | A | FAIL |
Forrest France
|
|
|
Modifications to the existing hood suppression system will require a permit, provide EM lighing as discussed, post accurate max. occupant load signage per current plan notes, PFE at the second level is overdue.
|
Issue PAID IN FULL permit | | | 5/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 4/30/2013 | | 5/13/2013 | | PASS |
Tim L. Woodard
|
|
|
Failed PW Occupancy
|
Routing - PUBLIC WORKS | 5/13/2013 | | 5/13/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 5/13/2013 | | 5/13/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/13/2013 | | 5/13/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/13/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/13/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/13/2013 | | |
|
|
|
|
Telephone call | | | 5/13/2013 | | |
|
|
|
5-13-13 called Brian MCGill left message permit ready for pickup///dld
|
Routing PW Environmental | 5/9/2013 | | 5/9/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PLAN CHECK | 5/1/2013 | | 5/1/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 4/30/2013 | | 5/1/2013 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/1/2013 | | 5/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/1/2013 | | 5/1/2013 | | FAIL |
Walt Baumgartner
|
|
|
Reviewed by Terry Alber - no grease abatement shown, grease abatement required!!! contact Terry at ###-####
|
1st review completed | | | 5/1/2013 | | DONE |
Tim L. Woodard
|
|
|
Failed PW
|
Routing - Addressing | 4/30/2013 | | 4/30/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/30/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/30/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 7/27/2013 | | | |
|
|
|
|
Application received | | 4/30/2013 | | | |
|
|
|
|