Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-01049
StatusFinaled
Name ESI
Site Address 410 S VICTORIA DR
Project NameDepot Lofts
Customer Number 
ePlanReviewNo
Description
Depot Lofts Apartments - Building #2 - To construct a new 10,960 square foot, three story, wood framed, 12 unit apartment building and related site improvements. This building will be fire sprinkled with a 13R sprinkler system. The sprinklers will be used for a story increase. There are three two bedroom with two bath units, three two bedroom with one bath units and six one bedroom with one bath units. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/6/2020 DONE
PubWorks Occupancy Approval1/23/20151/23/20151/23/2015 DONE
DetailsTiffany Lowery
Zoning Approval8/7/20148/7/20148/7/2014 DONE
DetailsAndrea Tuning
PubWorks Occupancy Approval8/7/20148/7/20148/7/2014 DONE
DetailsJason C. Taylor
Permanent Occupancy  8/7/2014 DONE
DetailsTisha Gallop
BLD-Final7/30/20147/30/20147/30/2014APASS
DetailsJim Storey
Phone #: 2084848576 >> Inspection requested via mobile web by Kelly Perryman
FIRE-Final Inspection7/28/20147/28/20147/28/2014PPASS
DetailsCraig D. Hanson
Pass
BLD-Wall cover4/25/20144/28/20144/28/2014APART
DetailsJim Storey
Phone #: 7894243 >> Inspection requested via mobile web by Dan Burchett reviewed i joist repairs ok pending nail vs screw aplacation.
BLD-Wall cover4/23/20144/24/20144/24/2014AFAIL
DetailsJim Storey
Phone #: 7894243 >> Inspection requested via mobile web by Dan Burchett fire stop ceilling penatrations at drop ceilling areas.
BLD-Energy code compliance4/15/20144/16/20144/16/2014PPASS
DetailsJim Storey
Phone #: 7894243 >> Inspection requested via mobile web by Dan Burchett
BLD-Framing/Rough-in4/10/20144/11/20144/11/2014PPASS
DetailsJim Storey
Phone #: 7894243 >> Inspection requested via mobile web by Dan Burchett
BLD-Other3/12/20143/13/20143/13/2014PPASS
DetailsJim Storey
Phone #: 7894243 >> Inspection requested via mobile web by Dan Burchett sheer nailling/ stairs/ insulation and prerock ok behind tubs.
Routing - Addressing3/7/2014 3/7/2014 PASS
DetailsJason C. Taylor
Addresses have been updated to Victoria Dr from Vista. There is no access to Vista.
Case Summary (BLD)  1/24/2014 DONE
BLD-Concrete1/15/20141/15/20141/16/2014PPASS
DetailsJim Storey
dale - ###-#### - slab on grade
BLD-Footing12/5/201312/6/201312/6/2013ACANC
DetailsJim Storey
Dale Phone #: ###-####
BLD-Footing12/2/201312/2/201312/2/2013PPASS
DetailsJim Storey
Dale Phone #: ###-####
Issue PAID IN FULL permit  10/15/2013 DONE
DetailsChristina Prado
Expiration Notice10/8/201310/29/201310/8/2013 DONE
DetailsChristina Prado
Routing - PLAN CHECK9/4/2013 9/5/2013 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  9/5/2013 DONE
DetailsJohn Menard
Print Occupancy Form  9/5/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  9/5/2013 DONE
DetailsBarbara Stitt
Telephone call  9/5/2013 DONE
DetailsTisha Gallop
e-mailed Mark Sanders permit is ready, fees due, need ACHD, GC and grading/erosion permit must be issued before or at same time as this permit.
Plan assigned to (JCM)4/30/2013 9/5/2013 PASS
DetailsJohn Menard
1st Review completed 06-06-2013
Routing - PLAN CHECK9/3/2013 9/4/2013 PASS
DetailsJohn Menard
Plan resubmittals received  9/4/2013 DONE
DetailsChristina Prado
received two sets revised plan sheets marked A5.0 & L1.0 as well as one response letter; Taken to John Menard for review
Routing - Design Review9/4/2013 9/4/2013 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK7/24/2013 9/3/2013  
DetailsJohn Menard
Routing - Design Review9/3/2013 9/3/2013 FAIL
DetailsAndrea Tuning
The building elevations and landscape plan have not been updated to match the Design Review Approval.
Plan resubmittals received  7/24/2013 DONE
DetailsChristina Prado
received three set of response letters, revised structural calcs and plans sheets marked A2.2, A2.4, A4.0, A10.0, S2.0 & S2.1;Plans inserted by arch and taken back to John for further review
Routing - Design Review6/13/2013 7/24/2013 FAIL
DetailsAndrea Tuning
The submitted plans do not match the approved site plan, landscape plan and elevations that were approved wtih the Design Review application. The applicant will be required to submit a Design Review Modification application. I left a message wtih John Price on 7-24-13.
Routing Off Site - STRUCTURAL6/26/2013 7/3/2013 FAIL
DetailsJohn Menard
Plan resubmittals requested  7/3/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structural review requesting revisions. JCM
Plan Reviewer's activity  7/2/2013 PASS
DetailsJohn Menard
Reviewed and approved requested revisions. JCM
Plan resubmittals received  6/26/2013 DONE
DetailsChristina Prado
received three sets of revised structural calcs, two response letters and three sets of plans marked L1.0, L2.0, A1.0, A1.2, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A4.0, A4.1, A4.2, A4.3, A4.4, A5.0, A8.0A8.1, A9.0, A10.0, A10.1 & S0.0; Plans inserted by arch rep and taken to John Menard for review
Telephone call  6/26/2013 DONE
DetailsChristina Prado
called action couriers for pick up
Routing - PLAN CHECK6/12/2013 6/13/2013 FAIL
DetailsAndrea Tuning
Routing - PLANNING6/13/2013 6/13/2013 PASS
DetailsDavid Moser
Route to Design Review; the ROS is complete
Routing - PLANNING Land Div6/13/2013 6/13/2013 PASS
DetailsDave Abo
Parcel A of ROS 9441.
Routing - FIRE6/6/20136/6/20136/12/2013 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  6/12/2013 FAIL
Failed PW, Plumbing, ESC, Addressing, Planning
Route to Impact Fee Review6/6/20136/11/20136/7/2013 PASS
DetailsCindy M. Gould
Plan resubmittals requested  6/7/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review comment list. JCM
Routing - PLAN CHECK5/14/2013 6/6/2013 FAIL
DetailsJohn Menard
Route to Impact Fee Review4/30/20135/3/20136/3/2013 PASS
DetailsCindy M. Gould
Routing - MECHANICAL5/17/2013 5/17/2013 PASS
DetailsTroy James
Routing - PLAN CHECK5/16/2013 5/17/2013  
DetailsJohn Menard
Routing - Erosion and Sediment5/16/2013 5/16/2013 PASS
DetailsKimberly M. Johnson
Plan approved. Noted on plan that it does not meet federal SWPPP requirements
Plan resubmittals received  5/16/2013 DONE
DetailsTisha Gallop
received two copies of ESC narrative and plan sheets ESC1.0, ESC2.0; inserted into plans by permit tech and routed to Erosion review.
Routing PW Drainage5/15/2013 5/16/2013 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS5/15/2013 5/16/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing5/15/2013 5/15/2013 PASS
DetailsJason C. Taylor
Routing - Design Review5/14/2013 5/14/2013 FAIL
DetailsSarah Schafer
Needs record of survey completed.
Routing - PLANNING5/13/2013 5/14/2013 FAIL
DetailsDavid Moser
Need to complete ROS13-28 to combine the lots.
Routing - MECHANICAL5/9/2013 5/13/2013 FAIL
DetailsTroy James
emailed corrections to Building Energy
Plan resubmittals received  5/10/2013 DONE
DetailsChristina Prado
received 5 revised sets of grading sheets marked C3.1; two sets inserted into plans sheets and returned to mechanical
Routing - PLUMBING5/7/2013 5/9/2013 PASS
DetailsBill VanDegrift
Per plan and 2009 ISPC.
Routing Off Site - STRUCTURAL5/1/2013 5/8/2013 FAIL
DetailsJohn Menard
Plan resubmittals requested  5/8/2013 DONE
DetailsJohn Menard
E-mailed the architect requesting structural revisions. JCM
Routing - Erosion and Sediment5/6/2013 5/7/2013 FAIL
DetailsKimberly M. Johnson
1. Define the area of soil distubance. 2. Provide washout detail on map. 3. Locate any inlets located on Vista and Victoria that have the potential to recieve runoff and proscribe adequate BMPs that will not interfere with vehicle or pedestrian traffic. 4. Describe what temporary stabilization measures will be used and when they are required to be implemented. 5. Where will the non-stormwater discharges go (i.e. sprinkler line flushing). The plan describes using a pond to retain water for infiltration; where will this pond be located? Please show on map. 6. Show area on map in northeast where existing vegetation will be protected.
Routing PW Drainage5/2/2013 5/6/2013 FAIL
DetailsBrian Murphy
SOUTH SIDE DRAINAGE
Routing - PUBLIC WORKS5/1/2013 5/6/2013 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy - ###-####
Routing - PLANNING Land Div4/30/2013 5/3/2013 FAIL
DetailsDave Abo
Must complete Record of Survey
Routing PW Sewer Rating5/1/2013 5/2/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste5/2/2013 5/2/2013 PASS
DetailsPeter J. McCullough
Telephone call  5/1/2013 DONE
DetailsChristina Prado
called action couriers for pick up
Routing - Addressing5/1/2013 5/1/2013 FAIL
DetailsJason C. Taylor
Route to addressing
Plans ACCEPTED BY PLAN TECH  4/30/2013 DONE
DetailsChristina Prado
Intake Approval  4/30/2013 PASS
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  4/30/2013 DONE
DetailsChristina Prado
Pending Assignment by JCM4/30/2013 4/30/2013 DONE
DetailsJohn Menard
First Notice 8/17/2014   
Application received 4/30/2013