Permit Information
Permit NumberBLD13-01052
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1055 N CURTIS RD
Project NameST. AL - R.M.C North Tower 2nd
Customer Number 
ePlanReviewNo
Description
(ST. ALPHONSUS - R.M.C North Tower 1st Floor – Tenant Shell Space @ East end) This permit is to renovate an existing ultrasound area by removing all existing equipment and creating a newly defined 1,860 square foot empty space. PLAN MODIFICATION 6-14-2013 – Modification submitted to remove one proposed new restroom and extend break / locker room into that additional area. (Ample restroom fixture count provided within the area. **TLW** This permit will also remodel an existing break and staff room and convert it to a larger conference room and convert an existing lab and needle room to be a new break room / unisex restroom / office. Approval per approved plans on file. Work to include: [construction of interior non-bearing walls to create unisex restroom, an office, a break room, a conference room, an I-2 corridor (smoke partition) and an empty area for a future tenant], installation of new accessible doors and hardware, new plumbing, new electrical, new mechanical, and interior finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/10/201311/15/2013 DONE
DetailsChristina Prado
complete 11-15-13
Print Statement  11/15/2013 DONE
DetailsChristina Prado
First Notice10/25/201310/25/201310/31/2013 DONE
DetailsTom Arcoraci
mailed 11-1-13
BLD-Final10/25/201310/25/201310/25/2013PPASS
DetailsTom Arcoraci
DOC - Permit Finaled10/25/201310/25/201310/25/2013PPASS
DetailsTom Arcoraci
BLD-Final10/24/201310/25/201310/25/2013APASS
DetailsTom Arcoraci
Scott Apple Phone #: ###-#### >> Inspection requested via web by Brad Turk
FIRE-Final Inspection10/24/201310/25/201310/25/2013APASS
DetailsCraig D. Hanson

FIRE-Final Inspection10/24/201310/24/201310/24/2013PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled for tomorrow
BLD-Final10/21/201310/22/201310/22/2013ANR
DetailsTom Arcoraci
has fa issue
BLD-Final10/18/201310/21/201310/22/2013PNR
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Ami Tracy needs fire inspection
BLD-Final10/21/201310/22/201310/21/2013ACANC
DetailsTom Arcoraci
FIRE-Final Inspection10/18/201310/21/201310/21/2013PCANC
DetailsCraig D. Hanson
cancled due to FA problems
FIRE-Final Inspection10/18/201310/21/201310/18/2013ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Ami Tracy Inspection cancelled from web by: Ami Tracy
BLD-Ceiling Grid Inspection10/14/201310/14/201310/14/2013PPASS
DetailsTom Arcoraci
Scott Apple Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Ceiling Grid Inspection10/4/201310/4/201310/4/2013PPASS
DetailsTom Arcoraci
Contact Scott Apple Phone #: ###-#### >> Inspection requested via web by Ami Tracy
BLD-Conference9/18/20139/18/20139/18/2013PPASS
DetailsTom Arcoraci
Scott Apple....###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in9/18/20139/18/20139/18/2013PPASS
DetailsTom Arcoraci
Scott Apple....###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk corridor framing ok
BLD-Other9/16/20139/16/20139/16/2013PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in8/29/20138/29/20138/29/2013PPART
DetailsJim Sly
Please contact Scott Apple. Parking in fenced in area North of Emergency Department. Please call when on site. Phone #: ###-#### >> Inspection requested via web by Scott Apple
Rated horizontal ceiling assembly @ bath 104 and Corridor 103 OK to cover.
BLD-Conference8/26/20138/27/20138/27/2013ADONE
DetailsJim Sly
Contact Scott Apple Phone #: ###-#### >> Inspection requested via web by Ami Tracy
BLD-Conference8/26/20138/27/20138/26/2013PCANC
DetailsTom Arcoraci
Contact Scott Apple Phone #: ###-#### >> Inspection requested via web by Ami Tracy Inspection cancelled from web by: Ami Tracy
FIRE-Final Inspection8/13/20138/14/20138/14/2013APART
DetailsTroy Cobbley
The PET/CT (break room/locker room) area life safety is passed.
BLD-Framing/Rough-in8/8/20138/8/20138/8/2013PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in8/6/20138/7/20138/7/2013APASS
DetailsTom Arcoraci
Call Scott Apple Phone #: ###-#### >> Inspection requested via web by Ami Tracy corr wall ok
BLD-Ceiling Grid Inspection8/1/20138/2/20138/2/2013APASS
DetailsTom Arcoraci
Scott Apple Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in7/9/20137/10/20137/10/2013APART
DetailsTom Arcoraci
Scott Apple ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk locker break room ok
BLD-Framing/Rough-in6/21/20136/24/20136/24/2013APASS
DetailsTom Arcoraci
Please contact Scott Apple @ ###-#### for 7:00am or as early as possible Monday morning. Phone #: ###-#### >> Inspection requested via web by Brad Turk corridor wall ok
(F) Reprint permit  6/21/2013 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  6/21/2013 DONE
DetailsChristina Prado
OVERRIDE  6/14/2013  
Plan assigned to (TLW)6/11/2013 6/14/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/11/2013 6/14/2013 PASS
DetailsTim L. Woodard
Case Summary (BLD)  6/14/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  6/14/2013 DONE
DetailsTisha Gallop
Telephone call  6/14/2013 DONE
DetailsChristina Prado
called Sam to advise Plan modification is ready and gave fees due
FIRE-Conference6/11/20136/11/20136/11/2013PDONE
DetailsTroy Cobbley
Brad and I did a walk through of Phase 2A of the ED Expansion. I deferred him to the fire dept to approve a revised exiting plan if it deviates from the previously approved plan.
Plan Modification Accepted  6/11/2013 DONE
DetailsChristina Prado
Plan modification accepted for removal of toilet room near break room as well as modify existing break room to add lockers, cabinets, mail sorting & cubbies. Plan sheets affected are 0.0, A0.1, A2.0, A6.0, A7.0, M1.0, E2.0D, E2.0FL, E2.0PS; Taken to Tim Woodard for review
BLD-Conference6/4/20136/5/20136/5/2013APASS
DetailsTom Arcoraci
We would like to schedule this for 11:00 am. Please contact Jim Martin @ ###-#### if this time does not work. Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
Issue PAID IN FULL permit  5/24/2013 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  5/15/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/15/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  5/15/2013 DONE
DetailsTisha Gallop
Telephone call  5/15/2013 DONE
DetailsChristina Prado
Called Sam to advise permit tyo issue pending GC and payment
Permit Ready to Issue  5/15/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)  5/15/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/2/2013 5/14/2013 PASS
DetailsTim L. Woodard
1st review completed  5/14/2013 DONE
DetailsTim L. Woodard
Routing - Addressing4/30/2013 5/1/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS5/1/2013 5/1/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating5/1/2013 5/1/2013 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  4/30/2013 DONE
DetailsChristina Prado
Intake Approval  4/30/2013 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  4/30/2013 DONE
DetailsChristina Prado
Application received 4/30/2013