BLD-Final | 10/15/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Tony Young
|
|
|
Key is located in the key box on the right side of house toward back corner -- code is 98345. Thx :) Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Blower Door Test Results | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | PASS |
Tony Young
|
|
|
4.67
|
BLD-Final | 10/14/2013 | 10/15/2013 | 10/15/2013 | P | FAIL |
Tony Young
|
|
|
Key for front door is in the key box located on the right side of house near back corner. Code for box is 98345. Thanks Phone #: ###-#### >> Inspection requested via web by Kim Winkle.. c/n,, gave to worker,, need glass above tub tempered.. need elec final pass on garage
|
BLD-Wall Bracing | 9/18/2013 | 9/19/2013 | 9/20/2013 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian FRAMING OK TOO.
|
BLD-Foundation | 8/2/2013 | 8/5/2013 | 8/5/2013 | A | PART |
Tony Young
|
|
|
kevin Phone #: ###-####,, porch ftgsand foundations for detached garage
|
BLD-Energy code compliance | 8/1/2013 | 8/2/2013 | 8/2/2013 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
BLD-Footing | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PART |
Tony Young
|
|
|
kevin Phone #: ###-####,, garage and front porch supports
|
BLD-Framing/Rough-in | 7/30/2013 | 7/31/2013 | 7/31/2013 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle,, ok to insulate
|
BLD-Framing/Rough-in | 7/30/2013 | 7/30/2013 | 7/30/2013 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle,, correction posted
|
BLD-Wall Bracing | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
BLD-Wall Bracing | 7/24/2013 | 7/25/2013 | 7/25/2013 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle,, need to nail or staple all panels listed on plan,, including block lines
|
Plan resubmittals received | | | 7/22/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 7/22/2013 | | 7/22/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 6/17/2013 | 6/18/2013 | 6/19/2013 | P | PART |
Tony Young
|
|
|
Around 3:30pm please-Kevin Phone #: ###-#### basement walls,, work in progress
|
BLD-Footing | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Tom Arcoraci
|
|
|
Kevin-Closer to 12:00 please Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/30/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | | 5/3/2013 | 5/28/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed/ sustantial changes need to be made for HD approval. Have not plan reviewed/Due 5/22 Hillside
|
Routing - PLAN CHECK | 5/28/2013 | | 5/28/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Had Matt sign both the site plan for the garage and the house. The garage plans were attached to the back of the house plan set.
|
Case Summary (BLD) | | | 5/28/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 5/28/2013 | | |
|
|
|
|
Telephone call | | | 5/28/2013 | | DONE |
|
|
|
5-28-13 called Steve left message permit ready and fee given ///dld
|
Routing - PLAN CHECK | 5/24/2013 | | 5/24/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent 5/24/13
Steve,
I have completed the plan review for BLD13-01079, 1506 N 23rd Street.
The application and site plan indicate a garage will be constructed but there are no building plans for it. Will you be submitting for that at a later date?
The garage wall will need to be engineered or meet the prescriptive design from chapter 4 of the IRC. Please revise the detail and include the table you are using for the design.
If you have any questions please feel free to contact me.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Plan resubmittals received | | | 5/24/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
recieved revised basement wall detail
|
Routing - PLANNING | 5/20/2013 | | 5/22/2013 | | PASS |
Matthew A Halitsky
|
|
|
|
Plan resubmittals received | | | 5/20/2013 | | DONE |
Tisha Gallop
|
|
|
received two copes of plan sheets 1, 2, 3, 4, 5, 6, 7, 8; taken to Adele.
|
1st review completed | | | 5/13/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
called Steve 5/13/13
|
Routing - PLAN CHECK | 5/13/2013 | | 5/13/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Steve 5/13/13 home and site has several changes to be made due to HD approval. Will wait for revised approved plans from planning before starting building review.
|
Routing - MECHANICAL | 5/10/2013 | | 5/13/2013 | | PASS |
Troy James
|
|
|
manual j report is 248 square feet more than submitted plans.
|
Routing - PLANNING | 5/7/2013 | | 5/10/2013 | | FAIL |
Matthew A Halitsky
|
|
|
Routed to Matt H. per DRH13-00051
Plans do not match those approved by HPC. Notified David Benoit 5-10-2013.
|
Routing - PUBLIC WORKS | 5/6/2013 | | 5/7/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 5/3/2013 | 5/8/2013 | 5/6/2013 | | PASS |
Cindy M. Gould
|
|
|
Credit for demo of single family house
|
Routing - Addressing | 5/3/2013 | | 5/6/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/3/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/2/2013 | | FAIL |
Christina Prado
|
|
|
Needs stair detailed section
|
Application received | | 5/2/2013 | | | |
|
|
|
|