Permanent Occupancy | | | 12/10/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PASS |
Jim Storey
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PART |
Jim Storey
|
|
|
Brad Phone #: ###-#### fire ok no sig.
|
FIRE-Final Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/5/2013 | 11/7/2013 | 11/7/2013 | P | PART |
Forrest France
|
|
|
Final pending fire sprinkler system modifications due to rack storage array.
|
FIRE-Final Inspection | 5/23/2013 | 5/23/2013 | 5/23/2013 | A | PART |
Forrest France
|
|
|
Final pending defined exit path per plan review annotations, racking permit.
|
FIRE-Final Inspection | 5/8/2013 | 5/15/2013 | 5/15/2013 | P | FAIL |
Forrest France
|
|
|
Refer to permit documents general requirements page items number 8 and 9 for items needed prior to final. Repair one EM light above the preaction fire alarm panel.
|
Plan assigned to (TLW) | 5/3/2013 | | 5/8/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/3/2013 | | 5/8/2013 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 5/8/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/8/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/8/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2013 | | |
|
|
|
|
Telephone call | | | 5/8/2013 | | |
|
|
|
5-8-13 called Bradley Allred permit ready for pick up ///dld
|
Issue PAID IN FULL permit | | | 5/8/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/3/2013 | 5/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 12/20/2013 | | | |
|
|
|
|