First Notice | | 9/26/2013 | 10/4/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/16/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Dave Hannah
|
|
|
jack Phone #: ###-####
|
Temporary Occupancy | 8/20/2013 | 11/18/2013 | 8/20/2013 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 8/9/2013 | 8/12/2013 | 8/12/2013 | P | PART |
Dave Hannah
|
|
|
call 30 min before // Jack Phone #: ###-#### ok for temp occ ok for perm occ after mec gos perm
|
FIRE-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Sprinkler Rough-in | 6/24/2013 | 6/24/2013 | 6/24/2013 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler modifications at the grid ceilings.
|
BLD-Framing/Rough-in | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PART |
Dave Hannah
|
|
|
Ceiling grid Please contact John if you have questions Phone #: ###-#### ok to cover
|
FIRE-Conference | 6/12/2013 | 6/12/2013 | 6/12/2013 | A | DONE |
Forrest France
|
|
|
Regarding hood suppression work and fire life safety inspection items.
|
Plan assigned to (AJS) | 5/8/2013 | 5/8/2013 | 5/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed/Due 5/17 Level 2 TI
|
Routing - PLAN CHECK | 5/22/2013 | | 5/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 5/22/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 5/22/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/22/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/20/2013 | | DONE |
Tisha Gallop
|
|
|
received response from Architect, response from Engineer, Plumbing Fixture Requirements, and two copies of plan sheet A1.0; taken to Adele
|
1st review completed | | | 5/13/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed plan review comments to John at TAO 5/13/13
|
Routing - PLAN CHECK | 5/8/2013 | | 5/13/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see plan review comments in documents
|
Routing - PUBLIC WORKS | 5/7/2013 | | 5/8/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan assigned to (TLW) | 5/8/2013 | | 5/8/2013 | | DEFR |
Tim L. Woodard
|
|
|
assigned ot Adele
|
Routing PW Sewer Rating | 5/7/2013 | | 5/8/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/7/2013 | | 5/7/2013 | | PASS |
Walt Baumgartner
|
|
|
existing big dipper noted on plans for existing triple sink
|
Routing - Addressing | 5/6/2013 | | 5/7/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/6/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/6/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/6/2013 | | | |
|
|
|
|