Permit Information
Permit NumberBLD13-01133
StatusFinaled
Name JH DEVELOPMENT INC
Site Address 2920 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 3448 sq. ft., two story ( basement 1553 sq. ft.), (first floor 1895 sq. ft.) single family dwelling with 5 bedrooms, and (2) ½ baths, approximately 399 sq. ft. of covered patio/porch and a 908 sq. ft. attached garage per the approved plans, res check, brandguard vent specification, guardrail detial, engineering, revised engineering, plan review report and any notations. R- 1A/DA zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  3/4/2015 DONE
Letter of compliance/Occupancy  3/4/2015 DONE
BLD-Final8/14/20148/14/20148/14/2014PPASS
DetailsPhil Shearer
Eric Phone #: ###-####
DOC - Permit Finaled8/14/20148/14/20148/14/2014PPASS
DetailsPhil Shearer
BLD-Final6/25/20146/25/20146/25/2014PFAIL
DetailsDave Hannah
Eric Phone #: ###-#### c/n on site
PubWorks Occupancy Approval5/30/20145/30/20145/30/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance10/4/201310/7/201310/7/2013APASS
DetailsDave Hannah
eric Phone #: ###-####
BLD-Framing/Rough-in10/2/201310/2/201310/2/2013PPART
DetailsJim Storey
eric Phone #: ###-#### sheer ok/ truss bracing as noted/ nail cluster on 3 ply/ floor joist cut topchord by plm water closet. ok to insulate// soffit nr.
Plan resubmittals received  9/27/2013 DONE
new manual j
Routing - MECHANICAL9/27/2013 9/27/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Foundation7/25/20137/26/20137/26/2013APASS
DetailsDave Hannah
ben Phone #: ###-####
BLD-Footing7/16/20137/16/20137/16/2013PPART
DetailsJim Sly
ben Phone #: ###-####
Footing at North East corner area (at over dig) OK.
BLD-Footing7/15/20137/16/20137/16/2013ACANC
DetailsJim Sly
request inspection after 10 am Phone #: ###-#### >> Inspection requested via web by Ben Sears
RE-sched for PM.
PubWorks Subgrade Approval7/15/20137/15/20137/15/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval (MTI) for eastern footings where over-excavation has occured. Builidng department may be scheduled for footing inspections. Jason Taylor ###-####.
BLD-Footing7/5/20137/5/20137/8/2013PPART
DetailsDave Hannah
BEN Phone #: ###-#### ok to pour ext wall ftgs
PubWorks Subgrade Approval7/5/20137/5/20137/5/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer for entire building perimeter footprint. Building offical may be scheduled for footing inspections. Jason Taylor ###-####.
Issue PAID IN FULL permit  6/11/2013 DONE
DetailsChristina Prado
OVERRIDE  6/10/2013  
Plan assigned to (AJS)5/21/20135/21/20136/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Hillside Due 6/5
Routing - PLAN CHECK6/10/2013 6/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  6/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
Inspection Record Card- Bld  6/10/2013 DONE
Telephone call  6/10/2013 DONE
DetailsChristina Prado
called Jeff to advise permit is ready and gave fees due
Permit Ready to Issue  6/10/2013 DONE
DetailsChristina Prado
Plan resubmittals received  6/6/2013 DONE
DetailsAdele J Schaffeld-Griffin
RECIEVED REVISIONS VIA E MAIL
1st review completed  6/4/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see comments in documents
Routing - PLAN CHECK5/28/2013 6/4/2013 FAIL
DetailsAdele J Schaffeld-Griffin
emailed plan review comments
Routing - PLANNING5/28/2013 5/29/2013 PASS
DetailsDavid Moser
Approved as redlined; eaves shall not encrouch more than 2 feet into side and rear setback. See attached letter with site plan from ACHD allowing window well to encrouch into ACHD slope easment.
Routing - FIRE5/24/2013 5/28/2013 PASS
DetailsScott Arellano
No comments attached. This home meets the Fire Department vehicle access requirements per IFC 503.1.1. The mandatory fire sprinkler requirement for all homes in this subdivision has been vacated from the original plat note with the opening of Fire Station #15.
Routing - Erosion and Sediment5/23/2013 5/24/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL5/22/2013 5/23/2013 PASS
DetailsTroy James
Routing - PUBLIC WORKS5/21/2013 5/22/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING5/22/2013 5/22/2013 FAIL
DetailsDavid Moser
need a letter from ACHD for window well in ACHD slope easment. need to redline eaves so they do not extend more than 2 feet into setbacks.
Route to Impact Fee Review5/21/20135/24/20135/21/2013 PASS
DetailsCindy M. Gould
Routing - Addressing5/21/2013 5/21/2013 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside5/21/2013 5/21/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Intake Approval  5/20/2013 PASS
5-20-13
Intake Approval  5/8/2013 FAIL
DetailsChristina Prado
Needs CFh approval (10day appeal up on May 18th) as well as garage/dwelling seperation
Application received 5/8/2013