Letter of compliance/Occupancy | | | 3/4/2015 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 3/4/2015 | | DONE |
|
|
|
|
BLD-Final | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | FAIL |
Dave Hannah
|
|
|
Eric Phone #: ###-#### c/n on site
|
PubWorks Occupancy Approval | 5/30/2014 | 5/30/2014 | 5/30/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 10/4/2013 | 10/7/2013 | 10/7/2013 | A | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PART |
Jim Storey
|
|
|
eric Phone #: ###-#### sheer ok/ truss bracing as noted/ nail cluster on 3 ply/ floor joist cut topchord by plm water closet. ok to insulate// soffit nr.
|
Plan resubmittals received | | | 9/27/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 9/27/2013 | | 9/27/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-####
|
BLD-Footing | 7/16/2013 | 7/16/2013 | 7/16/2013 | P | PART |
Jim Sly
|
|
|
ben Phone #: ###-#### Footing at North East corner area (at over dig) OK.
|
BLD-Footing | 7/15/2013 | 7/16/2013 | 7/16/2013 | A | CANC |
Jim Sly
|
|
|
request inspection after 10 am Phone #: ###-#### >> Inspection requested via web by Ben Sears RE-sched for PM.
|
PubWorks Subgrade Approval | 7/15/2013 | 7/15/2013 | 7/15/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval (MTI) for eastern footings where over-excavation has occured. Builidng department may be scheduled for footing inspections. Jason Taylor ###-####.
|
BLD-Footing | 7/5/2013 | 7/5/2013 | 7/8/2013 | P | PART |
Dave Hannah
|
|
|
BEN Phone #: ###-#### ok to pour ext wall ftgs
|
PubWorks Subgrade Approval | 7/5/2013 | 7/5/2013 | 7/5/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer for entire building perimeter footprint. Building offical may be scheduled for footing inspections. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/11/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/10/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 5/21/2013 | 5/21/2013 | 6/10/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Hillside Due 6/5
|
Routing - PLAN CHECK | 6/10/2013 | | 6/10/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 6/10/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2013 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2013 | | DONE |
Christina Prado
|
|
|
called Jeff to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 6/10/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 6/6/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
RECIEVED REVISIONS VIA E MAIL
|
1st review completed | | | 6/4/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see comments in documents
|
Routing - PLAN CHECK | 5/28/2013 | | 6/4/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed plan review comments
|
Routing - PLANNING | 5/28/2013 | | 5/29/2013 | | PASS |
David Moser
|
|
|
Approved as redlined; eaves shall not encrouch more than 2 feet into side and rear setback. See attached letter with site plan from ACHD allowing window well to encrouch into ACHD slope easment.
|
Routing - FIRE | 5/24/2013 | | 5/28/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached. This home meets the Fire Department vehicle access requirements per IFC 503.1.1. The mandatory fire sprinkler requirement for all homes in this subdivision has been vacated from the original plat note with the opening of Fire Station #15.
|
Routing - Erosion and Sediment | 5/23/2013 | | 5/24/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 5/22/2013 | | 5/23/2013 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 5/21/2013 | | 5/22/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 5/22/2013 | | 5/22/2013 | | FAIL |
David Moser
|
|
|
need a letter from ACHD for window well in ACHD slope easment. need to redline eaves so they do not extend more than 2 feet into setbacks.
|
Route to Impact Fee Review | 5/21/2013 | 5/24/2013 | 5/21/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 5/21/2013 | | 5/21/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 5/21/2013 | | 5/21/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Intake Approval | | | 5/20/2013 | | PASS |
|
|
|
5-20-13
|
Intake Approval | | | 5/8/2013 | | FAIL |
Christina Prado
|
|
|
Needs CFh approval (10day appeal up on May 18th) as well as garage/dwelling seperation
|
Application received | | 5/8/2013 | | | |
|
|
|
|