Permit Information
Permit NumberBLD13-01137
StatusFinaled
Name WESTERN IDAHO BUILDERS
Site Address 4190 W NEZ PERCE ST
Project NameJACKSONS STORE 46
Customer Number 
ePlanReviewYes
Description
(JACKSON'S STORE 46 - REMODEL AND ADDITION) (MODIFICATION TO CONSTRUCT A NEW SIGN PARAPET ABOVE THE WEST EXTERIOR WALL, EXTEND THE HEIGHT OF THE OTHER WEST PARAPETS, INSTALL NEW AWNINGS AT THE WEST EXTERIOR WALL, RELOCATE THE VENTS SERVING THE FUEL STATIONS, CONSTRUCT A NEW FENCE AND GATE, AND MODIFY THE LANDSCAPING. THE DESIGN AND ATTACHMENT OF THE NEW AWNINGS ARE DEFERRED SUBMITTAL ITEMS.) This building does not have a fire sprinkler system. To remodel an existing convenience store and to construct a 389 square foot addition. After the addition, this building will have a total floor area of about 2,968 square feet (307 sq. ft. canopy, 389 sq. ft. addition, 2,272 sq. ft. existing building). For the addition, work is to include masonry exterior walls, wood joists, wood sheathing, insulation installed on top of the roof deck, an opaque exterior door, and a single ply roofing membrane. Other work includes a restroom accessible to the disabled, interior nonbearing walls, a new doorway in an existing masonry wall, new storefront glazing, a new double leaf entrance door, new wood columns, walk-in coolers, a walk-in freezer, new exterior finishes (plaster, rock veneer, etc.), new sign awnings, connections between the existing West and the East exterior walls and the existing roof diaphragm, millwork, and finishes. Special inspection is required for soils, masonry, concrete, welding, and epoxy anchors. The existing West canopy will be removed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The design and attachment of the new sign awnings is a deferred submittal item. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/10/20152/2/2015 DONE
Second Notice 12/13/20141/5/2015 DONE
DetailsCandy A. Nichols
sent in mail 1/5/15
First Notice 11/22/201412/3/2014 DONE
sent 1st notice in mail 12-3-14 pdf
Permanent Occupancy  11/12/2014 DONE
DetailsChristina Prado
Zoning Approval11/10/201411/10/201411/10/2014 DONE
DetailsAndrea Tuning
BLD-Final11/6/201411/7/201411/7/2014PPASS
DetailsPhil Shearer
Kenny Phone #: ###-####
FIRE-Final Inspection11/6/201411/6/201411/6/2014PPASS
DetailsForrest France
Life safety inspection passed. Need to re-post emergency fuel shutoff sign prior to final.
BLD-Ceiling Grid Inspection10/30/201410/31/201410/31/2014PPASS
DetailsPhil Shearer
Brad Phone #: ###-####
BLD-Framing/Rough-in10/21/201410/22/201410/22/2014PPASS
DetailsPhil Shearer
Brad Phone #: ###-####
BLD-Framing/Rough-in10/15/201410/16/201410/16/2014APASS
DetailsPhil Shearer
brad Phone #: ###-####
BLD-Wall Bracing10/10/201410/13/201410/13/2014PPASS
DetailsPhil Shearer
roof - brad Phone #: ###-####. Roof straping and wall bracing
BLD-Other10/8/201410/9/201410/9/2014PPASS
DetailsPhil Shearer
masonry grout // Chuck Phone #: ###-####
BLD-Footing10/2/201410/3/201410/3/2014PPASS
DetailsPhil Shearer
Requests 3pm/concrete at 3:30 - Brad Phone #: ###-####
BLD-Wall Bracing10/3/201410/3/201410/3/2014PPART
DetailsPhil Shearer
West and south facing awning walls only.
BLD-Framing/Rough-in10/1/201410/2/201410/2/2014APASS
DetailsPhil Shearer
Brad Phone #: ###-####.
BLD-Footing9/30/201410/1/201410/1/2014PPASS
DetailsPhil Shearer
Kenney// please try for around 3:30 Phone #: ###-####
OVERRIDE  9/25/2014  
Issue PAID IN FULL permit  9/25/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  9/25/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  9/25/2014 DONE
DetailsCandy A. Nichols
Extend Review Timeline  5/5/2014 DONE
DetailsChristina Prado
Expiration Notice4/15/20145/6/20144/15/2014 DONE
DetailsChristina Prado
Extend Review Timeline  10/25/2013 DONE
DetailsChristina Prado
Expiration Notice10/15/201311/5/201310/15/2013 DONE
DetailsChristina Prado
Plan assigned to (CJW)9/19/20139/19/201310/7/2013 PASS
DetailsCarl Westfall
JACKSON'S FOOD STORE - PLAN MOD
PLANS/APPL TAKEN TO FRONT DESK  10/7/2013 DONE
Routing - PLAN CHECK10/3/2013 10/4/2013 DONE
DetailsCarl Westfall
started routing
Routing - FIRE10/4/2013 10/4/2013 PASS
DetailsCraig D. Hanson
Plans indicate that vents shall be relocated
Plan resubmittals requested  10/3/2013 DONE
Fire did not approve the plan mod.
Plan resubmittals received  10/3/2013 DONE
Routing - FIRE9/30/2013 10/2/2013 FAIL
DetailsScott Arellano
Correction items placed on e-plans. Plan review report emailed to architect.
Routing Off Site - C.D.H9/30/2013 10/2/2013 PASS
DetailsTidemark Corp
addition to food options
Routing - PLUMBING9/30/2013 10/1/2013 PASS
DetailsDaryl Spivey
changes to DWV
Per plan and ISPC.
Routing - Design Review9/30/2013 9/30/2013 PASS
DetailsAndrea Tuning
Routing - PUBLIC WORKS9/30/2013 9/30/2013 PASS
DetailsBeverly Mountain
changes to drainage
Routing PW Drainage9/30/2013 9/30/2013 PASS
DetailsBrian Murphy
Routing - PLAN CHECK9/27/2013 9/30/2013 PASS
DetailsCarl Westfall
Drawings uploaded on September 27, 2013. Plan mod approved September 30, 2013.
Plan resubmittals received  9/19/2013 DONE
Started "plan mod" workflow for resubmittals - permit has not been issued
Plan assigned to (CJW)5/22/20135/22/20137/10/2013 PASS
DetailsCarl Westfall
JACKSONS STORE 46 - REMODEL AND ADDITION (20 days - June 18) ePlanReview
Routing - PLAN CHECK7/9/2013 7/10/2013 DONE
DetailsCarl Westfall
2nd routing complete
PLANS/APPL TAKEN TO FRONT DESK  7/10/2013 DONE
Routing - PLUMBING7/2/2013 7/9/2013 PASS
DetailsBill VanDegrift
Revised plumbing plans submitted per resubmitted plans and ISPC
Routing PW Solid Waste7/2/2013 7/8/2013 PASS
DetailsPeter J. McCullough
Routing - PLAN CHECK6/28/2013 7/2/2013 PASS
DetailsCarl Westfall
Drawings approved with "red lines" after the 2nd review.
Plan resubmittals received  6/28/2013 DONE
Plan resubmittals requested  6/18/2013 DONE
1st review completed  6/18/2013 DONE
Routing - PLAN CHECK5/22/2013 6/18/2013 FAIL
DetailsCarl Westfall
The IBC plan review was started on June 11 and was finished on June 18. Revised drawings were required. See the plan review report and the changemarks on the drawings.
Route to Impact Fee Review5/22/20135/28/20136/3/2013 PASS
DetailsCindy M. Gould
Routing - FIRE5/22/2013 5/31/2013 PASS
DetailsScott Arellano
Attached comments to plans.
Routing Off Site - C.D.H5/22/2013 5/29/2013 PASS
DetailsTidemark Corp
Routing PW Drainage5/22/2013 5/29/2013 PASS
DetailsBrian Murphy
Routing PW Solid Waste5/22/2013 5/28/2013 FAIL
DetailsPeter J. McCullough
Routing - PLUMBING5/22/2013 5/28/2013 PASS
DetailsBill VanDegrift
1)mount r.p.-1 over mop sink or install DCVA
2) provide united water required r.p. upstream of filter system.
3) there are no public use bath groups in appendix L note on water sizinf page P2.2
Routing - Design Review5/22/2013 5/23/2013 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH13-00006
Routing PW Sewer Rating5/22/2013 5/22/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing5/22/2013 5/22/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS5/22/2013 5/22/2013 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment5/22/2013 5/22/2013 PASS
DetailsKimberly M. Johnson
waiver approved
Intake Approval  5/22/2013 PASS
DetailsJason Blais
Prescreen passed on 5/10/13 by Sam Zahorka. Plan Review Fees paid on 5/22/13.
Pending Assignment by JCB5/22/2013 5/22/2013 DONE
DetailsJason Blais
Application received  5/8/2013 DONE
Application submitted via PDS Online on May 8 2013 3:30PM