BLD-Final | 12/30/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Tony Young
|
|
|
kent Phone #: ###-####
|
DOC - Permit Finaled | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 12/26/2013 | 12/30/2013 | 12/30/2013 | A | PEND |
Tony Young
|
|
|
kent Phone #: ###-####,,ok,, just need address #s
|
BLD-Final | 12/24/2013 | 12/26/2013 | 12/26/2013 | A | PEND |
Tony Young
|
|
|
kent Phone #: ###-####
|
BLD-Final | 12/23/2013 | 12/24/2013 | 12/24/2013 | A | PEND |
Tony Young
|
|
|
kent Phone #: ###-####
|
BLD-Final | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PEND |
Tony Young
|
|
|
kent Phone #: ###-####,, all ok now,, except need house #s
|
BLD-Final | 12/20/2013 | 12/23/2013 | 12/23/2013 | A | PART |
Tony Young
|
|
|
kent Phone #: ###-####,, need house #s,, hill side ok
|
BLD-Final | 12/19/2013 | 12/20/2013 | 12/20/2013 | P | PEND |
Tony Young
|
|
|
kent Phone #: ###-####,, may need hillside,, all else ok
|
BLD-Conference | 10/22/2013 | 10/23/2013 | 10/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
kent Phone #: ###-####
|
BLD-Conference | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | DEFR |
Tom Arcoraci
|
|
|
kent Phone #: ###-#### unable to respond defr to next day
|
BLD-Framing/Rough-in | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | PASS |
Tom Arcoraci
|
|
|
Exterior deck - Kent Phone #: ###-####
|
Telephone call | | | 9/5/2013 | | DONE |
|
|
|
spoke with roofer and AGREED that the roof covering is covered under the original valuation of the permit. 9-5-2013 pep 11:14 a.m.
|
BLD-Framing/Rough-in | 8/26/2013 | 8/26/2013 | 8/26/2013 | P | PART |
Tony Young
|
|
|
KENT Phone #: ###-####,, need to verify seal pack,, strap diaphram,, f/blocks
|
BLD-Footing | 6/19/2013 | 6/20/2013 | 6/20/2013 | A | PASS |
Tony Young
|
|
|
kent Phone #: ###-####
|
BLD-Footing | 6/18/2013 | 6/19/2013 | 6/19/2013 | P | PART |
Tony Young
|
|
|
kent Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 6/14/2013 | 6/14/2013 | 6/14/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval for building footings, column pads, and misc footings for entrance and window wells. Building deparetment may be scheduled for footings inspections. Jason Talyor ###-####.
|
Issue PAID IN FULL permit | | | 5/28/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/24/2013 | | |
|
|
|
|
Telephone call | | | 5/24/2013 | | |
|
|
|
5-24-13 called Merlin left message permit ready and fee given ///dld
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2013 | | |
|
|
|
|
Routing - MECHANICAL | 5/22/2013 | | 5/22/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/17/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised ESC plans marked 1 of 1 as well as two revised ESC Narratives;Plans taken to Perry for routing
|
Routing - Erosion and Sediment | 5/17/2013 | | 5/17/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Plan assigned to (PEP) | 5/9/2013 | 5/9/2013 | 5/10/2013 | | FAIL |
Perry Paine
|
|
|
need ESC and ACCA approvals
|
Routing Walk-In (BLD) | 5/9/2013 | 5/9/2013 | 5/10/2013 | A | FAIL |
Perry Paine
|
|
|
need ESC and ACCA
|
Routing - MECHANICAL | 5/9/2013 | | 5/10/2013 | | FAIL |
Troy James
|
|
|
For Man. J & D 5/9/2013 11:35 a.m.
emailed correction to Heating Supply
|
Routing - Erosion and Sediment | 5/9/2013 | | 5/10/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
1. Please provide a complete list of potential pollutants that are expected to be present during the various phases of construction. This list should then be used to determine what BMPs are required. Please make sure to include the stucco work and sediment as pollutants. It is very common to find violations during construction related to exterior stucco washouts. It is important that the contractor and homeowner is aware of this and knows how to prevent this type of violation.
2. Please show the area of disturbance required to gain access with construction equipment to the backside of the property where the new addition and retaining wall is located.
3. Both the access to the back and the material staging area should both be included in the square footage of disturbance for the local City of Boise requirements (see definition of “construction activity” in BCC 8-17).
4. Please include a detail for the concrete washout and show the location on the map. Every structural BMP should have a detail.
5. Please show on the map any storm drains and required BMPs located on Ridgecliff lane that could receive discharges from the project. Include a description for this in the narrative. If there are no storm drains that have the potential, this is obviously is not required.
|
1st review completed | | | 5/10/2013 | | FAIL |
Perry Paine
|
|
|
|
Routing Walk-In (PW Hillside) | 5/9/2013 | 5/9/2013 | 5/9/2013 | A | DONE |
Jason C. Taylor
|
|
|
Project will required a subgrade inspection in all areas before any footing inspections can be scheduled with the building department. The subgrade inspection report shall be submitted to Public Works Hillside Review (Jason Taylor -jtaylor@cityofboise.org, ###-####).
|
Routing Walk-In (Zoning) | 5/9/2013 | 5/9/2013 | 5/9/2013 | A | PASS |
Leon Letson
|
|
|
|
Application received | | 5/9/2013 | | | |
|
|
|
|