DOC - Permit Expired | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Jim Storey
|
|
|
exp
|
(F) Reprint permit | | | 10/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 10/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Expiration Notice | 10/15/2013 | 11/5/2013 | 10/15/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | | 5/9/2013 | 5/16/2013 | | PASS |
Carl D Madsen
|
|
|
First review completed 5-15-13 CDM
|
Routing - PLAN CHECK | 5/16/2013 | | 5/16/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/16/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/16/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/16/2013 | | DONE |
Tisha Gallop
|
|
|
e-mailed Jared White permit is ready, fee due, need GC form.
|
Routing - PLAN CHECK | 5/10/2013 | | 5/15/2013 | | FAIL |
Carl D Madsen
|
|
|
Clarification is required on weather the battery cabinet and MMBS cabinet is at grade level or on the roof. Called and left a message with Jared at sprint as well as the engineer. 5-15-13 CDM
|
1st review completed | | | 5/15/2013 | | FAIL |
|
|
|
Clarification is required on weather the battery cabinet and MMBS cabinet is at grade level or on the roof. Called and left a message with Jared at sprint as well as the engineer. 5-15-13 CDM
|
Routing - PLANNING | 5/9/2013 | | 5/10/2013 | | PASS |
Todd Tucker
|
|
|
CAA13-00028
|
Intake Approval | | | 5/9/2013 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/9/2013 | | | |
|
|
|
|