Case Summary (BLD) | | | 2/25/2014 | | |
|
|
|
|
BLD-Final | 11/7/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Tony Young
|
|
|
ron Phone #: ###-####
|
DOC - Permit Finaled | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/6/2013 | 11/7/2013 | 11/8/2013 | P | PART |
Tony Young
|
|
|
ron Phone #: ###-####,, need temp glass verification in bathroom and by door.. seal exterior
|
BLD-Final | 11/8/2013 | 11/8/2013 | 11/8/2013 | A | DONE |
Perry Paine
|
|
|
On 11-7-2013, I went on an inspection with inspector Tony Young. We did a final walkthrough for permit number BLD13-01155 for the new single family dwelling, constructed using Strawbale infill walls. I spoke with the builder and I am hoping to get some quality pictures of how it turned out. The building inspector has very good rapport with the builder which has allowed the project to continue without a hitch.
It is a good feeling to be in the field with inspectors that have the same mission for the Building Department and it’s customers.
|
BLD-Energy code compliance | 8/29/2013 | 8/30/2013 | 8/30/2013 | P | PASS |
Tony Young
|
|
|
RON Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | PART |
Tony Young
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PART |
Tony Young
|
|
|
ron Phone #: ###-####.. ok to insulate the walls,, need the fireplace inspected,, need truss engineering,, need joist blocking..
|
BLD-Conference | 7/17/2013 | 7/17/2013 | 7/17/2013 | A | DONE |
Perry Paine
|
|
|
With Tony Young. Inspection Ride Along walked through the project with Mr. Hixon, water seal complete for the foundation at the sill plates and wiring signed off that will be covered by the bales this weekend. approx-1-hour on site.
|
BLD-Foundation | 6/18/2013 | 6/19/2013 | 6/25/2013 | A | DONE |
Tony Young
|
|
|
slab - Marc(Ron) Phone #: ###-####
|
BLD-Concrete | 6/19/2013 | 6/20/2013 | 6/21/2013 | A | PASS |
Tony Young
|
|
|
slab - Marc(Ron) Phone #: ###-####
|
BLD-Footing | 6/4/2013 | 6/5/2013 | 6/6/2013 | P | PART |
Tony Young
|
|
|
Phone #: ###-####,, point load footings on straw bale house,, rebar ok
|
Plan assigned to (PEP) | 5/14/2013 | 5/14/2013 | 5/28/2013 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 5/14/2013 | 5/14/2013 | 5/28/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | | 5/10/2013 | 5/28/2013 | | PASS |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | 5/14/2013 | | 5/28/2013 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 5/28/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/28/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/28/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/28/2013 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/13/2013 | | 5/14/2013 | | PASS |
Troy James
|
|
|
ductless system for heat, no manual j
|
Routing - PLANNING | 5/13/2013 | | 5/13/2013 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 5/10/2013 | | 5/13/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 5/10/2013 | 5/15/2013 | 5/10/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/10/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/10/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/10/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 5/10/2013 | | 5/10/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 5/10/2013 | | | |
|
|
|
|