First Notice | | 1/18/2015 | 1/8/2015 | | DONE |
|
|
|
This permit finaled on the web by Jody Wilson
|
BLD-Final | 1/6/2015 | 1/7/2015 | 1/7/2015 | A | PASS |
Phil Shearer
|
|
|
Herb Phone #: ###-####
|
Zoning Approval | 12/15/2014 | 12/15/2014 | 12/15/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PART |
Phil Shearer
|
|
|
Herb Phone #: ###-#### OK for TCO
|
PubWorks Occupancy Approval | 12/12/2014 | 12/12/2014 | 12/12/2014 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 10/31/2014 | 11/3/2014 | 11/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide "no parking fire lane" signage as discussed.
|
BLD - Request for Extension | 7/17/2014 | 8/15/2014 | 8/15/2014 | | PASS |
Phil Shearer
|
|
|
Jody ###-#### // possibly will start work beginning of September. WIP
|
OVERRIDE | | | 8/22/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/22/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/22/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Design Review | 8/19/2013 | | 8/19/2013 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 8/19/2013 | | 8/19/2013 | | PASS |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 8/16/2013 | | |
|
|
|
|
Routing - FIRE | 6/13/2013 | | 6/13/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Street Lights | 5/21/2013 | | 6/7/2013 | | PASS |
Mike D Hedge
|
|
|
No lights required
|
Routing PW Drainage | 5/21/2013 | | 6/7/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | | | 5/23/2013 | | FAIL |
Andrea Tuning
|
|
|
The applicant had a number of Conditions of Approval attached to DRH13-00088. The applicant has not met the following conditions.
Provide a detailed landscape plan that has been prepared by an architect, landscape architect, landscape designer working as a professional in this field or a qualified nurseryman. The landscape plan shall provide a high quality landscape plan that provides year round color and design interest and is appropriate along Interstate I-84 (a gateway street).
Install a total of 19 Class II or Class III street trees along Interstate I-84. These street trees may be spaced equitably along the street frontage or clustered.
Install 3 Class II or Class III street trees along Phillippi Street. These street trees may be spaced equitably along the street frontage or clustered.
Provide lawn, planter beds that utilize an organic bark mulch or another approved vegetative groundcover on all sides of the proposed berm.
Remove the four parking spaces located along the west property line of 2713 South Hilton Street from the site or provide 8-foot wide (measured inside of curb to inside of curb) terminus planter islands that contain a Class II tree and appropriate low growing shrubs.
Stripe and sign the southernmost drive aisle to be one-way traffic or provide the required 20-feet required for two-way traffic circulation.
Provide the Design Review staff with cut sheets regarding the on-site lighting that will be provided. All lighting will be required to be downward facing.
|
Routing - Erosion and Sediment | 5/21/2013 | | 5/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLANNING Land Div | 5/21/2013 | | 5/21/2013 | | PASS |
Dave Abo
|
|
|
Parcel A of ROS 9115.
|
Routing - PUBLIC WORKS | | | 5/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 5/15/2013 | | FAIL |
Christina Prado
|
|
|
Appeal not up for DRH(ok to submit after 5/19/13), needs form 304, Fire Hydrant flow letter from United Water & electrical value added to application. Plans have an Adobe digital signature approved by Rita
|
Application received | | | 5/14/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2013 1:01PM
|
Plan assigned to (B_S) Barb | 5/21/2013 | | | | |
Barbara Stitt
|
|
|
Barb
|
Routing - PLAN CHECK | 6/13/2013 | | | | PEND |
Barbara Stitt
|
|
|
Barb- need resubmittals for Planning
|