Permanent Occupancy | | | 5/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PASS |
Jim Sly
|
|
|
Jeremy Phone #: 6###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/22/2013 | 5/23/2013 | 5/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 | P | FAIL |
Troy Cobbley
|
|
|
Repair the non-functional exit sign/emergency lights or remove since per the drawing they are not required.
|
Issue PAID IN FULL permit | | | 5/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 5/15/2013 | 5/15/2013 | 5/16/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/15/2013 | | 5/16/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 5/16/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/16/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2013 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2013 | | DONE |
Christina Prado
|
|
|
called Boise office to advise permit is ready for pick up
|
Permit Ready to Issue | | | 5/16/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/16/2013 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/15/2013 | | | |
|
|
|
|