Permit Information
Permit NumberBLD13-01230
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1826 S TRAVERTINE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 3,766 sq. ft., one story single family dwelling with 4 bedrooms, 3.5 bathrooms, and a 1,331 sq. ft. attached garage per the approved plans, attached structural engineerin, additional structural engineering, res check, plan review report and any notations. R-1A/DA zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/1/20141/2/20141/2/2014PPASS
DetailsDave Hannah
Phone #: 2088706009 >> Inspection requested via mobile web by Zane
DOC - Permit Finaled1/2/20141/2/20141/2/2014PPASS
DetailsDave Hannah
BLD-Final12/31/20131/2/20141/1/2014ACANC
DetailsDave Hannah
Phone #: 2088706009 >> Inspection requested via mobile web by Zane Inspection cancelled via mobile web on Wednesday, January 01, 2014.
BLD-Final12/27/201312/30/201312/30/2013PCANC
DetailsDave Hannah
Phone #: 2088706009 >> Inspection requested via mobile web by Zane Everman Inspection cancelled via mobile web on Monday, December 30, 2013.
PubWorks Occupancy Approval12/20/201312/20/201312/20/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is not acceptable has been received by Public Works. Builder has placed a bond with PDS for reveg/grading/walls. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance9/30/20139/30/20139/30/2013PPASS
DetailsDave Hannah
BLD-Conference9/27/20139/30/20139/30/2013APASS
DetailsDave Hannah
As early as possible Phone #: 8706009 >> Inspection requested via mobile web by Zane soffits and c/n items ok
BLD-Conference9/26/20139/27/20139/27/2013ACANC
DetailsDave Hannah
Phone #: 8706009 >> Inspection requested via mobile web by Zane Inspection cancelled via mobile web on Friday, September 27, 2013.
BLD-Framing/Rough-in9/24/20139/25/20139/25/2013PPART
DetailsJim Storey
Call prior to going Phone #: 8706009 >> Inspection requested via mobile web by Zane c/n posted need engineering t-62 63 bearing at garage wall.ok to insulate
BLD-Ceiling Grid Inspection9/24/20139/24/20139/24/2013PPASS
DetailsTom Arcoraci
soffiets can lights drywall ok
BLD-Framing/Rough-in9/23/20139/24/20139/24/2013ANR
DetailsTom Arcoraci
Call prior to going Phone #: 8904657 >> Inspection requested via mobile web by Tyler needs approved plans air seal package installed proir to inspection
BLD-Framing/Rough-in9/20/20139/23/20139/23/2013PDEFR
DetailsMike Jordan
Call prior to going Phone #: 8904657 >> Inspection requested via mobile web by Tyler. No time.
BLD-Conference9/17/20139/18/20139/18/2013ADONE
DetailsDave Hannah
Call prior to going Phone #: 8706009 >> Inspection requested via mobile web by Zane
BLD-Conference9/9/20139/9/20139/9/2013ADONE
DetailsDave Hannah
Call prior to going Phone #: 8706009 >> Inspection requested via mobile web by Zane
BLD-Conference9/6/20139/6/20139/9/2013PCANC
DetailsDave Hannah
Call prior to going Phone #: 8706009 >> Inspection requested via mobile web by Zane
BLD-Wall Bracing9/5/20139/6/20139/6/2013APART
DetailsMike Jordan
Phone #: 8904657 >> Inspection requested via mobile web by Tyler. Exterior shearwall nailing ok. Need to verifiy all simpson hdu holdowns on framing inspection, not yet installed.
BLD-Wall Bracing9/3/20139/4/20139/4/2013PPART
DetailsDave Hannah
Phone #: 8904657 >> Inspection requested via mobile web by Tyler garage front only
BLD-Foundation7/15/20137/15/20137/15/2013PPASS
DetailsJim Sly
Navaro Phone #: ###-####
BLD-Footing7/2/20137/2/20137/3/2013PPASS
DetailsDave Hannah
alvaro Phone #: ###-####
PubWorks Subgrade Approval7/2/20137/2/20137/2/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval for the foundation elements. The building department may be scheduled for footing inspections. Jason Taylor ###-####.
Issue PAID IN FULL permit  6/11/2013 DONE
OVERRIDE  6/10/2013  
Plan assigned to (AJS)5/16/20135/16/20136/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed due 6/4 hillside
Routing - PLAN CHECK6/10/2013 6/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  6/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
Inspection Record Card- Bld  6/10/2013 DONE
DetailsBarbara Stitt
Telephone call  6/10/2013 DONE
DetailsChristina Prado
called Zach and gave fees due
Permit Ready to Issue  6/10/2013 DONE
DetailsChristina Prado
Plan resubmittals received  6/4/2013  
Received 2 copies of sheets A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A4.0, A4.1, A6.0, A6.1, A8.0, A8.1, 2 copies of additional structural engineering and taken to Adele's desk
Routing - PLAN CHECK5/23/2013 5/31/2013 FAIL
DetailsAdele J Schaffeld-Griffin
plan review comments in documents emailed 5-31-13
1st review completed  5/31/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Addressing5/17/2013 5/28/2013 PASS
DetailsJason C. Taylor
Routing - FIRE5/22/2013 5/23/2013 PASS
DetailsTim Frost
No Comments
Routing - Erosion and Sediment5/22/2013 5/22/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL5/22/2013 5/22/2013 PASS
DetailsTroy James
Routing - MECHANICAL5/21/2013 5/22/2013 FAIL
DetailsTroy James
emailed correction to Ultimate Heating
Routing - PLANNING5/20/2013 5/21/2013 PASS
DetailsSusan Riggs
CFH13-00011 Susan Riggs
Routing - PUBLIC WORKS5/17/2013 5/20/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review5/16/20135/21/20135/17/2013 PASS
DetailsCindy M. Gould
Application received 5/16/20135/17/2013 DONE
DetailsTisha Gallop
Routing PW Grading-Hillside5/17/2013 5/17/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plans ACCEPTED BY PLAN TECH  5/16/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  5/16/2013  
Recd Pcfee & Taken To Pln CK  5/16/2013 DONE
DetailsTisha Gallop