Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD13-01236
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 600
Project NameZions Bank at 8th and Main
Customer Number 
ePlanReviewYes
Description
(ZIONS BANK HEADQUARTERS - 6TH STORY - SUITE 600) Fire sprinkler system used for high-rise. To construct 6 office suites and 3 assembly suites on the 18,300 square foot 6th story of a high-rise building. These plans also include work to be done under permit BLD13-01516 (Basement). This project will occupy the entire 6th story and will have a total floor area, including the common corridor, of about 16,277 square feet. Work is to include interior nonbearing walls, interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board ceiling soffits, millwork, and finishes. The roof at the 6th story floor level is NOT approved for occupancy. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/7/20154/6/2015 DONE
Print Statement  4/6/2015 DONE
DetailsRita DeYoung
Third Notice 1/11/20152/2/2015 DONE
Third Notice 11/12/201412/1/2014 DONE
Third Notice 9/3/201411/3/2014 DONE
e-mailed to Adam Johnson @ ESI
Third Notice 6/14/20148/29/2014 DONE
e-mailed to Adam Johnson
Third Notice 5/10/20146/9/2014 DONE
e-mailed to Adam Johnson
Third Notice 4/6/20145/5/2014 DONE
e-mailed to Adam Johnson
Second Notice 3/16/20144/1/2014 DONE
First Notice 1/27/20143/6/2014 DONE
BLD-Final1/16/20141/17/20141/22/2014APASS
DetailsDave Hannah
adam Phone #: ###-####
FIRE-Final Inspection1/16/20141/17/20141/17/2014APASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  1/17/2014 DONE
DetailsBarbara Stitt
BLD-Final1/16/20141/16/20141/16/2014PNR
DetailsJim Sly
Building final with Roger. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Need Fire life safety final.
FIRE-Final Inspection1/16/20141/16/20141/16/2014PPART
DetailsForrest France
Final pending exit signage per plan review notes and comments.
BLD-Final1/14/20141/15/20141/16/2014PNR
DetailsDave Hannah
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/14/20141/14/20141/15/2014PNR
DetailsForrest France
Request for Fire Life Saftey walk by Roger W. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/14/20141/15/20141/15/2014APART
DetailsForrest France
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final1/14/20141/14/20141/14/2014PDEFR
DetailsTony Young
Request for Fire Life Saftey walk by Roger W. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection12/10/201312/10/201312/11/2013PPART
DetailsDave Hannah
6th Floor Ceiling cover scheduled per Roger W. Thanks. AKJ 12-10-13 Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok for sw corner offices
BLD-Wall cover8/23/20138/26/20138/27/2013APASS
DetailsDave Hannah
Dave, Ready for cover inspection. 6th floor. I have permit set printing right now, will have in hand first thing Monday AM. Thanks. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Plan assigned to (CJW)6/11/20136/11/20138/23/2013 PASS
DetailsCarl Westfall
ZION'S BANK - STE 600 - ePlanReview - 6th Floor - BLD13-01516 also attached to this ePlanReview case for review (20 days - July 5 changed to July 23
Routing - FIRE8/20/2013 8/23/2013 PASS
DetailsTim Frost
Note: 2nd story remodel deleted from project. Permit BLD13-01236 assigned to the 6th story. Appears that a mop sink was added.
Routing - PLAN CHECK8/23/2013 8/23/2013 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  8/23/2013 DONE
Permit Ready to Issue  8/23/2013 DONE
DetailsTisha Gallop
Per Kristi Little at ACHD ok to issue permits per fee deferral agreement
Place hold on job8/23/2013 8/23/2013 DONE
DetailsTisha Gallop
Bld13-01516 (Zions Bank - basement) & Bld13-01236 (Zions Bank -6th floor) are on same plans in ePlanReview and need to be issued at same time.
Issue PAID IN FULL permit  8/23/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  8/23/2013 DONE
DetailsTisha Gallop
Routing PW Sewer Rating8/20/2013 8/21/2013 PASS
DetailsConnie Baumgartner
Note: 2nd story remodel deleted from project. Permit BLD13-01236 assigned to the 6th story. Appears that a mop sink was added.
Routing - PLUMBING8/20/2013 8/20/2013 PASS
DetailsBill VanDegrift
Note: 2nd story remodel deleted from project. Permit BLD13-01236 assigned to the 6th story. Appears that a mop sink was added. T&P to terminate at the mop sink.
Routing - PLAN CHECK8/16/2013 8/20/2013 PASS
DetailsCarl Westfall
Drawings approved
Routing - Addressing8/20/2013 8/20/2013 PASS
DetailsJason C. Taylor
This project should use 800 W Main St Suite 600 as its overall address.
Plan resubmittals received  8/16/2013 DONE
Routing - PLAN CHECK7/25/2013 8/6/2013 FAIL
DetailsCarl Westfall
2nd review completed. All sheets need to match the revised Architectural floor plan.
Plan resubmittals requested  8/6/2013 DONE
Plan resubmittals received  7/25/2013 DONE
2nd review delayed because of week long vacation.
Plan resubmittals requested  7/16/2013 DONE
Routing - PLAN CHECK6/11/2013 7/16/2013 FAIL
DetailsCarl Westfall
At the request of the applicant, this permit took the place of a permit submitted later. The actual accepted date was changed to 6-26-13. Revised drawings were required.
1st review completed  7/16/2013 DONE
Plan Reviewer's activity  7/15/2013 DONE
Made this permit (BLD13-01236) the primary permit. It was formerly assigned to the 2nd story. The 2nd story work will not be done. BLD13-01515 (formerly used for the 6th story) was assigned to the 2nd story and was voided.
Intake Approval  6/26/2013 PASS
Acceptance date changed because the applicant requested that another project that was submitted later take its place.
Telephone call  6/25/2013 DONE
Informed that the 2nd story TI has been canceled.
Routing - Addressing6/24/2013 6/24/2013 PASS
DetailsJason C. Taylor
Plans will be redlined for correct addresses.
Routing - FIRE6/11/2013 6/20/2013 PASS
DetailsScott Arellano
Attached plan review comments to plans.
Routing - Addressing6/11/2013 6/14/2013 FAIL
DetailsJason C. Taylor
Address is incomplete. Suite number must be submitted with each individual permit. Parcle numbers are wrong/out dated and must be resubmitted with correct parcel number. New sheets and application must be submitted. Jason Taylor ###-####.
Routing - PLUMBING6/11/2013 6/12/2013 PASS
DetailsBill VanDegrift
Per plan and 2009 ISPC.
Routing - PUBLIC WORKS6/11/2013 6/11/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCB6/11/2013 6/11/2013 DONE
DetailsJason Blais
Routing PW Sewer Rating6/11/2013 6/11/2013 PASS
DetailsConnie Baumgartner
Intake Approval  6/10/2013 PASS
DetailsTim L. Woodard
Telephone call  5/29/2013 DONE
Called and talked to Dave Anderson. Let him know this permit has not been submitted. He has uploaded docs but nothing has been been submitted for review. He said he though he still needed one form, but he thought he had submitted everything else. He will upload the last document and then submit everything. I gave him my info and told him to contact me if he needs any help.
Application received  5/17/2013 DONE
Application submitted via PDS Online on May 17 2013 10:39AM