Permit Information
Permit NumberBLD13-01264
StatusFinaled
Name TROY HENNE
Site Address 921 W AMITY RD
Project NameWESTERN CARGO
Customer Number 
ePlanReviewNo
Description
**(WESTERN CARGO)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 16,000 sq ft existing warehouse with offices. This space was previously occupied by "Nabisco" This building was built in 1975 in ADA County and annexed into Boise. In 1980 an addition was put on the building under Fiche 960809. There is a 12 inch brick wall meeting separation requirements at noted on permit BLD12-02001. This building is fully fire sprinklered for area increase any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. NO RACKING ALLOWED WITHOUT SEPARATE APPLICATION AND PERMIT. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/17/2013 DONE
DetailsTisha Gallop
BLD-Final6/10/20136/11/20136/11/2013APASS
DetailsJim Storey
Troy Phone #: ###-####
FIRE-Final Inspection6/5/20136/6/20136/6/2013APASS
DetailsForrest France
C/N items finished. Fire life safety finaled.
FIRE-Final Inspection5/29/20135/29/20135/29/2013APART
DetailsForrest France
Final pending remainder of noted correction items including hardware and main entry/exit signage.
BLD-Final5/23/20135/24/20135/24/2013ANR
DetailsJim Storey
Tom or Troy Phone #: ###-#### fire c/n
FIRE-Final Inspection5/23/20135/23/20135/23/2013PFAIL
DetailsForrest France
Provide approved hardware at required exit doors, post "door to remain...." signage at the main entry/exit, remove storage on the west office area ceiling.
Issue PAID IN FULL permit  5/23/2013 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)5/20/20135/20/20135/21/2013 PASS
DetailsAdele J Schaffeld-Griffin
due 5/24
Routing - PLAN CHECK5/20/2013 5/21/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  5/21/2013 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  5/21/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/21/2013 DONE
Permit Ready to Issue  5/21/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  5/21/2013 DONE
DetailsTisha Gallop
Telephone call  5/21/2013 DONE
DetailsTisha Gallop
called Troy and left mssge for him that permit is ready.
Application received 5/20/2013