BLD-Final | 12/29/2015 | 12/30/2015 | 12/30/2015 | A | PASS |
Jim Storey
|
|
|
Deb Phone #: ###-#### no card on site
|
Permanent Occupancy | | | 12/30/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/29/2015 | | DONE |
|
|
|
number disconnected. sent an email to ron
|
FIRE-Final Inspection | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PASS |
Forrest France
|
|
|
C/N items field verified. Life safety finaled.
|
FIRE-Final Inspection | 7/16/2014 | 7/17/2014 | 7/17/2014 | A | FAIL |
Troy Cobbley
|
|
|
Exit signs still need to be repaired and tested.
|
Plan Reviewer's activity | | | 7/16/2014 | | DONE |
Tim L. Woodard
|
|
|
Approved new floor plan showing removing one exterior egress door and showing a door previously not shown of the plans. New plan also recognized those areas served by that door will be used for storage only. Office areas can not exit through storage area. TLW
|
FIRE-Final Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exit signs as marked on the plans and provide plan review approval that the north exit door can be deleted. The High Piled Storage does not exceed 500 sq. ft. See email attached to case documents.
|
Plan Reviewer's activity | | | 5/14/2014 | | DONE |
Tim L. Woodard
|
|
|
Reference attached email. High Pile storage reduced to what is allowed within attached "Fire Plan Review Report". High Pile storage cannot exceed 500 square feet. TLW
|
Meeting | | | 11/6/2013 | | DONE |
Scott Arellano
|
|
|
Onsite meeting with facilities owner Debbie Cripe, Amy Snyder (Boise Airport), Captain Ray Criner (Boise Fire), Deputy Chief Romeo Gervais (Boise Fire) and Scott Arellano (PDS) to discuss options for the tenant to come into compliance with Boise City code and attain a certificate of occupancy. The owner agreed to reduce the quantity of High Piled Combustible Storage to a level which complies with the requirements of the Fire Code. The owner will work directly with the Fire Department to development a plan and timeline to accomplish this task. The remaining correction items listed under the Occupancy Evaluation Inspection will be completed and a request for re-inspection will be made by the owner; see PDS/Fire inspection activity on 6/14/13 for items and attached Fire Code plan review report. Approval of the existing steel storage racking will be subject to approval of the Building Official and Structural field Inspector.
|
FIRE-Final Inspection | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | FAIL |
Forrest France
|
|
|
Refer to fire code review notes items number 2, 3, 4, 6 and 7 and the list of general requirements page for details regarding deficiencies including door hardware at the main entry/exit, missing exit signs, fire extinguishers, storage array and racking permit required due to high piled storage over 12'.
|
Issue PAID IN FULL permit | | | 6/13/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/7/2013 | | DONE |
Tisha Gallop
|
|
|
called Debbie and left vm permit is ready.
|
Plan assigned to (TLW) | 5/21/2013 | | 6/6/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/5/2013 | | 6/6/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/6/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 6/5/2013 | | PASS |
|
|
|
|
Routing - FIRE | 5/30/2013 | | 6/5/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Case Summary (BLD) | | | 5/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/21/2013 | | 5/30/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and notes. TLW
|
Application received | | 5/21/2013 | 5/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/21/2013 | | DONE |
Tisha Gallop
|
|
|
ok per Carl M. and assign to Tim W.
|
First Notice | | 1/9/2016 | | | |
|
|
|
|