Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-01288
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 10051 W SMOKE RANCH DR
Project NameUnion Square Apts - Phase II
Customer Number 
ePlanReviewNo
Description
(UNION SQUARE APTS)(BLDG#14) To construct a wood frame, three story, 28,041 sq. ft., 24 Unit Multi Family Dwellings - 1 (1B/1B Type 'A'), 4 (2B/2B Type 'B'), 3 (1B/1B Type 'B'), 8 (2B/2B), and 8 (1B/1B), per reviewed plans. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/15/20146/10/2014 DONE
This permit finaled on the web by Mike McHargue
BLD-Final6/5/20146/6/20146/5/2014APASS
DetailsMike Jordan
Zoning Approval6/5/20146/5/20146/5/2014 PASS
DetailsJosh Wilson
Permanent Occupancy  6/5/2014 DONE
DetailsChristina Prado
Temporary Occupancy4/23/20147/22/20144/23/2014 DONE
DetailsBarbara Stitt
Temp occupancy extension granted for 60 days per Jason Blais-see scanned documents
Telephone call  4/21/2014 DONE
DetailsBarbara Stitt
Left a voise message for Shaw Brownlee regarding the Temp Occupancy and it's expiration date to call me on 4-21-14 @ 9:40am
BLD-Final1/24/20141/27/20141/27/2014APART
DetailsMike Jordan
Temp occ. granted. Wil be ok for eprm occ. once zoning and public works signs perm.
Temporary Occupancy1/27/20144/27/20141/27/2014 DONE
DetailsBarbara Stitt
BLD-Ceiling Grid Inspection1/23/20141/24/20141/24/2014PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Rescheduled for monday 1-27 in the AM.
Case Summary (BLD)  1/24/2014 DONE
FIRE-Final Inspection1/22/20141/23/20141/23/2014APASS
DetailsTroy Cobbley
Life safety passed. Self closing doors not set up yet. Building inspector please verify.
Zoning Approval Temp1/17/20141/17/20141/17/2014 PASS
DetailsJosh Wilson
180 day for landscaping. Bond in place.
BLD-Conference1/8/20141/8/20141/8/2014ADONE
DetailsMike Jordan
BLD-Wall cover10/15/201310/16/201310/16/2013APASS
DetailsMike Jordan
Center units, three on second floor, four on first floor. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. All units ok for cover. Interior shear walls, party walls and firestop is completed.
BLD-Wall cover10/14/201310/15/201310/15/2013APASS
DetailsMike Jordan
BLD-Wall cover10/14/201310/14/201310/14/2013PCANC
DetailsMike Jordan
BLD-Wall Bracing10/11/201310/14/201310/14/2013ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall cover10/11/201310/11/201310/11/2013ANR
DetailsMike Jordan
BLD-Wall cover10/11/201310/11/201310/11/2013PPART
DetailsMike Jordan
1st. floor east units ok. Middle units 2nd floor ok, for face layers on floor ceiling assemblies and 1st. floor middle units.
BLD-Wall cover10/9/201310/9/201310/9/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor east unit, interior shear, partywalls and firestop ok.
BLD-Wall cover10/7/201310/8/201310/8/2013PPASS
DetailsMike Jordan
1st. floor west units partywall, interior walls and firestopping ok.
BLD-Wall cover10/8/201310/8/201310/8/2013ANR
DetailsMike Jordan
BLD-Wall Bracing10/7/201310/7/201310/7/2013PPASS
DetailsMike Jordan
Interior shear walls, party walls and firestop ok at 3drfloor east and west units, 2nd floor east and west units are ok to tape and finish. Base layer on floor/ceiling assembly ok at 1st. floor east and west units.
BLD-Wall cover10/3/201310/4/201310/4/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3RD. FLOOR interior shear, partwalls and firestop ok. Ok to tape 3rd. floor enits at east a middle section of building.
BLD-Wall cover10/4/201310/4/201310/4/2013ANR
DetailsMike Jordan
BLD-Wall cover10/3/201310/3/201310/3/2013PPART
DetailsMike Jordan
3rd floor east units ok at party walls. Needs to firestop plumbing and electrical.
BLD-Wall Bracing10/2/201310/2/201310/2/2013PPART
DetailsMike Jordan
2nd floor base layer for floor ceiling assembly, west units only.
BLD-Wall Bracing10/2/201310/2/201310/2/2013ANR
DetailsMike Jordan
BLD-Wall Bracing10/1/201310/1/201310/1/2013PPART
DetailsMike Jordan
2nd floor lid, base layer ok, west units only.
BLD-Wall cover9/30/201310/1/201310/1/2013APART
DetailsMike Jordan
Sheet rock nailing on third floor walk. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall cover9/26/20139/27/20139/27/2013ACANC
DetailsMike Jordan
Insulation / Cover Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance9/27/20139/27/20139/27/2013APASS
DetailsMike Jordan
1st, 2nd and 3rd floors ok for sheet rock.
FIRE-Sprinkler Rough-in9/24/20139/24/20139/25/2013PPASS
DetailsTroy Cobbley
Tenting has been corrected. Sprinkler piping can be covered.
BLD-Energy code compliance9/25/20139/25/20139/25/2013PPART
DetailsMike Jordan
Airseal pack ok on 3rd floor and exterior walls.
BLD-Framing/Rough-in9/25/20139/25/20139/25/2013PPASS
DetailsMike Jordan
Framing for 1st, 2nd and 3rd floors ok.
BLD-Energy code compliance9/25/20139/25/20139/25/2013ACANC
DetailsMike Jordan
air sill, late AM. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Moved to pm.
BLD-Framing/Rough-in9/24/20139/24/20139/24/2013PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance9/24/20139/24/20139/24/2013PNR
DetailsMike Jordan
Air seal Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in9/23/20139/24/20139/24/2013APART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor framing and firestopping. Work in progress on framing repairs. 3rd floor firestopping ok. Needs to complete airseal package and provide truss engineering prior to cover.
BLD-Framing/Rough-in9/23/20139/23/20139/23/2013PPART
DetailsMike Jordan
Fire Caulk / framing / rough in Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor framing, fire stopping and blocking. Still missing fire cauliking on electrical wires and some plumbing.
BLD-Conference9/19/20139/19/20139/19/2013PPART
DetailsMike Jordan
Walk fire caulk application Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st floor plumbing penetrations. 80 % completed.
BLD-Conference9/11/20139/11/20139/13/2013PCANC
DetailsJim Sly
BLD-Conference9/10/20139/10/20139/12/2013PCANC
DetailsJim Sly
BLD-Wall Bracing8/28/20138/28/20138/28/2013APASS
DetailsMike Jordan
East end third floor building 14 sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. East and west end, 3rd. floor shear nailing, exterior walls ok.
BLD-Conference8/27/20138/27/20138/27/2013PDONE
DetailsMike Jordan
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall Bracing8/27/20138/27/20138/27/2013PPART
DetailsMike Jordan
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3rd floor, north and south sides only.
BLD-Conference8/23/20138/23/20138/23/2013APASS
DetailsMike Jordan
Pre rock on gable ends at corridors.
BLD-Wall Bracing8/14/20138/14/20138/14/2013PPASS
DetailsMike Jordan
first two floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Interior holdowns ok. Exterior shearwalls, 1st and 2nd. floors ok to cover.
BLD-Wall Bracing8/12/20138/12/20138/12/2013PNR
DetailsMike Jordan
first and second floors
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still needs to install floor to floor straps and tighten down interior hold downs.
BLD-Wall Bracing8/6/20138/6/20138/6/2013ANR
DetailsMike Jordan
BLD-Wall Bracing8/5/20138/5/20138/5/2013PNR
DetailsMike Jordan
First two floors wall bracing and hold downs. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still missing some areas on 1st and 2nd floor, needs to install floor to floor straps and complete install of holdowns.
BLD-Wall Bracing8/2/20138/2/20138/2/2013PNR
DetailsMike Jordan
BLD-Wall Bracing7/31/20137/31/20137/31/2013PPART
DetailsMike Jordan
1st. floor, exterior walls only.
BLD-Framing/Rough-in7/30/20137/30/20137/30/2013PPART
DetailsMike Jordan
Partial inspection on shearwalls, 2nd. floor, west end.
BLD-Conference7/24/20137/25/20137/25/2013PPART
DetailsMike Jordan
Walk through for framing inspection. Recieved the 1hr. floor ceiling assembly for the roseburg RFPI joist being used on the project. Will have scanned in. Will be using joist on all buildings.
BLD-Conference7/24/20137/24/20137/24/2013PPART
DetailsMike Jordan
Framing review Phone #: ###-#### >> Inspection requested via web by Mike McHargue. PArtial walk through on 1st floor framing in progress.
Permit Ready to Issue  7/17/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  7/17/2013 DONE
DetailsChristina Prado
Print Occupancy Form  7/17/2013 DONE
DetailsChristina Prado
Routing PW Sewer Design7/3/2013 7/3/2013 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE6/28/20136/28/20136/28/2013 PASS
DetailsTim Frost
Plan assigned to (SRZ)5/24/20135/24/20136/28/2013 PASS
DetailsSam Zahorka
1st review completed. ePlanReview - Union Square Bldg #14
Routing - PLAN CHECK6/28/2013 6/28/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/28/2013 DONE
DetailsSam Zahorka
Routing PW Solid Waste5/28/2013 6/28/2013 PASS
DetailsPeter J. McCullough
Signed off PASS in ePlan Review.
Routing - PLAN CHECK6/24/2013 6/28/2013 PASS
DetailsSam Zahorka
Routing - PUBLIC WORKS6/28/2013 6/28/2013 PASS
DetailsBeverly Mountain
Routing PW Street Lights6/27/2013 6/27/2013 PASS
DetailsMike D Hedge
Routing - FIRE6/24/20136/24/20136/24/2013 FAIL
DetailsTim Frost
Routing - PLUMBING6/24/2013 6/24/2013 PASS
DetailsBill VanDegrift
see P5 for suds relief comments
Routing - PLAN CHECK6/21/2013 6/21/2013 PEND
DetailsSam Zahorka
Pending Plumbing, Fire, Public Works, Street lights, and Sewer Design to PASS prior to issuance.
Routing Off Site - STRUCTURAL6/21/2013 6/21/2013 PASS
DetailsSam Zahorka
1st review completed  6/17/2013 DONE
DetailsSam Zahorka
Routing PW Street Lights5/28/2013 6/17/2013 FAIL
DetailsMike D Hedge
Signed off FAIL in ePlanReview
Routing PW Sewer Design5/28/2013 6/17/2013 FAIL
DetailsKyle S. Rosenmeyer
Signed off FAIL (PW Sewer Design, Street Lights) in ePlanReview
Routing - PLAN CHECK5/24/2013 6/17/2013 FAIL
DetailsSam Zahorka
Routing - PLANNING Land Div5/24/2013 6/17/2013 PASS
DetailsSam Zahorka
Signed off PASS in ePlanReview
Routing - Erosion and Sediment5/24/2013 6/17/2013 FAIL
DetailsKimberly M. Johnson
Signed off FAIL in ePlanReview
Routing PW Drainage5/28/2013 6/12/2013 PASS
DetailsBrian Murphy
Routing - PLANNING5/24/2013 6/6/2013 PASS
DetailsSusan Riggs
Susan Riggs - CUP12-00064
Routing Off Site - STRUCTURAL5/24/2013 6/6/2013 FAIL
DetailsRon Hill
Sent comments to architect Billy Edwards.
Route to Impact Fee Review5/24/20135/30/20136/5/2013 PASS
DetailsCindy M. Gould
Routing - Erosion and Sediment6/3/2013 6/3/2013 PASS
DetailsKimberly M. Johnson
Routing - PLUMBING5/24/2013 5/31/2013 FAIL
DetailsBill VanDegrift
1) provide seperate stack for top two floors of suds producing fixtures for suds relief, tubs,sinks washers, etc.
2) 2" min. waste below slab.
3) vent floor drains, tie to waste and trap.
4) one tub on 1 1/2" stack.
Routing - MECHANICAL5/24/2013 5/30/2013 PASS
DetailsTroy James
Routing - FIRE5/24/2013 5/29/2013 FAIL
DetailsScott Arellano
Attached report to case and emailed report to architect.
Routing - Addressing5/24/2013 5/28/2013 PASS
DetailsJason C. Taylor
New addresses have been added to the buildings with correct apartment numbers. Please see uploaded sheets in Project Dox. Jason Taylor ###-####.
Routing - PUBLIC WORKS5/24/2013 5/28/2013 PASS
DetailsBeverly Mountain
Routing - Design Review5/24/2013 5/28/2013 PASS
DetailsJosh Wilson
Josh Wilson - DRH13-00005
Routing PW Sewer Rating5/28/2013 5/28/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCB5/24/2013 5/24/2013 DONE
DetailsJason Blais
Intake Approval  5/23/2013 PASS
DetailsSam Zahorka
Application received  5/21/2013 DONE
Application submitted via PDS Online on May 21 2013 4:17PM