First Notice | | 6/15/2014 | 6/10/2014 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
BLD-Final | 6/5/2014 | 6/6/2014 | 6/5/2014 | A | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 6/5/2014 | 6/5/2014 | 6/5/2014 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 6/5/2014 | | DONE |
Christina Prado
|
|
|
|
Temporary Occupancy | 4/23/2014 | 7/22/2014 | 4/23/2014 | | DONE |
Barbara Stitt
|
|
|
Temp occupancy extension granted for 60 days per Jason Blais-see scanned documents
|
Telephone call | | | 4/21/2014 | | DONE |
Barbara Stitt
|
|
|
Left a voise message for Shaw Brownlee regarding the Temp Occupancy and it's expiration date to call me on 4-21-14 @ 9:40am
|
BLD-Final | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | PART |
Mike Jordan
|
|
|
Temp occ. granted. Wil be ok for eprm occ. once zoning and public works signs perm.
|
Temporary Occupancy | 1/27/2014 | 4/27/2014 | 1/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Ceiling Grid Inspection | 1/23/2014 | 1/24/2014 | 1/24/2014 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Rescheduled for monday 1-27 in the AM.
|
Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Self closing doors not set up yet. Building inspector please verify.
|
Zoning Approval Temp | 1/17/2014 | 1/17/2014 | 1/17/2014 | | PASS |
Josh Wilson
|
|
|
180 day for landscaping. Bond in place.
|
BLD-Conference | 1/8/2014 | 1/8/2014 | 1/8/2014 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | PASS |
Mike Jordan
|
|
|
Center units, three on second floor, four on first floor. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. All units ok for cover. Interior shear walls, party walls and firestop is completed.
|
BLD-Wall cover | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/14/2013 | 10/14/2013 | 10/14/2013 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | PART |
Mike Jordan
|
|
|
1st. floor east units ok. Middle units 2nd floor ok, for face layers on floor ceiling assemblies and 1st. floor middle units.
|
BLD-Wall cover | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor east unit, interior shear, partywalls and firestop ok.
|
BLD-Wall cover | 10/7/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Mike Jordan
|
|
|
1st. floor west units partywall, interior walls and firestopping ok.
|
BLD-Wall cover | 10/8/2013 | 10/8/2013 | 10/8/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Mike Jordan
|
|
|
Interior shear walls, party walls and firestop ok at 3drfloor east and west units, 2nd floor east and west units are ok to tape and finish. Base layer on floor/ceiling assembly ok at 1st. floor east and west units.
|
BLD-Wall cover | 10/3/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3RD. FLOOR interior shear, partwalls and firestop ok. Ok to tape 3rd. floor enits at east a middle section of building.
|
BLD-Wall cover | 10/4/2013 | 10/4/2013 | 10/4/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PART |
Mike Jordan
|
|
|
3rd floor east units ok at party walls. Needs to firestop plumbing and electrical.
|
BLD-Wall Bracing | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PART |
Mike Jordan
|
|
|
2nd floor base layer for floor ceiling assembly, west units only.
|
BLD-Wall Bracing | 10/2/2013 | 10/2/2013 | 10/2/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | PART |
Mike Jordan
|
|
|
2nd floor lid, base layer ok, west units only.
|
BLD-Wall cover | 9/30/2013 | 10/1/2013 | 10/1/2013 | A | PART |
Mike Jordan
|
|
|
Sheet rock nailing on third floor walk. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall cover | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | CANC |
Mike Jordan
|
|
|
Insulation / Cover Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 9/27/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Mike Jordan
|
|
|
1st, 2nd and 3rd floors ok for sheet rock.
|
FIRE-Sprinkler Rough-in | 9/24/2013 | 9/24/2013 | 9/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Tenting has been corrected. Sprinkler piping can be covered.
|
BLD-Energy code compliance | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PART |
Mike Jordan
|
|
|
Airseal pack ok on 3rd floor and exterior walls.
|
BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Mike Jordan
|
|
|
Framing for 1st, 2nd and 3rd floors ok.
|
BLD-Energy code compliance | 9/25/2013 | 9/25/2013 | 9/25/2013 | A | CANC |
Mike Jordan
|
|
|
air sill, late AM. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Moved to pm.
|
BLD-Framing/Rough-in | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | NR |
Mike Jordan
|
|
|
Air seal Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Framing/Rough-in | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor framing and firestopping. Work in progress on framing repairs. 3rd floor firestopping ok. Needs to complete airseal package and provide truss engineering prior to cover.
|
BLD-Framing/Rough-in | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PART |
Mike Jordan
|
|
|
Fire Caulk / framing / rough in Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor framing, fire stopping and blocking. Still missing fire cauliking on electrical wires and some plumbing.
|
BLD-Conference | 9/19/2013 | 9/19/2013 | 9/19/2013 | P | PART |
Mike Jordan
|
|
|
Walk fire caulk application Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st floor plumbing penetrations. 80 % completed.
|
BLD-Conference | 9/11/2013 | 9/11/2013 | 9/13/2013 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 9/10/2013 | 9/10/2013 | 9/12/2013 | P | CANC |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 8/28/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Mike Jordan
|
|
|
East end third floor building 14 sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. East and west end, 3rd. floor shear nailing, exterior walls ok.
|
BLD-Conference | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | DONE |
Mike Jordan
|
|
|
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | PART |
Mike Jordan
|
|
|
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3rd floor, north and south sides only.
|
BLD-Conference | 8/23/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Mike Jordan
|
|
|
Pre rock on gable ends at corridors.
|
BLD-Wall Bracing | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PASS |
Mike Jordan
|
|
|
first two floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Interior holdowns ok. Exterior shearwalls, 1st and 2nd. floors ok to cover.
|
BLD-Wall Bracing | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | NR |
Mike Jordan
|
|
|
first and second floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still needs to install floor to floor straps and tighten down interior hold downs.
|
BLD-Wall Bracing | 8/6/2013 | 8/6/2013 | 8/6/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | NR |
Mike Jordan
|
|
|
First two floors wall bracing and hold downs. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still missing some areas on 1st and 2nd floor, needs to install floor to floor straps and complete install of holdowns.
|
BLD-Wall Bracing | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PART |
Mike Jordan
|
|
|
1st. floor, exterior walls only.
|
BLD-Framing/Rough-in | 7/30/2013 | 7/30/2013 | 7/30/2013 | P | PART |
Mike Jordan
|
|
|
Partial inspection on shearwalls, 2nd. floor, west end.
|
BLD-Conference | 7/24/2013 | 7/25/2013 | 7/25/2013 | P | PART |
Mike Jordan
|
|
|
Walk through for framing inspection. Recieved the 1hr. floor ceiling assembly for the roseburg RFPI joist being used on the project. Will have scanned in. Will be using joist on all buildings.
|
BLD-Conference | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PART |
Mike Jordan
|
|
|
Framing review Phone #: ###-#### >> Inspection requested via web by Mike McHargue. PArtial walk through on 1st floor framing in progress.
|
Permit Ready to Issue | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Routing PW Sewer Design | 7/3/2013 | | 7/3/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 6/28/2013 | 6/28/2013 | 6/28/2013 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (SRZ) | 5/24/2013 | 5/24/2013 | 6/28/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed. ePlanReview - Union Square Bldg #14
|
Routing - PLAN CHECK | 6/28/2013 | | 6/28/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing PW Solid Waste | 5/28/2013 | | 6/28/2013 | | PASS |
Peter J. McCullough
|
|
|
Signed off PASS in ePlan Review.
|
Routing - PLAN CHECK | 6/24/2013 | | 6/28/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 6/28/2013 | | 6/28/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | 6/27/2013 | | 6/27/2013 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | 6/24/2013 | 6/24/2013 | 6/24/2013 | | FAIL |
Tim Frost
|
|
|
|
Routing - PLUMBING | 6/24/2013 | | 6/24/2013 | | PASS |
Bill VanDegrift
|
|
|
see P5 for suds relief comments
|
Routing - PLAN CHECK | 6/21/2013 | | 6/21/2013 | | PEND |
Sam Zahorka
|
|
|
Pending Plumbing, Fire, Public Works, Street lights, and Sewer Design to PASS prior to issuance.
|
Routing Off Site - STRUCTURAL | 6/21/2013 | | 6/21/2013 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 6/17/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing PW Street Lights | 5/28/2013 | | 6/17/2013 | | FAIL |
Mike D Hedge
|
|
|
Signed off FAIL in ePlanReview
|
Routing PW Sewer Design | 5/28/2013 | | 6/17/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Signed off FAIL (PW Sewer Design, Street Lights) in ePlanReview
|
Routing - PLAN CHECK | 5/24/2013 | | 6/17/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLANNING Land Div | 5/24/2013 | | 6/17/2013 | | PASS |
Sam Zahorka
|
|
|
Signed off PASS in ePlanReview
|
Routing - Erosion and Sediment | 5/24/2013 | | 6/17/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Signed off FAIL in ePlanReview
|
Routing PW Drainage | 5/28/2013 | | 6/12/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 5/24/2013 | | 6/6/2013 | | PASS |
Susan Riggs
|
|
|
Susan Riggs - CUP12-00064
|
Routing Off Site - STRUCTURAL | 5/24/2013 | | 6/6/2013 | | FAIL |
Ron Hill
|
|
|
Sent comments to architect Billy Edwards.
|
Route to Impact Fee Review | 5/24/2013 | 5/30/2013 | 6/5/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 6/3/2013 | | 6/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLUMBING | 5/24/2013 | | 5/31/2013 | | FAIL |
Bill VanDegrift
|
|
|
1) provide seperate stack for top two floors of suds producing fixtures for suds relief, tubs,sinks washers, etc.
2) 2" min. waste below slab.
3) vent floor drains, tie to waste and trap.
4) one tub on 1 1/2" stack.
|
Routing - MECHANICAL | 5/24/2013 | | 5/30/2013 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 5/24/2013 | | 5/29/2013 | | FAIL |
Scott Arellano
|
|
|
Attached report to case and emailed report to architect.
|
Routing - Addressing | 5/24/2013 | | 5/28/2013 | | PASS |
Jason C. Taylor
|
|
|
New addresses have been added to the buildings with correct apartment numbers. Please see uploaded sheets in Project Dox. Jason Taylor ###-####.
|
Routing - PUBLIC WORKS | 5/24/2013 | | 5/28/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 5/24/2013 | | 5/28/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH13-00005
|
Routing PW Sewer Rating | 5/28/2013 | | 5/28/2013 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 5/24/2013 | | 5/24/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 5/23/2013 | | PASS |
Sam Zahorka
|
|
|
|
Application received | | | 5/21/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2013 4:17PM
|