Permit Information
Permit NumberBLD13-01292
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 1391 S GOLDKING WAY
Project NameUnion Square Apts - Phase II
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE APTS)(BLDG#16) (GARAGE - 7 Spaces Enclosed Garage) - To construct a one story, 1,627 sq. ft., wood frame, private parking garage as per reviewed plans. Work includes concrete footing, foundation & slab; wood frame walls with finish material on exterior side, roof trusses, sheathing and roof covering as per the reviewed plans. An accessible garage parking stall will be provided in this building. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/10/20146/10/2014 DONE
This permit finaled on the web by Mike McHargue
Second Notice 5/5/20146/5/2014 DONE
e-mailed to John Laude and Mike McHargue at Trilogy Dev.
First Notice 4/12/20144/25/2014 DONE
mailed
Zoning Approval4/2/20144/2/20144/2/2014 PASS
DetailsJosh Wilson
Permanent Occupancy  4/2/2014 DONE
DetailsChristina Prado
BLD-Final3/24/20143/25/20143/25/2014PPASS
DetailsMike Jordan
Garages at Union Square Final Phone #: ###-#### >> Inspection requested via web by Mike McHargue
FIRE-Final Inspection3/24/20143/25/20143/25/2014APASS
DetailsTroy Cobbley
Life safety passed
BLD-Wall Bracing11/15/201311/15/201311/15/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Footing6/26/20136/26/20136/26/2013PPASS
DetailsMike Jordan
footing stem wall//Mike Phone #: ###-####. Bldg 16 garage.
Issue PAID IN FULL permit  6/26/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  6/26/2013 DONE
DetailsTisha Gallop
OVERRIDE  6/25/2013  
Permit Ready to Issue  6/25/2013 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)5/24/20135/24/20136/24/2013 PASS
DetailsSam Zahorka
1st review completed. ePlanReview - Union Square Garage
PLANS/APPL TAKEN TO FRONT DESK  6/24/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/20/2013 6/24/2013 PASS
DetailsSam Zahorka
Pending ESC and Structural to PASS.
Routing Off Site - STRUCTURAL6/19/2013 6/24/2013 PASS
DetailsSam Zahorka
Routing - Erosion and Sediment6/19/2013 6/20/2013 PASS
DetailsKimberly M. Johnson
Approved as noted:1. The City of Boise requires BMPs are put in place to protect the porous pavement.

2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.

3. Additional 0.62 acre staging area on north side of Smoke Ranch Drive was approved 6/20/2013
Routing - PLAN CHECK5/24/2013 6/17/2013 FAIL
DetailsSam Zahorka
Routing - PLANNING Land Div5/24/2013 6/17/2013 PASS
DetailsSam Zahorka
Signed off as PASS in ePlan Review.
1st review completed  6/17/2013 DONE
DetailsSam Zahorka
Routing PW Drainage5/28/2013 6/12/2013 PASS
DetailsBrian Murphy
Routing - PLANNING5/24/2013 6/6/2013 PASS
DetailsSusan Riggs
Susan Riggs - CUP12-00064
Routing Off Site - STRUCTURAL5/24/2013 6/4/2013 FAIL
DetailsRon Hill
Sent requirements to Billy Edwards architect.
Route to Impact Fee Review5/24/20135/30/20136/3/2013 PASS
DetailsCindy M. Gould
parking for apartments no impact fees
Routing - Erosion and Sediment5/30/2013 6/3/2013 PASS
DetailsKimberly M. Johnson
Approved as noted: 1. The City of Boise requires BMPs are put in place to protect the porous pavement once installed. Phase I of the Union Square Apartments is familiar with this practice and currently uses plastic sheeting and gravel bags or scrap wood to secure it. This practice helps to avoid the need for premature maintenance on the stormwater system.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
Additional plans submitted  5/30/2013 DONE
DetailsKimberly M. Johnson
ESC narrative emailed to KMJ
Routing - FIRE5/24/2013 5/29/2013 PASS
DetailsScott Arellano
No comments attached.
Routing - PUBLIC WORKS5/24/2013 5/28/2013 PASS
DetailsBeverly Mountain
Routing - Addressing5/24/2013 5/28/2013 PASS
DetailsJason C. Taylor
site address is 1391 not 1399.
Routing - Design Review5/24/2013 5/28/2013 PASS
DetailsJosh Wilson
Josh Wilson - DRH13-00005
Routing - Erosion and Sediment5/24/2013 5/24/2013 FAIL
DetailsKimberly M. Johnson
ESC Narrative is for the improvements to Smoke Ranch Drive and not for the new construction. Please upload ESC plan that covers new construction
Pending Assignment by JCB5/24/2013 5/24/2013 DONE
DetailsJason Blais
Intake Approval  5/23/2013 PASS
DetailsSam Zahorka
Application received  5/21/2013 DONE
Application submitted via PDS Online on May 21 2013 4:19PM