Third Notice | | 6/10/2014 | 6/10/2014 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
Second Notice | | 5/5/2014 | 6/5/2014 | | DONE |
|
|
|
e-mailed to John Laude and Mike McHargue at Trilogy Dev.
|
First Notice | | 4/12/2014 | 4/25/2014 | | DONE |
|
|
|
mailed
|
Zoning Approval | 4/2/2014 | 4/2/2014 | 4/2/2014 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 4/2/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/24/2014 | 3/25/2014 | 3/25/2014 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
PubWorks Occupancy Approval | 3/6/2014 | 3/6/2014 | 3/6/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Wall Bracing | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Exterior shear nailing ok. Ok to cover.
|
BLD-Foundation | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Mike Jordan
|
|
|
garage 17 stemwall inspection Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Foundation | 8/5/2013 | 8/5/2013 | 8/5/2013 | A | CANC |
Mike Jordan
|
|
|
garage 17 foundation walls late morning. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Footing | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | PART |
Mike Jordan
|
|
|
Footing rebar inspection on garage 17. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
Issue PAID IN FULL permit | | | 6/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/25/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 6/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (SRZ) | 5/24/2013 | 5/24/2013 | 6/24/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed. ePlanReview - Union Square Garage
|
Routing Off Site - STRUCTURAL | 6/19/2013 | | 6/24/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 6/24/2013 | | 6/20/2013 | | PASS |
Sam Zahorka
|
|
|
Pending ESC and Structural to PASS.
|
Routing - Erosion and Sediment | 6/19/2013 | | 6/20/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved in EPlan as noted:
1. The City of Boise requires BMPs are put in place to protect the porous pavement.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
3. Additional 0.62 acre staging area on north side of Smoke Ranch Drive was approved 6/20/2013
|
1st review completed | | | 6/17/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/24/2013 | | 6/17/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 5/24/2013 | | 6/17/2013 | | PASS |
Susan Riggs
|
|
|
Signed off as PASS in ePlan Review. Susan Riggs - CUP12-00064
|
Routing - PLANNING Land Div | 5/24/2013 | | 6/17/2013 | | PASS |
Dave Abo
|
|
|
Signed off as PASS in ePlan Review.
|
Routing PW Drainage | 5/28/2013 | | 6/5/2013 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 5/24/2013 | 5/30/2013 | 6/3/2013 | | PASS |
Cindy M. Gould
|
|
|
Parking for apartments no impact fees
|
Routing Off Site - STRUCTURAL | 5/24/2013 | | 6/3/2013 | | FAIL |
Ron Hill
|
|
|
Sent requirements to Billy Edwards.
|
Routing - Erosion and Sediment | 5/30/2013 | | 6/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved as noted: 1. The City of Boise requires BMPs are put in place to protect the porous pavement once installed. Phase I of the Union Square Apartments is familiar with this practice and currently uses plastic sheeting and gravel bags or scrap wood to secure it. This practice helps to avoid the need for premature maintenance on the stormwater system.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
|
Plan resubmittals received | | | 5/30/2013 | | DONE |
Kimberly M. Johnson
|
|
|
ESC narrative emailed to KMJ
|
Routing - FIRE | 5/24/2013 | | 5/29/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Addressing | 5/24/2013 | | 5/28/2013 | | PASS |
Jason C. Taylor
|
|
|
correct site address is 1391 not 1399.
|
Routing - PUBLIC WORKS | 5/24/2013 | | 5/28/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 5/24/2013 | | 5/28/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilsion - DRH13-00005
|
Routing - Erosion and Sediment | 5/24/2013 | | 5/24/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
ESC Narrative is for the improvements to Smoke Ranch Drive and not for the new construction. Please upload ESC plan that covers new construction
|
Pending Assignment by JCB | 5/24/2013 | | 5/24/2013 | | DONE |
Jason Blais
|
|
|
|
Routing PW Street Lights | 5/24/2013 | | 5/24/2013 | | FAIL |
Mike D Hedge
|
|
|
|
Intake Approval | | | 5/23/2013 | | PASS |
Sam Zahorka
|
|
|
|
Application received | | | 5/21/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2013 4:20PM
|