Permit Information
Permit NumberBLD13-01321
StatusFinaled
Name BILTMORE COMPANY
Site Address 6741 W IRVING ST
Project NameAberdeen Place
Customer Number 
ePlanReviewNo
Description
Aberdeen Place Four-Plex (Lot 1, Bldg. 4) - To construct a new 4,004 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, and two bathrooms. The 1st story units are required to be Type 'B' units. Three units share a common path of egress into and through a 1-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00081 & CUP13-00017 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/10/20147/2/2015 DONE
This permit finaled on the web by Jeremy Amar
Permanent Occupancy  4/30/2014 DONE
DetailsBarbara Stitt
BLD-Aging Inspection3/17/20143/17/20143/17/2014 PEND
DetailsTom Arcoraci
Zoning Approval3/7/20143/7/20143/7/2014 DONE
DetailsAndrea Tuning
BLD-Final1/15/20141/15/20141/16/2014APASS
DetailsJim Storey
###-#### Pat--Please call prior to inspection need card changed to 20 min. door protection// final ok pending zoning approval
Temporary Occupancy1/16/20144/16/20141/16/2014 DONE
DetailsChristina Prado
Zoning Approval Temp1/15/20141/15/20141/15/2014 DONE
DetailsAndrea Tuning
Temporary occupance has been granted. A bond has been provided for exterior painting and landscaping (BND14-00006). Bond expires on April 14, 2014.
FIRE-Final Inspection1/10/20141/10/20141/10/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Energy code compliance11/21/201311/21/201311/21/2013PPASS
DetailsTom Arcoraci
pat Phone #: ###-####
BLD-Energy code compliance11/15/201311/15/201311/15/2013PPASS
DetailsTom Arcoraci
Pat Phone #: ###-####
BLD-Framing/Rough-in11/13/201311/13/201311/13/2013PPASS
DetailsTom Arcoraci
Pat Phone #: ###-####
Routing - MECHANICAL9/10/2013 9/10/2013 PASS
DetailsTroy James
BLD-Foundation8/23/20138/23/20138/23/2013PPASS
DetailsTom Arcoraci
BLD-Footing8/21/20138/22/20138/22/2013APASS
DetailsTom Arcoraci
BLD-Footing8/21/20138/21/20138/21/2013PNR
DetailsTom Arcoraci
john Phone #: ###-####
OVERRIDE  7/24/2013  
Application received 5/23/20137/24/2013 DONE
Print Occupancy Form  7/24/2013 DONE
DetailsTisha Gallop
Telephone call  7/24/2013 DONE
LM with Micah - permits ready fees given
Permit Ready to Issue  7/24/2013  
Issue PAID IN FULL permit  7/24/2013 DONE
DetailsTisha Gallop
Routing - PLAN CHECK7/22/2013 7/23/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/23/2013 DONE
DetailsSam Zahorka
Plan assigned to (SRZ)5/28/2013 7/23/2013 PASS
DetailsSam Zahorka
1st review completed.
Plan resubmittals received  7/22/2013 DONE
DetailsTisha Gallop
received two copies of plan sheets L-1, L-2, L-3; inserted by arch. rep. and taken back to Sam Zahorka.
Routing - PLANNING7/22/2013 7/22/2013 PASS
DetailsAndrea Tuning
Routing - FIRE7/12/2013 7/16/2013 PASS
DetailsScott Arellano
IFC Review attached to plans.
Routing - PLAN CHECK7/11/2013 7/12/2013 PASS
DetailsSam Zahorka
Routing - PLANNING7/10/2013 7/11/2013 PASS
DetailsTodd Tucker
Routing - PLANNING7/9/2013 7/9/2013 FAIL
DetailsAndrea Tuning
The applicant has not meet the conditions of approval of the DR application (DRH13-00081). The applicant shall: Provide a 20-foot setback from Irving and Colehaven for each building and carport, Provide a 15-foot rear setback for each building, Submit a detailed site plan that has been prepared by an architect, landscape architect, landscape designer working as a professional in this field or qualified nurseryman that meets the required landscape ordinance, submit details of the trash enclosures colors and materials for review and approval. All of these plans should be submitted to the DR staff prior to submitting for any construction permits.
Routing - PLUMBING7/8/2013 7/8/2013 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - Erosion and Sediment7/3/2013 7/8/2013 PASS
DetailsKimberly M. Johnson
Also see ESC13-00655 for permitting of 11.25 acres of development
Routing - PUBLIC WORKS7/2/2013 7/3/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste7/3/2013 7/3/2013 PASS
DetailsPeter J. McCullough
Route to Impact Fee Review7/1/20137/5/20137/2/2013 PASS
DetailsCindy M. Gould
Routing - FIRE6/24/20136/24/20137/1/2013 FAIL
DetailsTim Frost
1st review completed  7/1/2013 FAIL
Failed - Public Works, ESC, Fire, Plan Check, Planning
Plan Reviewer's activity  7/1/2013 DONE
Emailed RP review
Case Summary (BLD)  6/24/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/6/2013 6/24/2013 FAIL
DetailsSam Zahorka
Framing and Foundation do not line up. Need updated S-sheets with engineers stamp. Per redlines for 1/2 -hour fire rated open ended corridor.
Routing - PLANNING6/18/2013 6/19/2013 FAIL
DetailsTodd Tucker
The site plan does not comply with the conditions of approval for CUP13-00017.
1a. A 20 foot front setback and street side setback shall be provided for each building and associated covererd front porch. This includes any covered parking including carports.
1b. A 15 foot rear setback shall be provided for each structure including garbage can enclosures.
Routing - PLANNING Land Div6/18/2013 6/19/2013 PASS
DetailsTodd Tucker
Parcel is a platted lot in a recorded subdivision.
Routing - PLANNING6/18/2013 6/18/2013 FAIL
DetailsAndrea Tuning
The applicant has not meet the conditions of approval of the DR application (DRH13-00081). The applicant shall: Provide a 20-foot setback from Irving and Colehaven for each building and carport, Provide a 15-foot rear setback for each building, Submit a detailed site plan that has been prepared by an architect, landscape architect, landscape designer working as a professional in this field or qualified nurseryman that meets the required landscape ordinance, submit details of teh trash enclosures colors and materials for review and approval. All of these plans should be submitted to the DR staff prior to submitting for any construction permits.
Routing - PLUMBING6/5/2013 6/6/2013 FAIL
DetailsBill VanDegrift
see bld13-01316 for review comments
Routing - Erosion and Sediment6/3/2013 6/5/2013 FAIL
DetailsKimberly M. Johnson
1. The City of Boise does not enforce federal regulation however, I am required to advise you of your obligation to seek or obtain necessary coverage under the NPDES Construction General Permit. Your construction projects appears to meet the definition of a common plan of development that will disturb greater than one acre. Please amend section 5 of the ESC plan to reflect the owners and operators duty to obtain NPDES coverage. We had some discussion on potentially reducing the size of your development. If you proceed with this, please submit revised plans reflecting this change.
2. The anticipated work schedule in the plans show work on all lots occurring simultaneously beginning in May and final landscaping completed in July. While speaking with you on the phone, you had indicated the projects will be phased. Please update the project schedules so they accurately depict this phasing.
3. The plan indicates that “Stockpiles will be placed on the vacant lots out of the public right of way”. Stockpiles that are a part of the construction activity must be stockpiled in the permitted area or otherwise shown on the map to include the additional disturbance in the permits.
4. The staging area, sanitary facility, and concrete washout must also be located in the permitted area or this additional area of disturbance must be included.
5. I did not receive appropriately sized plan maps for all lots. Commercial plan maps must be at least 18”x24” and I can accept 11”x17” for a single lot. I received appropriately sized plans for Lot 1/Block 1, Lot 2/Block 1, and Lot 3/Block 1. All other maps submitted were only 8.5”x11”. You may choose to eliminate the reference to a single lot by creating one map showing the entire disturbance area and associated BMPs lot and block if you choose.
The ESC narratives states that a stabilized construction entrance will be used for project vehicles and equipment to access each lot. A detail for the construction entrance must be provided and the construction entrance locations shown on the map
Routing PW Solid Waste6/3/2013 6/3/2013 FAIL
DetailsPeter J. McCullough
Routing - PUBLIC WORKS5/29/2013 6/3/2013 FAIL
DetailsConnie Baumgartner
Routing - Addressing5/28/2013 5/29/2013 PASS
DetailsJason C. Taylor
Pending Assignment by JCM5/28/2013 5/28/2013 DONE
DetailsJohn Menard
Plan routing begun/NEW & ADDTN  5/28/2013  
Intake Approval  5/23/2013 PASS
DetailsSam Zahorka