First Notice | | 12/27/2013 | 7/2/2015 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
Permanent Occupancy | | | 12/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
pat Phone #: ###-####
|
Zoning Approval | 12/10/2013 | 12/10/2013 | 12/10/2013 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 12/5/2013 | 12/6/2013 | 12/6/2013 | P | PASS |
Craig D. Hanson
|
|
|
No corrections
|
BLD-Other | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Tom Arcoraci
|
|
|
Sheetrock chanel - Pat Phone #: ###-####
|
BLD-Energy code compliance | 10/21/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Tom Arcoraci
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | PASS |
Tom Arcoraci
|
|
|
earlier the better - Pat Phone #: ###-####
|
Routing - MECHANICAL | 9/10/2013 | | 9/10/2013 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 8/16/2013 | 8/16/2013 | 8/16/2013 | P | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Footing | 8/14/2013 | 8/15/2013 | 8/15/2013 | P | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
OVERRIDE | | | 7/24/2013 | | |
|
|
|
|
Route to Impact Fee Review | 7/24/2013 | 7/29/2013 | 7/24/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 5/23/2013 | 7/24/2013 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2013 | | |
|
|
|
LM with Micah - permits ready fees given
|
Permit Ready to Issue | | | 7/24/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 7/24/2013 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 5/28/2013 | 5/28/2013 | 7/23/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - PLAN CHECK | 7/22/2013 | | 7/23/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2013 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 7/22/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets L-1, L-2, L-3; inserted by arch. rep. and taken back to Sam Zahorka.
|
Routing - PLANNING | 7/22/2013 | | 7/22/2013 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 7/12/2013 | | 7/16/2013 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/11/2013 | | 7/12/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 7/10/2013 | | 7/11/2013 | | PASS |
Todd Tucker
|
|
|
Site plan shows the building complies but the landscaping plan does not.
|
Routing - PLANNING | 7/9/2013 | | 7/9/2013 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not meet the conditions of approval of the DR application (DRH13-00081). The applicant shall: Provide a 20-foot setback from Irving and Colehaven for each building and carport, Provide a 15-foot rear setback for each building, Submit a detailed site plan that has been prepared by an architect, landscape architect, landscape designer working as a professional in this field or qualified nurseryman that meets the required landscape ordinance, submit details of the trash enclosures colors and materials for review and approval. All of these plans should be submitted to the DR staff prior to submitting for any construction permits.
|
Routing - PLUMBING | | | 7/8/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plan and 2013
|
Routing - Erosion and Sediment | 7/3/2013 | | 7/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Also see ESC13-00655 for permitting of 11.25 acres of development
|
Routing PW Solid Waste | 7/3/2013 | | 7/3/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2013 | | 7/3/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Reviewer's activity | | | 7/1/2013 | | DONE |
|
|
|
Emailed RP review.
|
Routing - FIRE | 6/24/2013 | | 7/1/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/1/2013 | | FAIL |
|
|
|
Failed - Public Works, ESC, Fire, Plan Check, Planning
|
Case Summary (BLD) | | | 6/24/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 6/6/2013 | | 6/24/2013 | | FAIL |
Sam Zahorka
|
|
|
Framing and Foundation do not line up. Need updated S-sheets with engineers stamp. Per redlines for 1/2 -hour fire rated open ended corridor.
|
Routing - PLANNING | 6/18/2013 | | 6/19/2013 | | FAIL |
Todd Tucker
|
|
|
The site plan does not comply with the conditions of approval for CUP13-00017.
1a. A 20 foot front setback and street side setback shall be provided for each building and associated covererd front porch. This includes any covered parking including carports.
1b. A 15 foot rear setback shall be provided for each structure including garbage can enclosures.
|
Routing - PLANNING Land Div | 6/18/2013 | | 6/19/2013 | | PASS |
Todd Tucker
|
|
|
Parcel is a platted lot in a recorded subdivision.
|
Routing - PLANNING | 6/18/2013 | | 6/18/2013 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not meet the conditions of approval of the DR application (DRH13-00081). The applicant shall: Provide a 20-foot setback from Irving and Colehaven for each building and carport, Provide a 15-foot rear setback for each building, Submit a detailed site plan that has been prepared by an architect, landscape architect, landscape designer working as a professional in this field or qualified nurseryman that meets the required landscape ordinance, submit details of teh trash enclosures colors and materials for review and approval. All of these plans should be submitted to the DR staff prior to submitting for any construction permits.
|
Routing - PLUMBING | | | 6/6/2013 | | FAIL |
Bill VanDegrift
|
|
|
see bld 13-01316 for review comments
|
Routing - Erosion and Sediment | 6/3/2013 | | 6/5/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
1. The City of Boise does not enforce federal regulation however, I am required to advise you of your obligation to seek or obtain necessary coverage under the NPDES Construction General Permit. Your construction projects appears to meet the definition of a common plan of development that will disturb greater than one acre. Please amend section 5 of the ESC plan to reflect the owners and operators duty to obtain NPDES coverage. We had some discussion on potentially reducing the size of your development. If you proceed with this, please submit revised plans reflecting this change.
2. The anticipated work schedule in the plans show work on all lots occurring simultaneously beginning in May and final landscaping completed in July. While speaking with you on the phone, you had indicated the projects will be phased. Please update the project schedules so they accurately depict this phasing.
3. The plan indicates that “Stockpiles will be placed on the vacant lots out of the public right of way”. Stockpiles that are a part of the construction activity must be stockpiled in the permitted area or otherwise shown on the map to include the additional disturbance in the permits.
4. The staging area, sanitary facility, and concrete washout must also be located in the permitted area or this additional area of disturbance must be included.
5. I did not receive appropriately sized plan maps for all lots. Commercial plan maps must be at least 18”x24” and I can accept 11”x17” for a single lot. I received appropriately sized plans for Lot 1/Block 1, Lot 2/Block 1, and Lot 3/Block 1. All other maps submitted were only 8.5”x11”. You may choose to eliminate the reference to a single lot by creating one map showing the entire disturbance area and associated BMPs lot and block if you choose.
The ESC narratives states that a stabilized construction entrance will be used for project vehicles and equipment to access each lot. A detail for the construction entrance must be provided and the construction entrance locations shown on the map
|
Routing - PUBLIC WORKS | 5/29/2013 | | 6/3/2013 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 5/31/2013 | | 5/31/2013 | | FAIL |
Peter J. McCullough
|
|
|
|
Routing - Addressing | 5/28/2013 | | 5/29/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCM | 5/28/2013 | | 5/28/2013 | | DONE |
John Menard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/28/2013 | | |
|
|
|
|
Intake Approval | | | 5/23/2013 | | PASS |
Sam Zahorka
|
|
|
|