Description
(BCD TRAVEL Suite 220) The permit is for tenant improvement work, consisting of selective remodel of existing office space. The scope of work to include; demolition and new construction of nonbearing partition walls and doors. No plumbing. HVAC and lighting are existing. This building is fire sprinklered to allow all exit stairways from the 2nd floor to be open and to allow nonrated corridors. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference12/28/201512/28/201512/28/2015PDONE
DetailsMike Jordan
Need to know if Visions Building is occuping the space. Brittany at Permits Thanks Mike. tenant is still occupying space.
BLD-Final7/17/20137/18/20137/18/2013APASS
DetailsJim Storey
Matt Phone #: ###-####
FIRE-Final Inspection7/17/20137/17/20137/17/2013PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in6/26/20136/26/20136/26/2013PPASS
DetailsMike Jordan
Matt Hall Phone #: ###-####. Interior steel stud walls only ok.
Print Occupancy Form  6/18/2013 DONE
DetailsChristina Prado
Telephone call  6/4/2013 DONE
DetailsChristina Prado
emailed Lisa fees due after received revised Cert of value and GC form
Permit Ready to Issue  6/4/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  6/4/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  6/4/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)5/30/20135/30/20136/3/2013 PASS
DetailsAdele J Schaffeld-Griffin
Due 6-5 Level 1 TI E plan
Routing - PLAN CHECK5/30/2013 6/3/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  6/3/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/3/2013 DONE
Intake Approval  5/30/2013 PASS
DetailsAdele J Schaffeld-Griffin
Payment Received  5/29/2013 DONE
Payment received via Govolutions
Application received  5/24/2013 DONE
Application submitted via PDS Online on May 24 2013 4:47PM