Information based on query as of Thursday, July 25, 2024.
Permit Information
Permit NumberBLD13-01373
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 2702 E RHYOLITE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 4863 sq. ft., two story (first story 2433 sq. ft., basement 1417 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 640 sq. ft. of covered patio/porch and a 1013 sq. ft. attached garage per the approved plans, prescriptive energy, attached engineering, plan review report and any notations. R-1A/DA zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/29/201310/31/201310/31/2013PPASS
DetailsDave Hannah
BRIAN Phone #: ###-####
DOC - Permit Finaled10/31/201310/31/201310/31/2013PPASS
DetailsDave Hannah
PubWorks Occupancy Approval10/31/201310/31/201310/31/2013 DONE
DetailsJason C. Taylor
Recieved approval letter from civil engineer approving grading and drainage. Project has been stabilized and ok for occupancy. Jason Taylor ###-####
BLD-Energy code compliance8/29/20138/30/20138/30/2013PPASS
DetailsDave Hannah
bryan Phone #: ###-####
BLD-Framing/Rough-in8/27/20138/28/20138/29/2013PPART
DetailsDave Hannah
bryan - call hour prior Phone #: ###-#### c/n on site ok to insulate and shear ok to cover ext
BLD-Wall Bracing8/23/20138/26/20138/26/2013APART
DetailsMike Jordan
bryan Phone #: ###-####. Remove paper from exterior wall, installmissing blocking. recall for inspection.
BLD-Foundation7/2/20137/3/20137/3/2013APASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Footing6/24/20136/25/20136/25/2013APASS
DetailsDave Hannah
eric Phone #: ###-####
PubWorks Subgrade Approval6/24/20136/24/20136/24/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer for the entire building footings. Building department may be scheduled for footing inspections. Jason Taylor ###-####.
OVERRIDE  6/17/2013  
Telephone call  6/17/2013 DONE
DetailsTisha Gallop
called Doug Lasher Const and left vm permit is ready and fee.
Issue PAID IN FULL permit  6/17/2013 DONE
DetailsChristina Prado
Routing PW Grading-Hillside6/17/2013 6/17/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Inspection Record Card- Bld  6/17/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  6/17/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)5/30/20135/30/20136/14/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed / Due 6/17 Hillside
Routing - PLAN CHECK6/14/2013 6/14/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  6/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/14/2013 DONE
Inspection Record Card- Bld  6/14/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/14/2013 DONE
DetailsTisha Gallop
1st review completed  6/13/2013 FAIL
DetailsAdele J Schaffeld-Griffin
comments faxed 6/13/13
Plan resubmittals received  6/13/2013 DONE
DetailsChristina Prado
Received two sets of plans marked A-104, A-105, A-106, A-107, S105 & S106; Plan taken to Adele for further review
Routing - PLAN CHECK6/7/2013 6/12/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see documents for plan review letter
Routing - FIRE6/4/2013 6/7/2013 PASS
DetailsScott Arellano
Approved with no comments.
Routing - Erosion and Sediment6/4/2013 6/4/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL5/31/2013 6/4/2013 PASS
DetailsTroy James
Routing - PLANNING5/31/2013 5/31/2013 PASS
DetailsSusan Riggs
CFH13-00014-Susan Riggs
Plan resubmittals received  5/31/2013  
Received 1 copy of sheet C1 and inserted into plans
Routing - PUBLIC WORKS  5/31/2013 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside5/30/2013 5/30/2013 FAIL
DetailsJason C. Taylor
Missing additional grading plans. Applicant to submit additional copy for approval. Jason Taylor ###-####.
Routing - Addressing5/30/2013 5/30/2013 PASS
DetailsJason C. Taylor
Route to Impact Fee Review5/29/20136/3/20135/29/2013 PASS
DetailsJames McMahon
Application received 5/29/20135/29/2013 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  5/29/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  5/29/2013 DONE
DetailsBarbara Stitt
Intake Approval  5/29/2013 PASS
DetailsBarbara Stitt
Due 6-17 Hillside